YHX Single Layer Suspended platform
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 99 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Guangdong Yuhuaxing Construction Machinery Manufacture Co., Ltd., established in March 1997, is a private enterprise specializing in R&D, designing, manufacturing, selling and leasing of construction machinery. Headquartered in Baiyun District of Guangzhou, it is the council unit of Decoration and Aerial Work Machinery Branch of China Engineering Machinery Industry Association and a member of Guangdong Standardization Association, mainly producing builder hoist, mast climbing work platform, superdeck loading platform, temporary suspended platform, building maintenance unit etc.
ZLT250 Single Layer Suspended platform for Elevator Installation?xml:namespace>
Description of ZLT250 Single Layer Suspended platform for Elevator Installation
It is a kind of special suspended access equipment powered by advanced motor systems. Such kind of temporary access platform is particularly designed for installing and repairing elevators of high buildings.
Key Features of ZLT250 Single Layer Suspended platform for Elevator Installation
-easy to handle
-safety devices installed
-no need to install extra scaffolding
-excellent working efficiency
- manufactured to the latest GB19155-2003 National Safety Standard
- minimal space is required for transportation and storage
- relatively low self-weight
Main Technical Parameters of ZLT250 Single Layer Suspended platform for Elevator Installation
Item Parameters
Rated working load 250kg(551 lb)
Descending and ascending speed 8-10m/min
Platform dimensions (width)*(depth) *(height) (mm) 1360×1360×3700
Steel wire model Specially made wireφ8.6
HoistRated lift capacity 7.84KN
Motor model YEJ100L-4
Power 2.2KW
Voltage 380V
rotate speed 1420rpm
break torque 15Nm
Safety lock Wallop permitted 30KN
Tilt angle permitted 3°-8°
Dead weight About 250kg(551 lb)
Overall weight About 250kg
Distance between main tracks(mm) L1≥1700mm
Width of the lifting machine room(mm) L2=2200-2400mm
Distance between the lifting top points and the floor L3=1210mm
- Q:How to grasp the proper use of basket
- The first point is must pay attention to grasp the good plan targeted and feasibility, can not speak generally, should be based on the specific construction scheme, the use of a good grasp of the building to building basket, the basket cover the entire face, do not stay dead, so as to guarantee the safety of.
- Q:Who has the acceptance specification and standard for gondola?
- 6) strengthen safety education for operators, and enhance their awareness of self-protection. Hanging basket operator must pass training, qualified rear mount, hanging basket must be operated by special personnel according to operating procedures. Construction personnel must enter and leave the basket on the ground, no entry and landing basket in the air. 7) the quantity of the counterweight block must meet the requirement (usually 2*20*25kg), and the counterweight block shall be firmly fixed to prevent the personnel from moving the counterweight blocks at will.
- Q:Counterweight requirement of basket
- 1) the hanging mechanism of the hanging basket or the roof trolley must be equipped with proper counterweight; (2) the counterweight shall be accurately and firmly installed on the focal point, and the counterweight shall be configured according to the drawing specifications
- Q:Construction; basket; detection proportion
- Hello, height operation basket also belongs to construction hoisting machinery. "Construction crane safety inspection procedures" refers to the construction of lifting machinery, refers to the housing construction sites and municipal engineering sites used tower cranes, construction lifts and high operating basket. Therefore, in accordance with the requirements of the construction, lifting equipment installation, must be commissioned by qualified units for testing and acceptance. According to the regulations, the height hanging basket is the same as the tower crane and the construction elevator. Before installation, it must be checked and accepted before being put into use
- Q:What issues should I pay attention to when removing the galvanized basket?
- 1, before the demolition of the basket to conduct a comprehensive inspection, record damage. 2. Park the platform on the flat ground and remove the rope and tie down the iron. 3, the power cut off Lida electric basket.
- Q:What is the cause of the fall of the gondola?
- 1, first of all, high-altitude hanging basket, the basic reason for falling height is that the safety check is not in place, failed to detect hidden dangers. In the scaffold erection and removal and operation process of casualties in the attack on the scaffold, most of the problems against the technical standards and operational procedures, but the construction site of the project manager, foreman, full-time staff in regular safety inspection, safety inspection found problems usually, and are not, or not timely find problems the rectification and correction of attack accident obligations.
- Q:Decoration engineering, external wall hanging basket to do information? What type of data?
- Sure answer: to do information. Is the main security information, basket approach to inspection, inspection reports, a basket of the certificate, inspection certificate, the basket is installed to fill basket enabled application, supervision and other relevant person in charge of acceptance into use. In addition, we should also provide a plan for hanging baskets.
- Q:How many kilograms weight can the basket hold?
- ZLP630 hanging basket: 1) platform length: 6 meters (2 meters + 2 meters + 2 meters 2) load: 630 kg 3) motor power: 1.5 kW
- Q:How much money one day rental basket
- The rent has now transparent basket, unless the standard requirements and special construction environment is difficult, the general term of three months rent by 50 to 70 yuan / day, plus installation and disassembly fee (according to the site environment and the height and the auxiliary facilities set), freight by distance meter, according to the amount of testing fee by region. One month per month, 5 dry basis, two monthly, 7 thousand base
- Q:What qualification does the hanging basket for production and construction require?
- 1, basket company qualification certificate 2, basket holder certificate 3, basket installation program 4, use the basket in the construction process of emergency plan (two copies, construction unit out one, labor service one)
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
YHX Single Layer Suspended platform
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 99 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products