• 4Way Led Rgb Distributor For Rgb Holiday Light (L901A) System 1
  • 4Way Led Rgb Distributor For Rgb Holiday Light (L901A) System 2
  • 4Way Led Rgb Distributor For Rgb Holiday Light (L901A) System 3
4Way Led Rgb Distributor For Rgb Holiday Light (L901A)

4Way Led Rgb Distributor For Rgb Holiday Light (L901A)

Ref Price:
$0.65 - 1.91 / pc get latest price
Loading Port:
Shenzhen
Payment Terms:
L/C,T/T
Min Order Qty:
1000 Pieces pc
Supply Capability:
10,000 Pieces pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

4way LED RGB Distributor for RGB Holiday Light (L901A)

Holiday Light LED RGB Tape Distributor 4-way

Part    No.: L901A

Suitable Power: LED transformer, LED Driver and Halogen Transformer

Suitable Plug: L822-4

Circuit: Parallel Connection 

Connector Color : White or Black

Connector Material : ABS +Contact

Fire Rating: V-0

Cable Material : UL 2464 #22 or 24# 4C

Voltage Rating : 12V -24V    

Current Rating : 3A 

Cable Length  :  2000mm

Working with: RGB Controller; RGB Lights; RGB LED Strips and so on.

 

Application

This RGB LED Strip distributor is widely used in the indoor LED lighting system in European countries.

 

Quality Control:

4Way Led Rgb Distributor For Rgb Holiday Light (L901A)

 

Delivery:

Shipping Service

Estimated Delivery Time

DHL

2-8 business days

FedEx

3-8 business days

TNT

2-10 business days

UPS

1-7 business days

EMS

6-14 business days

ePacket

7-12 business days

China Post Air Mail

7-15 business days

China Post SAL

14-30 business days

Air freight

3-10 business days

By Sea

30-40 business days

1.    3-5 business days for Sample Orders; 7-30 business days for Bulk Orders for Bulk Orders.

2.    "Business days" means Monday-Friday, excluding holidays.

3.    DHL and UPS cannot ship to military or P.O. boxes address

4.    The Shipping Service above is for reference only, for any other questions, please feel free to contact us.

4Way Led Rgb Distributor For Rgb Holiday Light (L901A)

 

 Factory:

4Way Led Rgb Distributor For Rgb Holiday Light (L901A)

 

 

Q: CREE semiconductor lighting pay no
The month payment last month wages can be, but Kuayue is illegal; if the company owed wages, workers can go to the labor supervision by the labor inspection brigade brigade complaints, the employing units ordered deadline for payment of wages, fails to pay, have to pay compensation.
Q: Building lighting in lighting, lighting should pay attention to what details?
Building lighting needs to consider the problem, should choose the appropriate lamps and lanterns lighting, in general, square light distribution angle is larger, round lamp angle is smaller.
Q: Do you want city lighting?
roads and bridges, airports, railway stations and ports, rivers and water landscape, places of historic interest and scenic beauty, and advertising signs and Commercial Street, city municipal facilities such as landscape lighting, its purpose is to use the light lighting objects to reshape the landscape, and organically combined into a harmonious picture at night, spectacular and unique, in order to show a city or region image of the night
Q: The sign and meaning of energy saving lamp
the two signs all indicate that products meet the requirements of national standards for energy conservation evaluation.
Q: Notes on installation of lighting for 105W high power energy-saving lamp factory building
, after all, the market is mixed with many products, uneven quality.
Q: Energy saving of urban lighting
The focus of urban lighting energy-saving work is urban nightscape lighting. A) implement a single project in accordance with the overall urban lighting plan
Q: Colorful lighting, okay?
Lighting is a brand new resplendent with variegated coloration, in 2013 I bought the resplendent with variegated coloration can also feel, light, I go there to buy a house in the decoration lamp this year,
Q: What are the main points of power distribution and lighting energy-saving supervision?
The heat transfer coefficient, shading coefficient, visible light transmittance and the dew point of insulating glass should be in line with the design requirements.
Q: Do the statutory holidays allow schools to assign homework to students?
The forty-sixth article states: "citizens of the People's Republic of China have the right and obligation to receive education.
Q: About the brightness of LED lighting
LED he's transparent, except for angle astigmatism. Apart from the angle, there is still scattered light.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords