• Vertical Support System Ringlock Scaffolding - Q345 & Q235 System 1
  • Vertical Support System Ringlock Scaffolding - Q345 & Q235 System 2
Vertical Support System Ringlock Scaffolding - Q345 & Q235

Vertical Support System Ringlock Scaffolding - Q345 & Q235

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m²
Supply Capability:
1000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of Vertical Support System Ringlock Scaffolding - Q345 & Q235

Ring-lock Scaffolding consists of cup-lock connector, post, cross bar, diagonal brace, base and top brace. Safe and convenient to operation, fast to assemble and dismantle, widely used in scaffolding construction, such as formwork scaffold and fitment construction.

 

It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

 

2. Main Features of Vertical Support System Ringlock Scaffolding - Q345 & Q235

.Each Ring-lock is welded on post every 0.6m. Choose step pitch based on mechanical requirements

.When installing the scaffolding, insert ledger connector into the pole of the cup-lock, then hammer ledger connector to finish fastening

.The more load, the more reliable fasten

.Ring-lock Scaffolding has no special retaining member and no active parts. It’s easy and convenient to operation with integral low costs

 

3. Vertical Support System Ringlock Scaffolding - Q345 & Q235 Images

 

Vertical Support System Ringlock Scaffolding - Q345 & Q235

 

Vertical Support System Ringlock Scaffolding - Q345 & Q235

 

4. Vertical Support System Ringlock Scaffolding - Q345 & Q235 Specification

Type: 

ringlock scaffolding diagonal Brace 

specification 

Ø48.3×3.20 

material: 

steel Q235 

Finished 

Hot DIP galvanized, painted 

Diagonal length(m) 

Weight(kg) 

0.9m * 1.25m 

6.28

1.25m * 2.7m 

11.45

 

5.   FAQ of Vertical Support System Ringlock Scaffolding - Q345 & Q235

     1) What can we do for you? 

      We can ensure the quality of the Vertical Support System Ringlock Scaffolding - Q345 & Q235 and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  

 

   2) What promises can be done by us?

   . If interested in Vertical Support System Ringlock Scaffolding - Q345 & Q235, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

  3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Frame-Connected Scaffolding cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

  4) What about the package and shipping time?

   .Packing:  As Customer's Requirements

   .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Vertical Support System Ringlock Scaffolding - Q345 & Q235 we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  

Q:Seeking architectural internship diary, at least sixty, can be a different project, a project five or six of the do not made
For example: . steel pipe --- high-rise buildings and heavy load . mobile scaffolding --- generally used for lower construction or interior decoration (also . bamboo - simple low-rise buildings (like ordinary factories and Rural housing) with more
Q:Wanzhou District housing notarized brick structure is how much money per square meter
Main technical performance: The use of adhesive gypsum and expansion anchor will be extruded polystyrene gypsum composite plate fixed to the inside of the building wall, and the use of joint gypsum and paper tape on the joints for processing
Q:Construction of the project more than the number of layers must be used construction elevator
Bulk density of polystyrene foam board should be ≥ 18kg / m; Polyurethane double-sided steel plate metal surface sandwich panel
Q:What kind of special jobs are available at the construction site?
62-1 meet the requirements 2 trench may not be backfill with water, backfill should be dense Section 4
Q:Rt, 3ks, as far as possible Please ask questions: is the construction site, there are other sites? More
As the external scaffolding (including the bridge scaffolding and the basket) to withstand the limited load capacity is limited, so generally do not use the tower directly to the outer scaffolding supply; when the use of its supply, the need to take specific conditions, respectively, the following measures: (2 to 3 layers, with tower crane installation); 2) the use of small groups of small containers, the overall lifting of the lifting of the body , Respectively, to the operating site; 3) in the scaffold set on the small hopper (need to add appropriate support), the mortar were unloaded in a small hopper When using other vertical transport facilities, trolleys (tricycles, two-wheelers and all kinds of special trolleys) are generally used for horizontal transport Its carrying capacity depends on the number of cars can be loaded at the same time as a unit of time to enhance the number of times Installation conditions The location of the vertical installation shall be fitted with suitable installation conditions, such as a reliable foundation, structural ties and horizontal transport conditions equipment performance must be considered to meet the construction needs and give full play to the effectiveness of equipment When the vertical phase of the construction phase of the phase difference between the poor, should be set up and adjust the vertical transport equipment in phases, the timely removal of equipment has been unnecessary the full use of equipment to make full use of existing equipment, if necessary, the acquisition or processing of new equipment The prospects for future use should be taken into account when acquiring or processing new equipment The use of equipment should be considered in the use of Bi after the change can be used
Q:Construction safety inspection score summary of the supervision unit, construction unit inspection opinions how to fill?
Safety and civilized construction measures include: First, the safety of production . the preparation of safety information, security warning signs of the purchase and promotion of the column set; . "Sambo", "four", "five edge" . the crane, tower crane and other lifting equipment (including derrick, mast) and external safety precautions (including warning signs) costs, including the safety of electricity, including electrical safety standards, electrical protection devices, . the construction site lifting machinery inspection and testing costs; . the construction machinery fence and its fence safety protection facilities costs; . the construction site of the construction site, . fire facilities and fire equipment configuration costs; . electrical protection, safety lighting facilities; . other security measures costs. the cost of security equipment, Second, the fence of the wall beautification (including inside and outside the paint, brush white, slogans, etc.), pressure top decoration costs; on-site toilet slotted white, the user's badge, . on-site living facilities costs; meet the health requirements of drinking water equipment, shower, disinfection, etc.), the cost of the construction of the temporary facilities, . the construction site operating site of the hardening costs; . the source of pollution control, construction waste and garbage clean-up Sinotrans, site drainage and sewage treatment measures, the use of clean fuel costs; anti-gas poisoning, anti-mosquito bites and other measures; . the scene with medical and health care equipment, the cost of goods and emergency personnel training costs; . for the field of workers, the cost of food safety equipment, the cost of food safety equipment, Summer cooling costs, electric fans, air conditioning and other equipment and electricity costs; . the scene Construction machinery and equipment to prevent noise, anti-people measures measures; . other civilized construction measures costs.
Q:Hello, can you send me an electronic version of the current building code? Thank you, email
A project floor-style double row scaffolding more than 30 meters, does not meet the specifications,
Q:What are the five accidents in the construction industry?
The top is definitely to hang, with the top of the space to stay between one meter is the best, in the ceiling of the time, such as with a buckle plate, in the buckle inside plus a layer of rock wool, 3-5 cm thick, Remember to install the time as far as possible not to flatten the cotton, will affect the effect. Brick wall outside or inside, do insulation layer, if the money, but also with rock wool or foam board and the like, if the foam board, the thickness of not less than 6 cm, 10 cm best. Glass surface, this does not spend money is to die, do not spend on the outside hanging sun curtain, cloth and the like, if you want to see, to brush transparent insulation coating, but the price is high.
Q:The latest "current building construction specifications Daquan" electronic version can give me a copy of it My mailbox @ thanks for more
(Insulation, thermal insulation effect is better) of the insulation material and the building wall fixed one (the thermal insulation effect is better), and the thermal insulation material is fixed with the building wall (fixed, mechanical anchoring, paste + mechanical anchoring, spraying, casting, etc.) , Increase the average thermal resistance of the wall, so as to achieve the insulation or insulation effect of a engineering practice. Should include roof insulation!
Q:What is the difference between the inside and outside of the car
The ambient temperature is low so the cooling mode does not start. Heating outside the machine first start, the machine delay start, and need to run for a while only hot air

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches