TUV Solar pv cable 1x4mm²
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 2000000 m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specifications
Solar PV cable
1.Used in photovoltaic system.
2.Comply with TUV and UL 4703
3.Wildly use in solar system
Application Solar PV cable
Used in photovoltaic system. Comply with TÜV 2PfG 1169/08.2007 and UL 4703
Product Description
Double core:
1.Rating:Voltage: 600/1000V Temperature:-40°C-- 90°C
2. Description: (1)Conductor: Tinned annealed copper
(2)Insulation:120°C XLPE , black
(3)Jacket:120°C XLPE , black or red
3.Marking:TÜV 2 PfG 1169 PV1-F 2×**mm2
4.Application: Specifically designed for connecting photovoltaic Solar system Power
Packaging & Shipping
2 1*6 mm2 10000Meters/Pallet
3 1*10mm2 6000 Meters/Pallet
4 1*16 mm2 4000Meters/Pallet
5 2*4 mm2 6400 Meters/Pallet
6 2*6 mm2 4000Meters/Pallet
One 20” Container can load max 20 wooden Pallets or Boxes
Load :1*4mm2 solar cable 250km,1*6mm2 solar cable 200km
2*4mm2 solar cable 128km, 2*6mm2 solar cable 80km
- Q:USB data line consists of four lines, namely red / white / black / green four, two lines are two lines of data lines are power lines. Now I have to ask is the power line part of which is composed of two colors of the line? More
- Red and black is the power cord white green is the data line red is the power supply black is grounded
- Q:Lenovo notebook b470 computer can not open the machine, but the power adapter lights have been flashing, the last time has been repaired once, is the last did not repair it?
- First of all, optimistic about the drawings --- under the budget materials - buy materials - cutting - from the box began to thread (do a good job length) - installation line box - are done after the insulation resistance test - power
- Q:But with the original line to connect it after (that is, no power cord) display available! May I ask how is this going? How to solve? (Extension line is not long enough, need to lengthen to 5 meters) hurry! The The The Thank you Question added: There is also a cable line
- There are six core is enough, the choice of 7 * 1.. because the control power and signal power is usually to be separated, regardless of line, it would use five core
- Q:Want to buy a submersible pump to the home with water, about 90 meters away from home, what kind of pumps and cables should be bought?
- It is best not to cut the line directly to the extension line into
- Q:Because the power is just a white "brick", nothing is written. The The Which one does you know? The Thank you for more
- Wire and cable are generally red, yellow, green is used as a fire line, blue is used for zero line, two colors used to ground, white, black, brown as a substitute line. GB / T9330-2008 Standard: KVV series of color recognition two-core cable: no preferred color three-core cable: green / yellow color, light blue, brown; or light blue, black, brown. Four-core cable: green / yellow, light blue, black, brown; or light blue, black, brown, black or brown. Five-color cable: green / yellow, light blue, black, brown, black or brown; or light blue, black, brown, black or brown, black or brown. If it is a digital sign of the insulation core, the insulation color and digital logo color should be significantly different, its preferred color insulation is black, the number is white.
- Q:If the computer power supply is not enough, you can use two power supply
- The number of patch panels in the data master is primarily based on the number of overall network points or the number of network points on the floor (and the floor, depending on how the system is designed). Different buildings, different system design, the main equipment between the patch panels will be different. For example, if there is only four floors in a building, the main equipment is set on the first floor and the network points of all floors enter the equipment. The number of patch panels is equal to the number of all network point / patch panel ports (24 Mouth, . etc.), and add a margin; if a building has 9 layers, the main equipment set in the 4 layer, then in order to avoid the cable long, , And there are switching equipment. Then the patch panel between the master equipment is equal to the number of 4-point network points / patch panel ports (. . etc.). Similar to the voice, the difference is that the majority of the voice into the line using the number of cables in the device after jumper jumper into the copper patch panel, and then through the Category 5 or 6 line to the front panel. The type of patch panel is mainly to see the equipment and the needs of the owners, such as the data can be used . . . etc., the voice can be used 110 patch panels, 10 pairs, 50 pairs, 100 pairs can The The type of jumper between the network is certainly the network cable to jump, and some of the voice between the duckbill into RJ45 or RJ. according to the need to match it. In short, your patch panel must be able to accommodate all your current network point or voice point of the configuration needs, and leave a margin can be. Hope to give you a little help.
- Q:As the computer for the chassis, into the wiring back, because the power supply 8PIN is not long enough to use 6PIN (graphics card, and later learned) interface into the 8PIN interface, can not boot. Now the problem is that I have purchased the extension of the line (not to, can not test machine), but do not know before plug the motherboard, or power supply has no effect. Will not burn the motherboard or power supply? Problem added: has been plugged in a boot, but the system did not start, the problem is not burn the motherboard or power, not to know may be, then I might as well do not ask more
- If the usb port power supply, plus an external power supply usbhub can be resolved. The The No power supply. Even if you change the power supply is not necessarily able to solve the lack of power supply. Power supply is to the motherboard power supply, the motherboard give you the usb wireless network card power supply.
- Q:Lenovo laptop does not boot how to do
- When you find the computer does not react, we need to first observe the computer press the power button, the computer's power indicator is lit, when the power indicator is not lit, it is likely to power supply problems, you can view the host power Line and external power supply is connected, whether there is a line fault, etc
- Q:Who used the whole, the whole blue bursts of mobile version of the 450 power supply? Is not it like that people are so rubbish?
- To configure the appropriate 50 computers, tables and chairs, electricity, network cabling, related procedures, documents
- Q:Under the power supply chassis (such as: Challenger 2) go back line, the power cord is not long enough circumstances, how do you solve? Seeking a rated 400W-450W power line long enough, cost-effective power more
- In the past, the old house, the calculation of electricity load can not meet the needs of modern household electricity, and many use of aluminum, aluminum wire resistance than the large, large load naturally easy to heat, easy to aging. Proposed as follows: . the home distribution box to be replaced with the installation of air leakage with a protective device, if the use of the fuse is best to change the reliability of maintenance is not very good; . lighting, general socket, . easy to produce leakage of the location such as: kitchen, toilet socket must be three-phase four-wire cable . if you do not want too much trouble can choose to take the line outside the deduction of the buckle, the kitchen, toilet, . in general, with 1.5 square meters of lighting, socket with 2.5 square, air conditioning with 4 square copper is enough to use, but also to the wall, Electricity safety is a big deal, no matter who lives this house can not ignore this problem, remember.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
TUV Solar pv cable 1x4mm²
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 2000000 m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords