Villa of Prefabricated Light Steel House Cheaper for Fast Installation and High Safety
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m²
- Supply Capability:
- 10000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Description of Sandwich Panel House :
Structure is reliable: Light steel structure system is safe and reliable, satisfied modern architecture concept.
Easy assembly and disassembly: The house can be assembled and disassembled many times, used repeatedly.It just need simple tools to assemble. Each worker can assemble 20~30 square meters every day. 6 worker can finish 300sqm prefab house in 2 days.
Beautiful decoration: The prefab house is beautiful and grace, have bright and bland colour, flat and neat board, with good decoration effect.
Flexible layout: Door and window can be assembled in any position, partition wall panel can be assemble in any transverse axes sites. Stair is assembled in outside.
Using life: All the light steel structures have antisepsis-spraying treatment. The normal using age are above 15 years.
Environmental protection and economy: Prefab house design is reasonable, easy to assemble and disassemble, used circularly, low wastage, without building rubbish. Average using cost is less than other kinds of building annually.
2.Features of Sandwich Panel House :
1) Environmental Benefits
Energy saving - heat transfer coefficient k=0.24w/sq.m.k
Avoid thermal bridge in walls, floor and roof
Water saving - more than 90% saving
Low waste - no pollution
Sound insulation: walls-51db, ceiling-78db
Use almost entirely recyclable materials
Low dust pollution - in city construction
2) Benefits in Construction
Efficient use of architectural area - 8-10% improved space usage
Anti-earth quake - soft and light structure reduce the influence of earthquake
Anti-wind - strong structure
Light self-weight - lighter than 1/4 - 1/6 of traditional reinforced concrete structure
Builds up to 4-6 floors
Extended choice of external decorative finishes
3)Financial Benefits
Lower price - lower capital investment 2-3 times faster than traditional reinforced concrete structure
No limit to land surface and efficient use of land
Highly durable -long life
3.Sandwich Panel House Images:
4.Specifications of the Sandwich Panel House:
Light steel structure villa specification | ||
Key Features | Item Title | Materials Description |
House body | Main structure | Light Steel Structure, steel column, Structure board |
Exterior wall decoration | 90 steel stud, glass wool, 10mm calcium silicate board, moisture-proof film, 19*50 steel stud, fiber cement board, exterior wall water-proof | |
Roof/Cornice | Roof: Single-layer bituminized tiles, 3mm SBS water-proof rolling material, 15mm OSB board | |
Rain carrying system | PVC rain carrying system | |
Doors and windows | Security door, paint-free door, glass door, plastic steel window, artificial marble | |
Finishing | Interior wall decoration | Ceiling grid, second floor 75*2 glass wool, first floor 75mm glass wool, waterproof moisture-proof membrane, 9.5mm plaster board, putty paint |
Interior ceiling | Fire proof gypsum board, putty and paint | |
Water and electricity pipes | Water supply PPR pipe, drainage PVC pipe | |
Indoor ground | Floor and accessories, kitchen and washing room tile | |
Other materials | Closet, washing basin, sink, shower | |
Installation | To install 200m2 house needs only 45 days by 6 professional workers | |
Loading quantity | One 40' container can load 140 m2 | |
Wind load | 130km/h | |
Anti-seismic grade | 9 degree | |
Life span | Around 70 years | |
Remarks | This specification is for the reference, if there are differences between actual condition, the adjusting is according to the actual condition. |
5.FAQ
1.Q: How much is this house?
A: Please provide with your house drawing and project location, because different design, different location effect the house materials quantity and steel structure program.
2.Q: Do you do the turnkey project?
A: Sorry, we suggest customer to deal with the foundation and installation works by self, because local conditions and project details are well knowb by customers, not us. We can send the engineer to help.
3.Q: How long will your house stay for use?
A:Our light steel prefab house can be used for about 70 years.
4.Q: How long is the erection time of one house?
A: For example one set of 200sqm house, 8 workers will install it within 45 days.
5.Q: Can you do the electricity,plumbing and heater?
A:The local site works had better to be done by the customers.
- Q: What kind of apartment is the villa?
- the performance of the upper and lower left and right are all independent space, Ranging from green space
- Q: Villa playing floor with which method is good?
- and build the attic and related to some of the deeper knowledge
- Q: Is the area of the villa terrace not included in the building area of the villa?
- Depending on the country, its definition and measurement standards may not be consistent
- Q: Why is someone called him called "Do not wild?
- 1 is not wild, is the "villa" another title, perhaps some people first saw the "villa" rhetoric, because of wrong or do not understand and read wrong.
- Q: What are the characteristics of the Spanish-style villa?
- Spanish style is a blend of Arab style and European classical style as one of the architectural form
- Q: What is the most important thing to design a villa?
- Due to the limitations of architectural design, often the villa area utilization rate is not equal, the use of frequent space sometimes the area will be cramped
- Q: What does the villa mean?
- but also mainly reflects the quality of life and enjoy the characteristics of high-level residence
- Q: How much height does the height of the fence of the villa terrace?
- balconies, corridors, indoor corridors, inner patio, rooftop roofs and outdoor staircases shall be provided with protective railings and shall comply with the following provisions:
- Q: What is the villa district management model
- each post set. Each department, each post name is for the interests of the owners, are in order to more efficient
- Q: What is the price of the villa decoration?
- But if the designer's qualifications are higher, the cost is relatively higher
Send your message to us
Villa of Prefabricated Light Steel House Cheaper for Fast Installation and High Safety
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m²
- Supply Capability:
- 10000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords