• Pipe Cutters SQ-PC-706 cuts PVC.aluminium of plastic pipes System 1
  • Pipe Cutters SQ-PC-706 cuts PVC.aluminium of plastic pipes System 2
  • Pipe Cutters SQ-PC-706 cuts PVC.aluminium of plastic pipes System 3
Pipe Cutters SQ-PC-706 cuts PVC.aluminium of plastic pipes

Pipe Cutters SQ-PC-706 cuts PVC.aluminium of plastic pipes

Ref Price:
$0.80 - 4.00 / pc get latest price
Loading Port:
Ningbo
Payment Terms:
TT or LC
Min Order Qty:
2000 pc
Supply Capability:
20000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product characteristucs:cuts PVC.aluminium of plastic pipes . when cutting PVC flesible pipe you should revolve the pipe whilst compressing.
Scope of cut : rigid plastic pipes to a maximum diameter of 42mm 
INSTRUCTION OF USE :
1.  Part the handles to suit for cut angle.
2. Compress handles tightly until pipes is cut.
3. After cutting close the handles
ATTENTION:
When useing  this prouct in the winter it is advisable to put the pipe in lukewarm waterto head, thiswill avoid bust pipes due to cold making pipes fragile for cutting.
If sdge of the cutters,are showing signs of wear and tear.loosen the fixing screw,remove the blade and replace with same type of  pipe cutting blade.
After use we recommend rusproof oil is aplied to the cutter.

 

 

 

 

 

 

 

 

 

 

 

 

Q: What are the main materials in the building?
Building materials of the same product is often divided into several grades and labels. Each grade of material should ensure a certain quality, which is the material standard. In the material standard specifies the material specifications, size, fineness, chemical composition, strength, technical indicators. Materials in the factory, after acceptance and use should be sampled to see if it meets the standard.
Q: Level 1 Registered Architects Site Design Draws what tools to use
Knife, modify the drawings of the knife (drawing error, local changes), T-foot, pen (black, neutral pen line, write on the drawings, marked)
Q: What are the building hardware tools?
Air jaws, air pumps, pull nail guns, nail guns, welding guns, fushers, perforators, hydraulic pliers, hydraulic cutters, cutting machines, hand wheel, bench drill, portable drill
Q: What art tools do art need? Learn what?
Art Architecture (Architecture), in a broad sense, is a study of buildings and their surroundings.
Q: What are the three major tools in construction?
General terms of the construction industry, refers to the construction site used in the external walls, interior decoration or high height can not be directly the construction site. Mainly for the construction staff to work up and down or external safety net enclosure and high-altitude installation components, said white is the shelf
Q: Construction site, what software for three-dimensional modeling?
At present, the application of BIM is the initial stage in China. However, after the technology of the United States is mature, the BIM model is established. After the establishment of the model, the paper will have an intuitive expression. Help
Q: What are the tools needed for building construction?
Maneuver, pulley, pulley, rope, hoist, tower crane, vibrator, leather bucket, iron wiping, bucket, bucket, rubber brush, impact drill, pistol drill, concrete mixer, mortar, dump truck, earth car.
Q: What construction machinery is needed at the construction site of the building?
What are the equipment to be prepared for the construction site? There are many types of construction contractors, such as large-scale projects that must be transported: cranes (transport) lifts (transport) mud truck (transport) and other related concrete production
Q: Construction safety supplies are what
The construction enterprise shall establish and maintain the safety management files of the construction facilities, equipment, labor protection articles and related safety testing equipment, and record the following contents: 1, source, type, quantity, technical performance, service life and other static management information, as well as the current Use the location, the use of state, the use of responsible persons, testing, routine maintenance and other dynamic management information;
Q: What are the tools and machines needed for building measurements?
Second, the baseline measurement 1, theodolite 2, test steel ruler Third, the plane control measurement 1, triangulation method 2, wire measurement method 3, the three side measurement method

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords