TRUCK CRANE QY130K,MORE EXCELLENT PERFORMANCE
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Classificatory | Item | Unit | Parameter | |
---|---|---|---|---|
Outline dimension | Overall length | mm | 14950 | |
Overall width | mm | 3000 | ||
Overall height | mm | 3950 | ||
Axle base | Axle 1, Axle 2 | mm | 1420 | |
Axle 2, Axle 3 | mm | 2420 | ||
Axle 3, Axle 4 | mm | 1875 | ||
Axle 4, Axle 5 | mm | 1350 | ||
Axle 5, Axle 6 | mm | 1400 | ||
Wheel base | mm | 2610/2307 | ||
Mass | Total mass in travel state | kg | 62000 | |
Axle load | Axle 1, Axle 2 | kg | 8800/8800 | |
Axle 3, Axle 4 | kg | 9200/12700 | ||
Axle 5, Axle 6 | kg | 12700/9800 | ||
Power | Crane superstructure engine | Rated power | kw/(r/min) | 162/2100 |
Rated torque | N.m/(r/min) | 854/1400 | ||
Rated speed | r/min | 2100 | ||
Crane carrier engine | Rated power | kw/(r/min) | 390/1800 | |
Rated torque | N.m/(r/min) | 2400/1080 | ||
Rated speed | r/min | 2000 | ||
Travel performance | Travel speed | Max. travel speed | km/h | 70 |
Min. stable travel speed | km/h | 2.1 | ||
Min. turning diameter | m | 24 | ||
Min. ground clearance | mm | 275 | ||
Approach angle | (°) | 23 | ||
Departure angle | (°) | 14 | ||
Braking distance (at 30km/h) | m | ≤ 10 | ||
Max. grade-ability | % | 40 | ||
Fuel consumption for 100km | L | 80 |
- Q: Well the machinery is hydraulic and so it trips automtically after a certain temperature. It is because of the oil or pressure or what. What should I do in order to let it run for longer time. I mean it runs for few minutes.
- you need to describe your question better. Is the high temp on the hydraulic system or the crusher system? If it is hydraulic, add an oil cooler to the system and depending on the temperature desired it could be an air or water cooler. If it is the crusher, you can lighten the feed rate or open it up a little to let air go through the machine. The other thing look at the set temperature for tripping and make sure the switch is set properly. The other thing is, is the crusher set up right for the material that you are crushing. You may have to adjust the mix of feed or put another crusher in line if you are overloading it. And all crushing is not the same. You can crush aluminum cans by just squeezing them into a block or you can shred them into bits with a shredder/crusher. Not clear what you are doing.
- Q: all...not amm...ALL MACHINERY. sorry.
- Nope. That would make imports even cheaper than they are now. He can make a lot of jobs by doing things like how large certain companies, like banks and insurance companies can be which will increase competition and decrease efficiency which will create more jobs. It will lead to higher prices though. I lost a good job at a bank when they got bought out by a bigger bank.
- Q: why is heavy machinery called plant?
- Heavy Plant Machinery
- Q: I want to start export machinery spares parts from India. I don't know how to start? I did some research sent some email to foreign company but nobody replied..?? Please guide me step by step process. 1. How to approach foreign traders/foreign importers?2. How do I market my company?3. What are the legal procedure to export from India?4. What is market position for exporting machinery spare parts from India?
- Go to your board of trade in your community,importing Exporting the canadain goverment has booklets,when you dealing with another country you have to register your bussiness thats,insurance,bondable,frieght insurance,and the person that can help you is a custom broker there in the yellow pages,and you would have to look upindia custom,there tarrifs,its a lot but my suggestin is look for gov help,look on web site exporting products
- Q: How to improve mechanical design ability!
- To improve, we must sum up, this is critical. Other people or their achievements from scratch, thinking, think where needs improvement, where is the key, where is worth learning and drawing lessons from. Thinking is very important. Thinking is progress.
- Q: Ocean Drive Dudes just purchased a new press machinery for $232,000 on December 14, 2010. It is estimated that will last 15 years and has a scrap value of $8,000. You will use this information toprepare the schedules required below. You have to show all details of computations on a year byyear basis to obtain an adequate score. It is estimated That it will last 15 years and has a scrap value of $8,000. Do schedules of sum of the years digits method, double-declining method, and straight line method
- Looks like you need to get started on your homework then. Honestly how will you ever learn such a simple thing as depreciation and methods if you do not even attempt to do your work?
- Q: Last night there was a massive noise on the railway outside my house which woke me up (like a consistent banging), I looked outside and it was a moving piece of machinery with sparks underneath it, it was quite long. I was wondering if anyone could shed some light on this, thanks.
- The piece of machinery that you are talking about Sounds like a rail head grinder. Its used to smooth out the rails so when a train passes your hous it will seem quieter, and for the passengers the ride witll be smoother. The machine can also be used to cut out damanged pieces of track and fix a new piece in all at the same time hence the grinder to smooth out the welding. I hope that my answer helps. Joolz
- Q: Engineering engines use those engines as power!
- A diesel engine used on construction machinery.. What brands do you have?.. For example: working with deutz. Steyr。。 Other summer jobs. Liugong. Temporary workers. What engine do you use?
- Q: What does the construction cost include?
- 1. direct cost refers to the construction cost of the formation of Engineering entities and contribute to the formation of the various costs, including labor costs, materials costs; construction machinery use fees. (1) labor cost refers to the expenses directly involved in the expenses of the production workers in the construction and installation works.
- Q: used in manufacturing and production
- You create a program and it drills out the material to give you the part you need.
Send your message to us
TRUCK CRANE QY130K,MORE EXCELLENT PERFORMANCE
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords