4Way Led Rgb Distributor For Rgb Holiday Light (L901A)
- Loading Port:
- Shenzhen
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 1000 Pieces pc
- Supply Capability:
- 10,000 Pieces pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
4way LED RGB Distributor for RGB Holiday Light (L901A)
Holiday Light LED RGB Tape Distributor 4-way
Part No.: L901A
Suitable Power: LED transformer, LED Driver and Halogen Transformer
Suitable Plug: L822-4
Circuit: Parallel Connection
Connector Color : White or Black
Connector Material : ABS +Contact
Fire Rating: V-0
Cable Material : UL 2464 #22 or 24# 4C
Voltage Rating : 12V -24V
Current Rating : 3A
Cable Length : 2000mm
Working with: RGB Controller; RGB Lights; RGB LED Strips and so on.
Application
This RGB LED Strip distributor is widely used in the indoor LED lighting system in European countries.
Quality Control:
Delivery:
Shipping Service | Estimated Delivery Time |
DHL | 2-8 business days |
FedEx | 3-8 business days |
TNT | 2-10 business days |
UPS | 1-7 business days |
EMS | 6-14 business days |
ePacket | 7-12 business days |
China Post Air Mail | 7-15 business days |
China Post SAL | 14-30 business days |
Air freight | 3-10 business days |
By Sea | 30-40 business days |
1. 3-5 business days for Sample Orders; 7-30 business days for Bulk Orders for Bulk Orders.
2. "Business days" means Monday-Friday, excluding holidays.
3. DHL and UPS cannot ship to military or P.O. boxes address
4. The Shipping Service above is for reference only, for any other questions, please feel free to contact us.
Factory:
- Q: CREE semiconductor lighting pay no
- The month payment last month wages can be, but Kuayue is illegal; if the company owed wages, workers can go to the labor supervision by the labor inspection brigade brigade complaints, the employing units ordered deadline for payment of wages, fails to pay, have to pay compensation.
- Q: Building lighting in lighting, lighting should pay attention to what details?
- Building lighting needs to consider the problem, should choose the appropriate lamps and lanterns lighting, in general, square light distribution angle is larger, round lamp angle is smaller.
- Q: Do you want city lighting?
- roads and bridges, airports, railway stations and ports, rivers and water landscape, places of historic interest and scenic beauty, and advertising signs and Commercial Street, city municipal facilities such as landscape lighting, its purpose is to use the light lighting objects to reshape the landscape, and organically combined into a harmonious picture at night, spectacular and unique, in order to show a city or region image of the night
- Q: The sign and meaning of energy saving lamp
- the two signs all indicate that products meet the requirements of national standards for energy conservation evaluation.
- Q: Notes on installation of lighting for 105W high power energy-saving lamp factory building
- , after all, the market is mixed with many products, uneven quality.
- Q: Energy saving of urban lighting
- The focus of urban lighting energy-saving work is urban nightscape lighting. A) implement a single project in accordance with the overall urban lighting plan
- Q: Colorful lighting, okay?
- Lighting is a brand new resplendent with variegated coloration, in 2013 I bought the resplendent with variegated coloration can also feel, light, I go there to buy a house in the decoration lamp this year,
- Q: What are the main points of power distribution and lighting energy-saving supervision?
- The heat transfer coefficient, shading coefficient, visible light transmittance and the dew point of insulating glass should be in line with the design requirements.
- Q: Do the statutory holidays allow schools to assign homework to students?
- The forty-sixth article states: "citizens of the People's Republic of China have the right and obligation to receive education.
- Q: About the brightness of LED lighting
- LED he's transparent, except for angle astigmatism. Apart from the angle, there is still scattered light.
Send your message to us
4Way Led Rgb Distributor For Rgb Holiday Light (L901A)
- Loading Port:
- Shenzhen
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 1000 Pieces pc
- Supply Capability:
- 10,000 Pieces pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords