• TUBE CUTTER SQ-MC-3-30-1Aluminium alloy /Zinc alloy System 1
  • TUBE CUTTER SQ-MC-3-30-1Aluminium alloy /Zinc alloy System 2
  • TUBE CUTTER SQ-MC-3-30-1Aluminium alloy /Zinc alloy System 3
TUBE CUTTER SQ-MC-3-30-1Aluminium alloy /Zinc alloy

TUBE CUTTER SQ-MC-3-30-1Aluminium alloy /Zinc alloy

Ref Price:
$0.80 - 8.50 / pc get latest price
Loading Port:
Ningbo
Payment Terms:
TT or LC
Min Order Qty:
2000 pc
Supply Capability:
20000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Size :3-30mm ;

Aluminium alloy /Zinc alloy; Bearing steel blade.This professional quality tube cutter  gives a  clean, square  cut on thin wall copper,barss or alummium tubing,A square cutting wheel is supplied  inside the konb.


Instructions for use:
Place the tube requiring cutting into the machine and turn the konb clockwise until the rollers make contact at the required cutting point,it is important not to overtighten at this atsge .Rotate the cutter around the thbe and then gently re-tignten.Cintinue this operation until the tubing is cut .Finally remove any internal burrs using the reamer which is fixed in the case of the tubing cutter .

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Q: What are the main materials in the building?
Building materials of the same product is often divided into several grades and labels. Each grade of material should ensure a certain quality, which is the material standard. In the material standard specifies the material specifications, size, fineness, chemical composition, strength, technical indicators. Materials in the factory, after acceptance and use should be sampled to see if it meets the standard.
Q: What mechanical tools are required for building waterproofing works?
3, the basement, floor, basement walls used impermeable concrete must be advanced to the material laboratory, made with the experimental report out, reported to the supervision and approval. 4, technical skills and technical requirements of workers
Q: What are the costs of the tools used to build the project?
The gadget can be counted in the "production tool utensil" fee for the cost of the enterprise management fee.
Q: What art tools do art need? Learn what?
Architectural design is often in the construction site, building type and construction costs between the three decisions. Therefore, the architectural design is for the environment, use and economic conditions and requirements to be operational adjustment and specific process. This process not only has its practical value, but also has its spiritual value, because for any kind of social activities created by the spatial layout will affect people in the way of activities.
Q: Hand-held power tools can wear gloves?
1, before the use of tools, should be full-time electrical inspection wiring is correct, to prevent zero line and phase fault caused by accident. 2, long-term shelved or tide of the tool before use, electrical resistance should be measured by the electrical resistance to meet the requirements.
Q: Construction site, what software for three-dimensional modeling?
It is understood that BIM R & D and CAD R & D is the same company, familiar with the CAD model of the establishment of the BIM application operation should not be a problem!
Q: What are the tools needed for building construction?
Maneuver, pulley, pulley, rope, hoist, tower crane, vibrator, leather bucket, iron wiping, bucket, bucket, rubber brush, impact drill, pistol drill, concrete mixer, mortar, dump truck, earth car.
Q: What tools are required for building hand-painted?
Color for your curriculum design depth and performance speed to choose what tools to color, the so-called slow work out of fine work, according to the performance of the degree of detail and fidelity: water powder> watercolor> color lead> microphone pen.
Q: What are the tools for the construction site level?
Construction workers in the construction site to do the main line of defense, technical exchanges, supervision and inspection of the quality of work. So the tools to use are there
Q: What are the tools and machines needed for building measurements?
First, the level of measurement 1, level 2, the standard scale 3, the difference between the law 4, instrument high law

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords