Whole Alumimum Panesl for Wall or Slab Formwork of CMAX BRAND
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m²
- Supply Capability:
- 1000000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Whole Aluminum Formwork Description
the Aluminum system has been designed to be capable of forming all the concrete in a building: all walls(external and internal), floor slabs, columns, beams, stairs, window hoods,curved sections and intricate decorative features; whilst at the same timebringing to field construction all the benefits of a factory "assemblyline" construction process which is the hallmark of precast concretesystems, but without the deficiencies and disadvantages or precast. the Aluminum system produces lowcost and quality work at maximum rates of production utilising unskilled wrkers.
2. Main Features of Whole Aluminum Formwork
- lightweight anda highly efficient work schedule
-can be used for about300 times
-conventional
3. Whole Aluminum Formwork Images
4. Whole Aluminum Formwork Specifications
whole alumimum formwork is used for the concrete pouring of square or rectangle column. The system has the same structure and similar connection type with wall formwork.
5. FAQ of Whole Aluminum Formwork
1) What can we do for you?
.We can ensure the quality of the Whole Aluminum Formwork and avoid extra expenses for customers.
.We can provide you the professional technical team.
.We can provide professional building proposal for your projects.
2) What promises can be done by us?
. If interested in this kind of formwork, please feel free to write us for any QUOTE.
. If need any technical and building assistance, we could provide on-site professional staff for instruction.
. Please DO check goods when courier knocks your door and contact us asap if any issueS.
3) What about of our after-sale services?
. Response will be carried out in 24hours after receiving any complain or request.
. Any formwork cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
4) What about the package and shipping time?
.Packing: wood package and
.Shipping: by sea
Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.
- Q: How does the vertical template at the suspension stand?
- Specifically, you can refer to the template specification above a detailed description of the roof template can also refer to this specification. Rebar acceptance is mainly to check the type of steel, diameter, anchor, lap, the number, location, arrangement, etc., steel acceptance can refer to the Atlas 03G101-1
Send your message to us
Whole Alumimum Panesl for Wall or Slab Formwork of CMAX BRAND
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m²
- Supply Capability:
- 1000000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches