TWIN ELBOW R275, 90DER
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specifications
Twin wall concrete pump elbow
1. Material: high manganese casted and twin layer
2. Lifetime: 25,000~50,000cbm
TWIN WALL CONCRETE PUMP ELBOW (DN125*R275* 90/45DRG) FOR PM
1.Products details
Item | TWIN WALL CONCRETE PUMP ELBOW (DN125*R275* 90/45DRG)
|
Size | 1/2"~48'' |
Wall Thickness | SCH10, SCH20, SCH30, STD, SCH40, SCH60, XS, SCH80, SCH100, SCH120, SCH140, SCH160, XXS, DIN, JIS standard thickness |
Standard | ASTMA234, ASTM A420, ANSI B16.9/B16.28/B16.25, ASME B16.9, JIS B2311-1997/2312, JIS B2311/B2312, DIN 2605-1/2617/2615, GB 12459—99, EN Standard etc |
Angle | 22.5 deg, 30 deg, 45 deg, 60 deg, 90 deg, 180 deg; 1D,1.5D, 2D, 2.5D, 3D, 4D, 5D, 6D, 7D-40D |
Material | Q235, 20#, 10#, Q345 A234 WPB, WP5, WP9,WP11, WP16 ST37.0, ST35.8, ST37.2, ST35.4/8, ST42,ST45, ST52, ST52.4 STP G38, STP G42, STPT42, STB42, STS42, STPT49, STS49 |
Application | Low and middle pressure fluid pipeline, boiler, petroleum and natural gas industry, drilling, chemical industry, electric industry, shipbuilding, fertilizer equipment and pipeline, structure, petrochemical, pharmaceutical industry etc |
Surface | Black painting, varnish paint, anti rust oil, hot galvanized, cold galvanized, 3PE, etc |
Package | Plywood cases, wooden pallet with plastic film, or based on customers' request |
Payment | L/C at sight, T/T,WU |
Delivery Time | 7-25 days, depend on product quantity |
Certificate | ISO9001:2008, SGS,BV, etc |
Capacity | 65000tons/year |
Equipment | Press Machine, Bending Machine, Pushing Machine, Electric Beveling Machine, etc |
Advantages | 1. Reasonable price with excellent quality 2. Abundant stock and prompt delivery 3. Rich supply and export experience, sincere service 4. Reliable forwarder, 3-hour away from port. |
| 1. Special design available according to customers' requirements. 2. Anti-corrosion and high temperature resistant with black painting. 3. All the production process are made under ISO9001:2000 strictly
|
- Q:Definition of large mechanical equipment?
- Depending on the size of the part to be machined, the parts must be set up as large equipment with the aid of a crane, and large machinery is usually assembled after the parts have been delivered to the destination. Material handling machinery is mainly in enterprises (including terminals, materials, mines and commercial warehouses, etc.) within the material handling, transportation, lifting, stacking and storage of machinery and equipment
- Q:What are the sectors of machine building and parts processing?
- 3., machinery manufacturing is also a kind of industry, many industries have parts manufacturing, processing links. Therefore, the processing of parts does not belong to a particular industry.
- Q:What are the details of construction machinery parts in sand casting?
- (3) equipped with fittings, installation type air switch and air shower room installed in the furnace. (2) all kinds of vehicle tracks, transmitters, differential pressure and buttons are all materials other than the equipment body. (3) rotating filter network circulating water system for equipment, induction phase shifter, manhole and other various products embedded parts, clean bench, meter, scientific research and other functions of the machine, and pipeline safety device, railing, peep hole, ventilation air heater (1):
- Q:Construction Engineering, moving equipment and stationary equipment, respectively
- Moving equipment refers to the rotating equipment driven by a drive (i.e., equipment with energy consumption), such as pumps, compressors, fans, etc. the energy can be electric power, pneumatic power, steam power and so on. Moving equipment refers to the main components of the movement of machinery, such as various filters, crushers, centrifuges, rotary kiln, mixer, rotary dryer and fluid conveying machinery
- Q:What is the use of spare parts prices in Chinese market by foreign companies?
- But there is always somebody to ask, just like a college paper, where everyone can read or keep secrets, but collecting them and sending them to foreigners is a sign of treason
- Q:Building materials, equipment, components and fittings products must have "three certificates" is what cards?
- Product quality certification, also known as product certification, internationally known as qualified certification. According to the 1991 implementation of the "people's Republic of China Quality Certification Management Regulations", the product quality certification is based on the product standard and relevant technical requirements, the certification institution confirmed by the certification and certification marks to prove that a particular product is in conformity with the relevant standards and technical requirements of the corresponding activities.
- Q:What are the sub projects of a construction project?
- Appendix B Construction Engineering Division (sub branch) engineering, sub project division, B.0.1 Construction Engineering Division (sub branch), engineering, sub projects can be divided into table B.0.1. Table B.0.1 division number of construction works, sub works and sub projects
- Q:What are the main functions of construction equipment monitoring system?
- The total of the console cameras and auxiliary equipment (such as camera, PTZ, shield) control generally adopts the bus mode, a control signal to the camera near the terminal in the terminal box decoding, decoding box will total console from the control signal encoding solution, a control action command signal, a variety of actions to go camera control and auxiliary equipment (such as lens zoom, pan rotation etc.). In the case of some cameras that are close to the control center, in order to save money, the command signal, which is the "on or off" signal, can also be sent directly by the console. In short, according to the composition of the system and requirements, can be considered in order to complete the overall console design requirements or order requirements.
- Q:Construction machinery production need to deal with what documents?
- Construction machinery production needs for documents are: first, the construction enterprise safety production license application form 1, form three copies; 2, fill in the application form for details of the "instructions" application form "; 3, the legal representative of the enterprise statement" column should be the legal representative signature, enterprise official seal;
- Q:Where are the mechanical pressurization air supply facilities set up?
- When the smoke proof staircase and antechamber antechamber, fire elevator or common antechamber parts can be opened outside the window, can use the natural ventilation, resulting in a stairwell with or common antechamber in the use of natural smoke exhaust with pressurized air supply arrangement of diversified combinations, and the two exhaust can not be shared.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
TWIN ELBOW R275, 90DER
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords