• Ul C7 E12 120Vac Strawberry 3 Dip Led Christmas Lights System 1
  • Ul C7 E12 120Vac Strawberry 3 Dip Led Christmas Lights System 2
  • Ul C7 E12 120Vac Strawberry 3 Dip Led Christmas Lights System 3
Ul C7 E12 120Vac Strawberry 3 Dip Led Christmas Lights

Ul C7 E12 120Vac Strawberry 3 Dip Led Christmas Lights

Ref Price:
$0.52 - 2.06 / pc get latest price
Loading Port:
Shenzhen
Payment Terms:
L/C,T/T
Min Order Qty:
5000 Pieces pc
Supply Capability:
50000 Pieces pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

General Introduction

UL C7 E12 120VAC strawberry 3 dip led christmas lights

E12 Opaque Warm White (10 colors) C7 LED

 

Specification

ModelLMDC7-0.4-E12CCT3000-3500K
Rated Voltage120VOperating Temperature - 30°C-- +60°C
Rated Power0.4 WWaterproof GradeIP 54
Bulb Size22.5*54.0m/mLamp BaseE12 Nickel Plated Brass
LED Qty3LEDBulb HousingOpaque Smooth Molding
Luminous Flux8-10LM (Warm White)Lifetime10000H

 

Feature

Unique – New LED design

Excellent heat dissipation

Professional lamps advanced technology: Low-power, high luminous efficiency and high color rendering index

Very low energy consumption

Shockproof and vibration-proof thanks to LED technology

Extremely long life 10000H

No UV and near-IR radiation in the light beam

Instant 10-100% light, no warm-up time

Can be easily fitted instead of ordinary light bulbs

Lower thermal output (compared with the standard reference product)

Correct operation even at low temperatures

High Voltage-withstanding

Stable Performance

 

Application

Use for decorate trees on thanksgiving day,christmas holiday ,new year, party and so on .

Energy saving up to 98% on power consumption, bright brilliant colors, pro grade commercial LED for trees in windy and icy areas.

 

Our Services

Reply your inquiry in 24 working hours

Customized design is available,OEM and ODM are welcomed

Delivery the goods to our customer all over the world with speed and precision

Offer customer the lowest price with high quality product.

 

Quality control

Before the order confirmed finally,we would strictly check the material,color,dimension of the sample step by step

We salesman,also as an order follower,would trace every phase of production from the beginning

We have a QC team,every product would be checked by them before packed

We would try our best to help clients solve problems when they occurred.

Delivery:

Shipping Service

Estimated Delivery Time

DHL

2-8 business days

FedEx

3-8 business days

TNT

2-10 business days

UPS

1-7 business days

EMS

6-14 business days

ePacket

7-12 business days

China Post Air Mail

7-15 business days

China Post SAL

14-30 business days

By sea

30-40 business days

1. 3-10 business days for Sample Orders; 7-40 business days for Bulk Orders.

2. "Business days" means Monday-Friday, excluding holidays.

3. DHL and UPS cannot ship to military or P.O. boxes address.

4. The Shipping Service above is for reference only, for any other questions, please feel free to contact us. 

Q: CREE semiconductor lighting pay no
In case of holidays or rest days, you should pay in advance on the most recent working days. Wages shall be paid at least once a month, and wages paid by week, day and hour shall be paid by week, day and hour.
Q: Aomori Festival
Predators, hot springs, highland celebrations: in addition to the bazaar, bingo, ballad shows and hot songs, Cara, OK, and other colorful activities.
Q: What are the main technical measures for the implementation of energy-saving lighting?
To make full use of natural light is one of the important ways to save the energy consumption of lighting, that is to say, electrical designers should consider the full combination of natural light and artificial lighting as far as possible, so as to save lighting energy.
Q: Do you want city lighting?
About city lighting, whether to do this problem, depends on how to understand? City lighting also called night lighting, is referred to as words, he has a lot of classification, such as buildings, squares
Q: Zhengzhou Chuangxing for Lighting Design Co. Ltd?
Our first-class occupation lighting designer team, we carefully read every city, every building and every place, understand
Q: What are the energy saving measures for lighting and distribution?
: the main light source of the building is the fluorescent lamp, and the higher places, such as the lobby, the atrium, the performing hall and so on, should use the ceramic metal halide lamp
Q: The festival lights are strung together by a number of small light bulbs connected to the lighting circuit
the lighting voltage is 220V, 10 "12V, 10W" series connected to the lighting circuit,
Q: What is the color temperature of a star hotel?
The entrance is also a busy area for the hotel's welcoming service and the visitor's entrance and exit. The lighting design should ensure that these activities are carried out in a bright environment to ensure the safety of pedestrians and cars.
Q: Does common energy-saving lighting have harmful radiation?
certification in Europe which includes electromagnetic radiation and interference, non-compliance is not through certification
Q: About the brightness of LED lighting
The first is the internal circuit problem. 1 Section 7 should use constant current drive circuit.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords