Tower Crane TC7135 Construction Equipment Building Machinery Sale
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC7135 Description:
1.CMAX Tower Crane TC7135 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC7135 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC7135 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC7135 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC7135 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC7135 Parameter:
Max. working range 71m, tip lifting weight 3.5T and Max. lifting weight 16T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 50
Max height with attachment (m) 200
Working range can be adjusted (m) 50、55、60、65、71
Min working range (m) 2.5
Max lifting capacity (t) 16
Tip load @ 50m (t) 3.5
Tower Crane TC7135 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC7135 Diagram:
Tower Crane TC7135 Technical Sheet:
Tower Crane TC7135 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC7135 for example, the first two letters “TC” means Tower Crane, “71”means jib length is 71 meter, and the last two letter “35” means the tip load is :3.5 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q: I've been thinking about selling origami and I think it will worked out. And also because this is my hobby and I want to have my own cash.
- I take it you are still in school. I would say 25 cents apiece, 50 for more complex designs.
- Q: Minimum QTZ63 tower crane special electric box open for many A
- Minimum QTZ63 tower crane special electric box for 100A circuit breaker. The maximum lifting weight is: 6T; lifting torque: 63kN; m; tower crane lifting height is 40m (independent), 140m (attachment); power: 31.7 kW; work range: 2---57m.
- Q: What does tower crane 400tm mean?
- Lifting torque of 400 tons. Meters, also known as 4000KN/m, refers to the QTZ400 tower crane, the general maximum lifting capacity of 25 tons, big arm 70 meters, the most front-end hanging 5.2 tons, independent height of about 70 meters. Normally we say QTZ40 tower crane is lifting torque of 40 tons. Meters, 400KN/m.
- Q: Tower cranes sometimes have very long booms, but seem to usually have fixed counter-weights at fixed positions behind the cab. Why doesn't it flip backwards when there is no load, or flip forwards when a load is way at the far outward end of the boom? It seems to be a very large range of moment arms given that the counter-weight has a fixed one.
- I think the counter weights are connected to a pully system that directly interacts with the boom and hook movement. This way it can put more or less pull on the weights according to the amount of weight or position of the weight on the crane.
- Q: Hi,I am looking for study for Design, Calculation and selection of Overhead Crane supporting Columns. (Not the Crane runner way beams ) Could you please suggest me the suitable references on internet?Thank You !
- See okorder /
- Q: Tower crane attached concrete pump can be? Are there any state regulations?
- Do not need to expressly can not tower crane work mode cannot withstand recoil thrust and level, and these forces or dynamic load, if the use of the tower crane is not an accident, almost impossible, then help the wall studs, will fall off, the consequences are not dare to think.
- Q: Do they need another crane to get the concerete blocks to the top? And how do they move the blocks from one end of the crane to another. This has been bothering me for some time so anyone who knows the answer I would love to hear it!
- Construction cranes are erected on site. They are usually assembled on the ground with small cranes, then lift themselves up. The erection sequence is carefully figured, so minimal other equipment is needed. For conventional cranes that are permanent and thus only assembled once, portable cranes are used to erect them. Still, generally pretty much on the ground. Some have counterbalances that are permanently fixed, others have a rail type mechanism that moves in and out.
- Q: how do you say paper crane in japanese?
- Origami is paper folding in general, whereas 折鶴 おりづる oridzuru means folded paper crane, or in context, people just use tsuru (crane).
- Q: i was wondering
- There is a legend that if a person makes 1000 cranes then they get one wish. Cranes are a sign of longevity in Japan and children often make cranes and bring them to a famous shrine in Japan. Not sure if its true or not. I'm testing it out now actually. Just 900 something more cranes to go.
- Q: I want to make a sculpture out of 1,000 paper cranes. I have sometime to work on it, but not months. Has anyone ever known someone to do this, or done this themselves? How much time should I allow for such a project?
- Do one and time it, then multiply by 1000. Subtract some time because you will get faster from experience.
Send your message to us
Tower Crane TC7135 Construction Equipment Building Machinery Sale
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords