Safe suspended platform cradle ZLP630 2m*3 sections
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 1000 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Safe suspended platform cradle ZLP630 2m*3 sections
1) Quick Detail:
1. Model No.: ZLP630
2. Brand Name: HAOKE
3. Material: Steel / Aluminum
4. Appearance: Plastic Spray Painted / Hot Galvanized
5. Capacity Loading: 630 KG
6. Lifting Height: Maximum 300 Mts
7. Counterweight: Concrete, Concrete with steel cover, Iron
8. Voltage: 220V,380V,400V,415V,440V ,3-phase.50HZ/60HZ
2) Applications:
1.Cleaning and maintaining of the exterior wall of high-rise building.
2.Painting, decoration and refurbishing of exterior walls.
3. Installation projects and other construction working of outer walls of high-rise building.
4. Aerial working of ship, large tower, bridge, dams and large chimneys.
5. Install and maintain for high-rise building elevator hoistway, shipbuilding industry, seagoing vessel, warships welding maintain.
4) Specifications:
Model No. | ZLP630 | |
Rated load(kg) | 630 | |
Lifting speed(m/min) | 9~11 | |
Motor power(kw) | 2×1.5, 50HZ/60HZ | |
Brake torque(Km) | 16 | |
Steel rope angle adjusting range(°) | 3°- 8° | |
Distance between two steel rope(mm) | ≤100 | |
Rated stretch of front beam(mm) | 1500 | |
Suspending Platform | Locking | Aluminum alloy |
| Nr.Of platform rack | Single rack |
| Nr.Of platform | 3 |
| L×W×H(mm) | (2000×3)×690×1300 |
| Weight(kg) | 375 Kg |
Suspending mechanism(kg) | 2×175 Kg | |
Counterweight(kg) optional | 25×36pcs | |
Diameter of steel rope(mm) | 8.3 | |
Max Lifting height(m) | 300 | |
Motor rotation speed(r/min) | 1420 | |
Voltage(v) 3PHASES | 220V/380V/415V (customized) |
5) Parts of suspended scaffold platform:
1. Platform(basket): Steel or Aluminum Alloy (painted or hot galvanized)
2. Suspension Mechanism: Steel (painted or hot galvanized)
3. Electric hoists:LTD6.3 or LTD8
4. Safety Lock: LST30
5. Electric control box: Along with hoists
6. Steel wire rope: 8.3mm ,8.6mm or 9.1mm
7. Safety rope: 18mm,20mm
8. Electric cable: 3*2.5+2*1.5
9. Counterweights: Cement , cement with steel cover & Iron counterweight
10. Spare parts
6) Competitive advantages:
1.Absolutely guarantee life safety during Aerial working
Safety lock fasten the steel rope immediately once the suspended platform tilts or the steel rope slips out of the hoist;
Electric control system is designed with leakage protection, over-heat protection, current overload protection and brake stop;
Good-quality steel wire rope, safety rope and cable.
2. Stable performance: raise up and lower down smoothly
3. Modular design. Easy to disassemble, assemble operate and maintain.
4. Lifting height can be adjusted according to requirement (Maximum 300 Meters)
5. Working voltage and frequency can be adjusted (220V/380V/415V etc.)
6. Suspended platform for special usage can be customized (circular, L shape, U shape, etc)
7. Professional quality, competitive price, fast delivery, good services.
- Q: Calculation of engineering quantity of electric hanging basket
- According to the vertical projection area of the wall, the height shall be designed from the outdoor floor to the top of the outer wall, and the length shall be calculated from the outer perimeter of the outer wall
- Q: Construction basket project whether need expert proof?
- Each of the 8 baskets is supported by a simple beam, and a B type bracket is used at both ends of the basket to prevent lateral movement of the walking board. The middle two supports are A type. First, N1, N2 and N3 are welded together into A type brackets. N1 and N3 are welded into B type brackets, and then welding pads and diaphragms are respectively welded on type A and B type brackets. Support production is completed, according to the "standard" railway bridge protection coating on steel, anti-corrosion treatment, namely special Hongdan oil once, grey lead oil two
- Q: What is the cause of the fall of the gondola?
- 2, the emergence of such accidents for the second reasons for the high hanging basket operations staff awareness of the weak, poor self maintenance, risk violation operations. One is jiazigong engaged in scaffolding and withdrawal, not according to the rules of right to wear safety helmet and safety belt. Many workers rely on "daredevil", too cumbersome, not wearing a hat that peace or not fasten safety belt, only need to take care of some will happen, which leads to high fall accidents have occurred.
- Q: Decoration engineering, external wall hanging basket to do information? What type of data?
- Sure answer: to do information. Is the main security information, basket approach to inspection, inspection reports, a basket of the certificate, inspection certificate, the basket is installed to fill basket enabled application, supervision and other relevant person in charge of acceptance into use. In addition, we should also provide a plan for hanging baskets.
- Q: Who knows the construction basket reported those information?
- 1., basket mounting and dismantling units of enterprise business license, enterprise qualification certificate, project manager post certificate and safety assessment B certificate, security personnel safety assessment C certificate; special work certificate;
- Q: Hanging basket operation 'Ten' is not allowed
- 1., no operation permit personnel operating basket; 2. is not allowed in more than six strong use of gondola; 3. is not allowed in the thunder or heavy rain, storm weather use hanging basket; 4., not in the snow angels hanging basket;
- Q: How many kinds of basket are there?
- Now there are some special buildings Rieter construction basket basket, for example: L type, U type, round type, fan type etc.. Special-shaped building basket needs professional customization.
- Q: Request a basket construction quota
- The use of construction basket wall repair and brushing the wall paint, how to calculate the cost of measures (experts). According to the actual situation, the selected quotations, such as scaffolding construction, construction measures should apply scaffolding quota items. Such as hanging basket construction, it should be calculated by the use of basket construction measures
- Q: Is it true that free baskets are offered to friends?
- Anyway, my friends and leadership should be true and false! My relatives first did not lead to change numbers, they said, and some let the salesman himself accepted
- Q: How many kilograms weight can the basket hold?
- ZLP800 hanging basket: 1) platform length: 7.5 meters (2.5 meters + 2.5 meters + 2.5 meters) 2) load: 630 kg 3) motor power: 1.8 electric basket: 6 meters. Type 630.
Send your message to us
Safe suspended platform cradle ZLP630 2m*3 sections
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 1000 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords