• Tower Crane TC7050 Construction Equipment Building Machinery  Sales System 1
  • Tower Crane TC7050 Construction Equipment Building Machinery  Sales System 2
  • Tower Crane TC7050 Construction Equipment Building Machinery  Sales System 3
  • Tower Crane TC7050 Construction Equipment Building Machinery  Sales System 4
  • Tower Crane TC7050 Construction Equipment Building Machinery  Sales System 5
  • Tower Crane TC7050 Construction Equipment Building Machinery  Sales System 6
Tower Crane TC7050 Construction Equipment Building Machinery  Sales

Tower Crane TC7050 Construction Equipment Building Machinery Sales

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC7050 Description:

1.CMAX Tower Crane TC7050  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7050 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7050 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7050  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7050  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7050 Parameter:

 Max. working range 70m, tip lifting weight 5T and Max. lifting weight 20T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 50、55、60、65、70

Min working range (m) 2.5

Max lifting capacity (t) 20

Tip load @ 50m (t) 5


Tower Crane TC7050 Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7050 Diagram:

Tower Crane TC7050 Construction Equipment Building Machinery  Sales

Tower Crane TC7050 Construction Equipment Building Machinery  Sales

Tower Crane TC7050 Technical Sheet:

Tower Crane TC7050 Construction Equipment Building Machinery  Sales

Tower Crane TC7050 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7050 for example, the first two letters “TC” means Tower Crane, “70”means jib length is 70 meter, and the last two letter “50” means the tip load is :5 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q: I was wondering if anyone knows what period this book is set in? I know that it's set in the slums of New York and the story was published in 1893. But what time period does the story actually take place?
hah ha i'm in your class too :) This project sucks... and I still haven't done it! I have to tonight..
Q: It`s like a big box filled with toys and u insert a coin and then u have 2 handle the small crane to pick up a toy...
Skill Crane. We used to have one in our arcade.
Q: I am writing an annotated bib about this topic and I'm not sure where to start looking or what could and couldn't be considered as a theme.
Stephen Crane Works
Q: How do we build an ELECTROMAGNETIC crane?
its pretty basic tech, first of all you need a crane then you need to attach an electro magnet, the magnet is comprised of copper cable wound into a circular shape inside an iron casing (it would work just as well on the outside of an iron disk but the cable would be damaged and the magnet would stop working) the more winds the cable has the stronger the magnet, next the two ends of the cable are connected to a power source (negative and positive) turn the power on to activate the magnet turn the power off to deactivate it..... simple really
Q: as the crane cabin temprature is very high which is not good for equipment pls advise which air condition is good for colling
Any crane worth it's salt can take the temperature but for the operator you can do a Coleman RV Air Conditioner.
Q: i need help...its 4 an powerpoint due 2marrow. please help in any way you can
Sand Hill Cranes are migratory birds. Their population will vary based on the time of the year.
Q: Tower cranes, TC7525-16D, TC5610, TC6015A-10E, ZJ5910, D800-42, the power of these models is how much ah?I hope you can help me. I'm in a hurry!! Thank you!
TC7525-16D switchboard power 80KWTC5610-4 switchboard power 34KW.TC6015A-10E switchboard power 71.5KWThe other two types have not been touched and will not be answered. I'm sorry
Q: The car weights approx 900 kg.Thank you xx
Gravity acts downwards, force = mass x acceleration. Crane acts upwards at same force. As the crane starts to lift the car there is upwards acceleration that causes more force to be generated for a moment.
Q: What is the load moment of a crane?
The load moment for a crane is a number measuring the weight of the load lifted times the distance between the mass and the centre of the crane's superstructure. For example, a 20 ton weight lifted at 5m away from the crane (in reality, right next to it!) gives us a load moment of 100 ton*m, the same as a 10 ton weight lifted 10m from the crane. Cranes can handle higher load moments closer to the crane, so really heavy lifts are always done from very close to the load.
Q: If you make 1000 origami cranes is it true that you will get a wish or good luck. This is based on a Japanese myth
That depends on your wish. If your wish is to have 1000 origami cranes or your wish is that you become really good in folding origami cranes I would think it will come true. But maybe you could also wish for a smile from every stranger you give an origami crane to as a present, you might not even have to wait until you've made 1000.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords