• 0.3m 3 Hoe Bucket of Excavator WZ30-25 for Sale System 1
  • 0.3m 3 Hoe Bucket of Excavator WZ30-25 for Sale System 2
0.3m 3 Hoe Bucket of Excavator WZ30-25 for Sale

0.3m 3 Hoe Bucket of Excavator WZ30-25 for Sale

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick details:

Condition: New

Model Number: wz30-25 snow shovel

Place of Origin: Liaoning, China (Mainland)

Type: Backhoe Loader

Moving Type: Crawler Loader

Rated Load: 2 ton

Certification: CE, GOST-R

Warranty: 6 months or 1200 hours

After-sales Service Provided: Overseas service center available

Engine power: 65 KW


characteristics of 3ton wheel loader :

  1. Adopt Cummins 6 cylinder engine with 97KW output power and high torque, strong excavating capability.

  2. Full dydraulic steering system, merging of double pump, energy saving and high work efficiency.

  3. Increase the counterweight, improve the stability and bearing capacity of the complete machine.

  4. Reinforcement structure. Strengthened front and rear frame.

  5. Joystick control realized precise operation, air conditioner are option.

  6. Joystick control realized precise operation, air conditioner are option.

specification of the wheel loader:


0.3m 3 Hoe Bucket of Excavator WZ30-25 for Sale

0.3m 3 Hoe Bucket of Excavator WZ30-25 for Sale

0.3m 3 Hoe Bucket of Excavator WZ30-25 for Sale

0.3m 3 Hoe Bucket of Excavator WZ30-25 for Sale

0.3m 3 Hoe Bucket of Excavator WZ30-25 for Sale

0.3m 3 Hoe Bucket of Excavator WZ30-25 for Sale

0.3m 3 Hoe Bucket of Excavator WZ30-25 for Sale

FAQ:

1.How about the shipment?

1. The loader machine load one 40HQ container.

2. The loader disassemble into 3 parts, major machine, bucket and cabin.

3. Before shipment, we have done the rust-proof and antiseptic treatment.


2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.


3. What Can we Do For You?                                                                 

1. During the period of 12 months or 2000 working hours warranty, Chaogong factory are responsible for maintenance and replacement of spare parts.

2. We attend the machinery exhibition in your country and please contact us when we are with you at that time and solve the problem you have.

3. For the sole agents, we will go with senior engineer to your country and offer the technical service. 

Q: Also, any suggestions for a title?Placid breezeBrushing against the windowBrilliant watersRelocating the sandLike a bulldozerIridescent sunshinePalpably reflecting off the sandOne complacent ownerCapturing this sceneryIn photographs, visual or writtenHundreds and hundred of miles awayLies a manHuddled in many layersOf blankets and coatsWith snow piling by the secondThis is not a winter wonderlandOne complacent owner meetsOne freezing manTogether they switch livesAnd shall they not become corrupted
I think that it's great! very deep and meaningful and i love the emotion of it! The only thing that i would comment on that i felt let it down (quite alot) was the structure of the poem. I'm not sure whether caezura is needed (punctuation at the end of lines). Maybe like: Placid breeze, Brushing against the window. Brilliant waters, Relocating the sand./; Like a bulldozer. Iridescent sunshine, Palpably reflecting off the sand. ? Maybe? Or... have you ever read any of Heaney's poems? I like the way that the structure of the poem stretches across the page (especially when it creates an image of what the poem is about) E.g. Hundreds and hundred of miles away Lies a man Huddled in many layers ....................... Of blankets ........................................... and coats With snow piling by the second This is not a winter wonderland ...kind of like this. (soory about elipsis marks btw, ignore them, wouldnt go right otherwise!) Like when you have to pause very slightly to find the words, it kind of has the same effect as punctuation but doesnt ruin flow. I split the line there to signify the layers that the man is hudded in. So now the imagery is layers, the form is layers and your poem may have layered meanings im sure. I hope this helps... otherwise... the more i read it, the more entranced i get! :)
Q: I just need to know the earthworks part?Any steps on the method would be greatly appreciated. This is for a highway type road. I cant seem to find any information on this.Any ideas on the plant required too would be great!Thanks very much
they grade the road with bulldozers and graders all the while using surveying equipment to make sure that the road base will have the correct path, pitch and form
Q: What is the cheapest site to buy Bulldozer XL5000 from? I currently buy it from a local Nutrishop store.
Target or Burlington Coat Factory---I went into BCF the other day to look for my cousin some stuff for her baby boy that is going to be here soon and they had packs of five onsies for about $14 and were on sale. This may sound funny but I get most of mine at garage sales. I have found some of the best brands (Baby Gap, Old Navy, Gymboree, etc.) for the best prices and I have TONS of garage sale clothes. That would be my other suggestion.
Q: Do you have to go to a specialized school? I can't find anything on the internet except for a school called ATS, which has no locations near where I live. There has to be some other place to get training for a CDL and heavy equipment. Any ideas?
there is one in NH and one in skowheagan ME for heavy equipment, cdl you can go to any truck driving school, they are everywhere just type in cdl and the state where you live it will come up with some, some companies will pay you to learn to drive out west. the laws are differnt in everystate, you may not need a license in yours.
Q: rate on scale 1-0 u can change the names if u wannaBig Show Rey Mysterio= Over ComersJohn Morrison John Cena= Double JohnsMark Henry The Great Khali= G.O.D= Giants of Destruction (idk y ppl make up wierd tag teams that dont make much sense)Tyler Reks Ezekiel Jackson= Bulldozers (idk!)Finlay Sheamus= Irish men
Big Show Rey Mysterio= Over Comers= 8,/10, but don't like the name. The reason I would say 8/10 because imagine a 619 into a Chokeslam into a Top Rope Plancha. It would be amazing!!!!! John Morrison John Cena= Double John's= 10/10, but hate the name. 10/10 because imagine a AA then follow that up with a Starship Pain. It would also be amazing. Mark Henry The Great Khali= Giant's of Destruction= 3/10= I could imagine it as a stable but only to fued with the Brother's of Destruction, 'cause they would be pretty boring and after there fued with BOD and they split up. Tyler Reks Ezekiel Jackson= Bulldozer's= 4/10= I would actually prefer Reks Masters or Masters Jackson to be the Bull Dozer's but it is your opinion and it is a okay one. Finlay and Sheamus=Irish Men= 9/10, I don't like the name, but if you could come up with a different name it would be 10/10, 'cause Sheamus Finlay would be excellent.
Q: When I said i could get the job done in a week, i was assuming i would have 2 more bulldozers. with the bulldozers i have, i would have the job done in 8 days. but now all my bulldozers are out of operation except 1. now I'll probably be weeks late. with all the information obtained is it possible to find out how many weeks late the engineer would be. find the result or alternatively state conclusions that would lead to the answer.
It seems appropriate to assume that the number of days to do the job is inversely proportional to the number of bulldozers available. So if n were the number you had, you would say that C/n = 8, where C is a constant. You also know that C/(n+2) = 7. Thus, 8n = C = 7(n+2), or n = 14. Now you can find C, and the rest is easy.
Q: (1 bulldozers, 1 grader, 2 sets of rollers, some truck) 1 days (1 day 8 hours) can fill how many normal?
The range is too big, you work faster, fill height and site foreman command
Q: I'm somewhat new to PC gaming and I have no estimate on how rapidly prices will drop on the Phenom II Processors during Bulldozer release. Should they go down instantly or slowly in a couple of months, and how much would they go down? By $25, $50, or even $100?
By $25
Q: Destroy-vey: If you owned your own bulldozer, what's the first thing you'd destroy?
The porn store by me, Then build a bigger one.
Q: the Palestinians too?under the tracks like Dogs or sub-humans!!!
Once in a while when one throws himself under the tracks, yes.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords