TUV Solar pv cable 1x6mm²
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 2000000 m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specifications
Solar PV cable
1.Used in photovoltaic system.
2.Comply with TUV and UL 4703
3.Wildly use in solar system
Application Solar PV cable
Used in photovoltaic system. Comply with TÜV 2PfG 1169/08.2007 and UL 4703
Product Description
Double core:
1.Rating:Voltage: 600/1000V Temperature:-40°C-- 90°C
2. Description: (1)Conductor: Tinned annealed copper
(2)Insulation:120°C XLPE , black
(3)Jacket:120°C XLPE , black or red
3.Marking:TÜV 2 PfG 1169 PV1-F 2×**mm2
4.Application: Specifically designed for connecting photovoltaic Solar system Power
Packaging & Shipping
2 1*6 mm2 10000Meters/Pallet
3 1*10mm2 6000 Meters/Pallet
4 1*16 mm2 4000Meters/Pallet
5 2*4 mm2 6400 Meters/Pallet
6 2*6 mm2 4000Meters/Pallet
One 20” Container can load max 20 wooden Pallets or Boxes
Load :1*4mm2 solar cable 250km,1*6mm2 solar cable 200km
2*4mm2 solar cable 128km, 2*6mm2 solar cable 80km
- Q: The first installed, a single is ready, is to ask, the main chassis of the various power lines need their own with? Or the power itself has brought? Also, I bought more of the chassis on the back line
- Cable (electriccable; powercable): usually consists of several or several groups of wires
- Q: MacBookpro box inside the two lines which is a very thick three holes is doing?
- Embedded in the junction box with the tape to seal the title, and then according to the location of the drawings can be fixed on the template, the pipeline directly fixed in the banding of the bar can be a good, as for the relatively large weak box is best embedded in a size of the same Foam block, to be demolished, when needed in the box to install up
- Q: Is to want to remove the monitor on the notebook to make a separate monitor! For desktop! More
- Do not know you are not doing home improvement of the buried pipeline, buried pipeline construction, different environment, the requirements are not the same, as buried pipes, are generally outlets and switches are located in different locations, so you buy materials Time, it is necessary to buy the socket and the switch is separate from each other, so that you can be buried when buried separately.
- Q: Graphics card is to replace the power is directly connected to the motherboard? Power supply no 6Pin interface how to connect the discrete graphics more
- Did not see you understand that there is water in the line, or water pipes in the water. Line management of water, that is, when your home off the assembly line just fool you, tube. If only the sewer and your home at the junction of the junction of water seepage, it is easy to handle, looking for property, that is, later do not do waterproof, kitchen and toilet floors are waterproof, new house property management. Old house property, regardless of the words can only find upstairs tenants, will be his home problem, his home this is re-decoration? The The problem is clear that a good solution
- Q: I have recently entered the BenQ W1070 + this, but can not save the keystone correction, each boot must be re-adjusted, the strange thing is, I opened the keystone correction menu, which saved the value before the set, but the image is deformed. Can someone help me? Is the problem or machine, I have changed the machine. More
- Each layer on the distribution frame and then converge to the main room of the patch panel
- Q: Computer power for the desktop power supply, the speaker part of the power supply has two red lines a black line (need 12V AC), ask the experts to answer. Thank you first question added: tragedy, I found a 12v battery, no matter how access is not, it seems to have no transformer, and generally where to sell? More
- Cpu: intel Pentium e dual-core e2160 (box) 440 yuan (advanced architecture, low heat, cheap) Motherboard: Gigabyte ga-g31m-s2l470 yuan (main chipset intelg31) Memory: Apacer 1gbddr yuan (fake less than Kingston (The technology is advanced) CD-ROM: ASUS dvd-e818a135 yuan (noise is very small, gives a very quiet feeling) Power: GOLDENFIELD Raptors atx-s300 enhanced version of 150 yuan (power version: atx12v2.31 rated power: 250) Chassis: 120 yuan mouse and keyboard: 70 yuan Total price: 2200 yuan
- Q: USB port power shortage, how and deal with?
- This is no better solution, you can try to replace the high-power power - high power refers to the rated power, not the maximum power - do not let you flicker. In addition, some motherboard design is flawed, resulting in insufficient power supply usb, as in addition to the motherboard for no good solution to satisfied please adopt
- Q: Teddy how to train the station to sit and lie
- In the front of the wire bend a diamond-shaped circle, to the tube to wear, pass the time. Turn the wire clockwise to the top. , And then from the other end of the tube, and then get a piece of steel wire hook hook hook, to wear this wire is not too long about two meters, the root wire to the end, the root of the wire tail A B-bend, and then turn clockwise, until the turn does not move, then pull out, so you can put the previous section of the wire hanging out.
- Q: If the problem, power under the home, need to prepare what extension line? Such as cpu or motherboard extension line? Big gods help out more
- Iron trunking is also trunking, but with iron to do, like galvanized iron, iron paint and so on. Can be installed overhead, more durable.
- Q: Computer usb interface plug U disk why there will be: hub port surge
- Before pouring in concrete, pre-buried. If the concrete has been poured finished, then there is a chisel to open a trench buried on it.
Send your message to us
TUV Solar pv cable 1x6mm²
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 2000000 m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords