• Weihai Wanfeng Tower Crane QTZ320 System 1
  • Weihai Wanfeng Tower Crane QTZ320 System 2
  • Weihai Wanfeng Tower Crane QTZ320 System 3
Weihai Wanfeng Tower Crane QTZ320

Weihai Wanfeng Tower Crane QTZ320

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Weihai Wanfeng Group is located in Manshan Town, Weihai City-Model Town of National Small Town Construction, where

traffic is convenient and industry is developed.
  Weihai Wanfeng Group, originally founded in 1995, is one of the first enterprises that restructured in Wendeng City

in 1997. The present group company was founded in 2003 and composed of four companies-Wanfeng Steel Structure, Wanfeng

Door & Window, Wanfeng Leasing and Yifeng Properties. It has 400 staff, fixed assets of about RMB70 million and land

area of 90,000m2. Main products include FO/23B, 7030, QTZ125, QTZ80, QTZ63, QTZ40 and QTZ315 series tower crane,

construction lifts and material elevator, as well as construction steel structure and high-grade aluminum-plastic doors

and windows. Its products are sold in more than 10 provinces and cities in China and over 20 foreign countries.
  Weihai Wanfeng Group is Top 10 Tower Crane Enterprises of Shandong Province, Top 100 Private Enterprises of Weihai

City, Top 20 Enterprises of Wendeng City, "AAA" Level Banking Credit Enterprise, Provincial-level Advanced Equipment

Management Unit, Provincial-level "Contract Honored and Promise Kept" Unit and Top 100 Provincial-level Honest

Enterprises. "Wanfeng" trademark was rated as Shandong Famous Brand, and Wanfeng tower crane is honored Shandong Brand-

name Product.
  Weihai Wanfeng Group has always been adhering to the business tenet of "quality first, credit first", regarding

customers as God and workers as source of development, paying attention to technology development, service and product

quality, introducing and innovating brand products, and injecting endless vigor and vitality to the company development.
  Weihai Wanfeng Group has strong technical force and excellent testing equipment. In 2001 it passed IS09001: 2000

Quality Management System Certification, and enhanced both management and service quality. With China's entry into WTO,

Wanfeng Group keeps an eye on the world development and continuously expands foreign markets. In 2004, its products

entered the international market, in 2006 took the lead to achieve license to enter the Russian market, and in 2007

passed CE certification and opened the door to the EU market, winning favorable opportunity for construction in foreign

market. With good reputation and services, our products attracted are more and more foreign customers.
  After nearly 10 years of development, Wanfeng Group has developed into an enterprise engaged in multi industries-

construction machinery, construction steel structure, building doors and windows, and real estate. The opening Wanfeng

Group always marches ahead.
Mr. Ma Shangquan, chairman of Wanfeng Group, said, "We serve your need, and promise to meet your satisfaction", and

welcomes cooperation with old and new customers to expand business opportunities and seek common development.
  The developing Wanfeng Group will continue to innovate and take part in market competition both at home and abroad

with confidence and determination, produce newer and better products based on self-encouragement and strict management,

and strive in the new century future development to accept the challenge.

Q: I found part of her story online, but can't find anything as to what happened to the 1000+ paper cranes she made before she died. Were they given to family members or given to a museum? Or have they been destroyed by time? I would feel terrible if all her work was destroyed by time or worse. :-(Thank you so much for answering.Peace.
I'm glad somebody remembers Sadako. But yo, i don't know.
Q: Or what style? ?
I okorder / Gung Gee Fook Kuen: Taming The Tiger Fu Hok Sueng Ying Kuen: Tiger and Crane Double Form Tiet Sin Kuen: The Iron Thread
Q: who invented cranes?
It is true that it is lost in the mists of time but I think I read it somewhere that it that Clarence A. Crane invented the crane.
Q: is the elevation of the upper surface of the tower crane foundation flat with the elevation of the bottom of the new building? Or lower than the trough bottom elevation? ThirtyI think this is better. Please specify which specification has the relevant regulations. Which page is it? Thank you very much!
When the tower crane is installed in the fertilizer tank, is the elevation of the upper surface of the tower crane foundation flat with the elevation of the bottom of the new building? Or lower than the trough mark
Q: Its on of the biggest helicopters in 1952-1955 I just need any information via you, internet, or even blue prints!I highly doubt that blueprints are probably destroyed
It never really took off as it was quickly replaced by the CH-54 Tarhe, but here is what I found…
Q: How do tower cranes rise?
The weight and concrete foundation shall be made in advance and marked, and the ground ground endurance shall be no less than 20T per square meter. The chassis and standard sections are then assembled on this basis. The standard section of tower crane is the main part of the main part of tower crane. It is also the main role of heightening the height of tower crane". In the construction process, tower crane accompanied by the rise of buildings, naturally need to heighten. When the tower is hoisted, the upper frame is raised upwards with the jack up, so that there is a space between the tower body and the frame, and the standard section of the tower body is installed in the space. In this way, the purpose of the tower crane is realized.
Q: How many tons are tower cranes QTZ125?
The performance parameters and technical indexes of this machine are up to or better than the national standard. The maximum working range is 65m, height is 50m independent, attached type lifting height up to 180m, the maximum working range of 65 meters, the rated lifting torque 1200kN - M.The machine parameters is advanced, reliable performance, beautiful appearance, good quality, simple and practical structure, equipped with advanced safety device, convenient maintenance, safe use, reasonable price, is the ideal construction machine for construction enterprises.
Q: Building a new skyscraper? Tearing down the old Mellon Arena?
PITTSBURGH -- Construction is continuing downtown on the new, 30-story Three PNC Plaza, which is scheduled for completion later this year. On Saturday, a giant crane from Philadelphia was brought to the construction site on Fifth Avenue to hoist massive steel girders into place. The girders weigh more than 89,000 pounds and will support a third-floor ballroom.
Q: No inspector would intentionally overlook a dangerous existing situation re: crane usage in a major city---so what went wrong--never before has this happened and now two majjor incidents?
I think they are accidents. Unfortunately people who work for the city government - at least in NY - are incredibly incompetent and corrupt. What makes you say that No inspector would intentionally overlook a dangerous existing situation ? That 's exactly what the inspector of the first crane collapse did. Oops, my mistake. He didn't check the cranes at all. And all those people who died recently in construction by being blown off by wind from great heights??!! I have never heard anything like that before. Who gives these people the necessary permits?? How trained are these people? Where is their union?
Q: We see lots of cranes doing some heavy lifting during construction. But how do they get so high up these buildings? And when construction is nearly done, how do they go back down?
Depends on the building of course. Either a taller crane is brought in to lift them, or they're lifted by helicopter. And sometimes a building effectively builds itself, and the crane moves up with the construction platform after being constructed at ground level. Will still need a helicopter to remove it of course.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords