140 Type Aluminum Frame Formwork for High Building
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 200 m²
- Supply Capability:
- 80000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of 140 Aluminum Frame Formwork
140 Aluminum slab formwork system consists of two parts: steel props system with alu-frames. The material of this aluminum is with high standard 6351T6/6082T6 and steel prop material Q235. 140 alu-frame formwork consists of different panel sizes. The panel could be working with plywood or plastic plywood as well.
2. Main Features of 140 Aluminum Frame Formwork
-The complete formwork system for slab casting, easy & quick assembly.
-Light panel weight, easy to carry.
- Economical, versatile & hi-speed formwork system; comes with a permissible slab thickness of 400 mm.
- Working efficiency is greatly improved by fast erection and dismantlement.
- The panel can be supported by both props and scaffolding.
3. 140 Series Aluminum Frame Formwork images
4. 140 Aluminum Frame Formwork Specifications
5. FAQ of 140 Aluminum Frame Formwork
1) What can we do for you?
.We can ensure the quality of the140 Aluminum Frame Formwork and avoid extra expenses for customers.
.We can provide you the professional technical team.
.We can provide professional building proposal for your projects.
2) What promises can be done by us?
. please feel free to write us for any QUOTE.
. If need any technical and building assistance, we could provide on-site professional staff for instruction.
. Please DO check goods when courier knocks your door and contact us asap if any issues.
3) What about of our after-sale services?
. Response will be carried out in 24hours after receiving any complain or request.
. Any formwork cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
4) What about the package and shipping time?
.Packing: wood package and adhesive tape
.Shipping: by sea
Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.
- Q:How does the vertical template at the suspension stand?
- Outside the wall perpendicular to the deviation, the roof template acceptance to be stretched to see flatness, template patchwork, template support and template is clean.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
140 Type Aluminum Frame Formwork for High Building
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 200 m²
- Supply Capability:
- 80000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords