Tower Crane VFD PLC 16 Ton Max Capacity CMAX
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Detail of Tower Crane
Feature:Tower Crane
Condition:New
Model Number:TC7021(QTZ250)
Place of Origin: China (Mainland)
Brand Name: CMAX
Certification: ISO,CE
Warranty: 1 Year
Application:Building,Construction,Industrial
Main Features of Tower Crane
1) This kind of crane adopts standard section hydraulic lifting and connecting.The max. height can reach 180m with wall tie ins.
2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..
5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.
Specification of Tower Crane
Technical Sheet for TC7135
Free standing height (m) | 50 | ||||
Max height with attachment (m) | 200 | ||||
Working range can be adjusted(m) | 50、55、60、65、71 | ||||
Min working range(m) | 2.5 | ||||
Max lifting capacity(t) | 16 | ||||
Tip load @ 71m(t) | 3.5 | ||||
Hoist mechanism (VFD+PLC) | Falls | 2 | 4 | ||
Lifting capacity(t) | 0-4 | 0-8 | 0-8 | 0-16 | |
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | |
Motor | YZPBF280-8-55KW | ||||
Trolleying mechanism (VFD+PLC) | Speed(m/min) | 0-56 | |||
Motor | YPBE132M-4-7.5KW | ||||
Slewing mechanism (VFD+PLC) | Speed(r/min) | 0-0.6 | |||
Motor | YLEW112M-6-120N.M×2 | ||||
Climbing speed(m/min) | 0.5 | ||||
Counterweight(t) | 26 | ||||
Mast section size(L×W×H)m | 2×2×3 | ||||
Working temperature | -40-+60℃ | ||||
Total power (KW) | 95 | ||||
Power supply requirement (KVA) | 255KVA for generator | ||||
Cable type ( within 30 meters from site power source to lower electric box of tower crane ) | |||||
Startup voltage & current | 380V×95%=361V 260A | ||||
Rated working voltage & current | 380V 146A |
Loading diagram:
70m jib length:
R | 3.7~18.26 | 20 | 22 | 24 | 26 | 28 | 30 | 32 |
4 Falls (t) | 16 | 14.48 | 13.02 | 11.8 | 10.77 | 9.89 | 9.12 | 8.45 |
R | 34 | 36 | 38 | 40 | 42 | 44 | 46 | 48 |
4 Falls (t) | 7.86 | 7.34 | 6.87 | 6.44 | 6.06 | 5.71 | 5.39 | 5.1 |
R | 50 | 52 | 54 | 56 | 58 | 60 | 62 | 64 |
4 Falls (t) | 4.84 | 4.59 | 4.36 | 4.15 | 3.95 | 3.76 | 3.59 | 3.43 |
R | 66 | 68 | 70 | |||||
4 Falls (t) | 3.28 | 3.14 | 3 |
71m jib length:
R | 4.7~35.36 | 36 | 38 | 40 | 42 | 44 | 46 | 48 |
2 Falls (t) | 8 | 7.98 | 7.38 | 6.96 | 6.58 | 6.24 | 5.93 | 5.64 |
R | 50 | 52 | 54 | 56 | 58 | 60 | 62 | 64 |
2 Falls (t) | 5.37 | 5.13 | 4.9 | 4.7 | 4.5 | 4.32 | 4.15 | 3.99 |
R | 66 | 68 | 70 | 71 | ||||
2 Falls (t) | 3.84 | 3.7 | 3.56 | 3.5 |
65 m jib length:
R | 3.7~19.55 | 21 | 23 | 25 | 27 | 29 | 31 | 33 |
4 Falls (t) | 16 | 14.79 | 13.36 | 12.16 | 11.15 | 10.27 | 9.5 | 8.83 |
R | 35 | 37 | 39 | 41 | 43 | 45 | 47 | 49 |
4 Falls (t) | 8.24 | 7.7 | 7.23 | 6.8 | 6.41 | 6.05 | 5.73 | 5.43 |
R | 51 | 53 | 55 | 57 | 59 | 61 | 63 | 65 |
4 Falls (t) | 5.15 | 4.9 | 4.66 | 4.44 | 4.24 | 4.05 | 3.96 | 3.7 |
65m jib length:
R | 4.7~38 | 39 | 41 | 43 | 45 | 47 | 49 | 51 |
2 Falls (t) | 8 | 7.77 | 7.35 | 6.96 | 6.61 | 6.29 | 5.99 | 5.72 |
R | 53 | 55 | 57 | 59 | 61 | 63 | 65 | 66 |
2 Falls (t) | 5.47 | 5.23 | 5.02 | 4.81 | 4.62 | 4.45 | 4.28 | 4.2 |
60m jib length:
R | 3.7~21.45 | 22 | 24 | 26 | 28 | 30 | 32 | 34 |
4 Falls (t) | 16 | 15.57 | 14.13 | 12.93 | 11.89 | 10.99 | 10.2 | 9.51 |
R | 36 | 38 | 40 | 42 | 44 | 46 | 48 | 50 |
4 Falls (t) | 8.89 | 8.34 | 7.84 | 7.4 | 6.99 | 6.61 | 6.27 | 5.96 |
R | 52 | 54 | 56 | 58 | 60 | |||
4 Falls (t) | 5.67 | 5.4 | 5.15 | 4.92 | 4.7 |
60m jib length:
R | 4.7~41.9 | 44 | 46 | 48 | 50 | 52 | 54 | 56 |
2 Falls (t) | 8 | 7.58 | 7.21 | 6.87 | 6.56 | 6.27 | 6 | 5.75 |
R | 58 | 60 | 61 | |||||
2 Falls (t) | 5.52 | 5.3 | 5.2 |
55m jib length:
R | 3.7~21.54 | 23 | 25 | 27 | 29 | 31 | 33 | 35 |
4 Falls (t) | 16 | 14.89 | 13.57 | 12.45 | 11.48 | 10.63 | 9.89 | 9.24 |
R | 37 | 39 | 41 | 43 | 45 | 47 | 49 | 51 |
4 Falls (t) | 8.65 | 8.13 | 7.65 | 7.22 | 6.83 | 6.47 | 6.14 | 5.84 |
R | 53 | 55 | ||||||
4 Falls (t) | 5.56 | 5.3 |
55m jib length:
R | 4.7~41.6 | 43 | 45 | 47 | 49 | 51 | 53 | 55 | 56 |
2 Falls (t) | 8 | 7.71 | 7.33 | 6.98 | 6.65 | 6.35 | 6.08 | 5.82 | 5.7 |
50m jib length:
R | 3.7~22.4 | 24 | 26 | 28 | 30 | 32 | 34 | 36 |
4 Falls (t) | 16 | 14.85 | 13.58 | 12.5 | 11.56 | 10.74 | 10.011 | 9.37 |
R | 38 | 40 | 42 | 44 | 46 | 48 | 50 | |
4 Falls (t) | 8.79 | 8.27 | 7.8 | 7.38 | 6.99 | 6.63 | 6.3 |
50m jib length:
R | 4.7~43.6 | 44 | 46 | 48 | 50 | 51 |
2 Falls (t) | 8 | 7.92 | 7.53 | 7.18 | 6.85 | 6.7 |
Images of Tower Crane
FAQ about Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: i saw a PS3 in a claw crane game at Six Flags Over Georgia i wonder how you can win it. It is possible to win it... somehow. I thought that the strategy was to lift the prize that is closest to the hole. I almost won a Kinect that way. So are there any other strategies??? Don't say buy 1 or there isnt a way to win because there is.
- The crane machines work in such a way as to only make the claw strong enough to hold prizes after a certain amount of attempts so as to limit the amount of prizes taken.
- Q: I'm supposed to be critiquing an article for a class of mine.. and I don't feel like I understand the concept enough to critique his use of it... (It's an article about The Red Badge of Courage... the author talks about how the observing narrator Stephen Crane creates in the novel uses patterned reality without ambiguity... he's describing one of the scenes in which the dead soliders are somewhat personified.. describing them in terms of the living...... erm anyone take a class on realism? your help is greatly appreciated
- The okorder
- Q: the cable of Crane I creates and angle of 30 degree angle from the horizontal and the cable of Crane II creates an angle of 45 degrees from the horizontal.-draw a figure that gives a visual representation of the problem-write a vector to represent the tension on the cable of Crane I-write a vector to represent the tension on the cable of Crane II-write a vector to represent the 20000 lb cargo container being lifted -calculate the tension on both cables. Justify your answer.....please help me!!! thank you!!!!:)
- I find this question very interesting, i'll keep here waiting for the answer.
- Q: What does tower crane jacking up mean?
- First of all, the boom and trim balance arm, unlock the top are connected with a lifting sleeve frame with the standard section, start lifting system, lifting jack will superstructure.Jiangsu Zhendong port machinery manufacturing heavy port machinery is a professional manufacturer of mechanism
- Q: method how to assemble tower crane?
- Generally tower cranes are self erecting. The first mast and jib sections are assembled at ground level. The mast and jib are then jacked up and another mast section inserted. If the tower crane is not self erecting then mobile cranes have to be used to assemble the crane.
- Q: What is a TQ80 tower crane?
- A full swing jib crane with a tower type structure, a crane that can travel along the track and is equipped with a full swing arm.
- Q: It is my contention that God could be held accountable, at least as an accessory, for any crime. God had knowledge of these events in advance and did nothing.
- Denny Crane of course, it takes one god to defend another. (blasphemy FTW)
- Q: What type of tower crane does not include tower crane in variable amplitude mode?
- Mobile tower crane: a tower crane with running device and can walk.
- Q: Who is it? And when in the book do they say who it is?Thank you so much! :D
- was the head games maker in the first book or the 74th annual, now it's plutarch
- Q: I need it for my English class, not to cheat, but because my literature book only has an excerpt, in which I didn't even know Yukiko's name. And my teacher insists on finding it out for ourselves and I just want to know what the story is about and what the scandal repeatedly implied in the excerpt is.
- Apparently okorder /
Send your message to us
Tower Crane VFD PLC 16 Ton Max Capacity CMAX
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords