• Tower Crane TC7050 Construction Equipment Building Machinery  Sales System 1
  • Tower Crane TC7050 Construction Equipment Building Machinery  Sales System 2
  • Tower Crane TC7050 Construction Equipment Building Machinery  Sales System 3
  • Tower Crane TC7050 Construction Equipment Building Machinery  Sales System 4
  • Tower Crane TC7050 Construction Equipment Building Machinery  Sales System 5
  • Tower Crane TC7050 Construction Equipment Building Machinery  Sales System 6
Tower Crane TC7050 Construction Equipment Building Machinery  Sales

Tower Crane TC7050 Construction Equipment Building Machinery Sales

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC7050 Description:

1.CMAX Tower Crane TC7050  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7050 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7050 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7050  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7050  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7050 Parameter:

 Max. working range 70m, tip lifting weight 5T and Max. lifting weight 20T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 50、55、60、65、70

Min working range (m) 2.5

Max lifting capacity (t) 20

Tip load @ 50m (t) 5


Tower Crane TC7050 Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7050 Diagram:

Tower Crane TC7050 Construction Equipment Building Machinery  Sales

Tower Crane TC7050 Construction Equipment Building Machinery  Sales

Tower Crane TC7050 Technical Sheet:

Tower Crane TC7050 Construction Equipment Building Machinery  Sales

Tower Crane TC7050 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7050 for example, the first two letters “TC” means Tower Crane, “70”means jib length is 70 meter, and the last two letter “50” means the tip load is :5 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q: I had this dream where I was watching a flock of Sandhill Cranes on a road. Cars were swerving to avoid them, but one sporty red car lost control and smashed into a brick wall, killing some of the birds. The rest of the cranes started freaking out, flapping their wings and coming towards me. They were so frightened that they started to defecate too. Soon though, there was so much bird poop that it became like a river ready to engulf me. It was like a glowing white too (really weird, I know).Then, their legs turned into human legs, and the cranes turned into tall, beautiful humans with wings - angels, I think. These beings radiated power and filled me with terror as they approached. They must have been 8 feet tall and they towered over me. One red-headed angel looked at me when he passed, and I was so terrified that I woke up.Any ideas about what this could mean? It's one of the most powerful dreams I've ever had.
First of all, to see a crane in your dream, represents happiness, maternal love, and your gestures of good will. You look out for those who are near and dear to you. Alternatively, a crane signifies tact, immortality or vigilance. Furthermore, dreaming of an angel can mean two things. Purity, protection, comfort and consolation. Pay careful attention to the message that the angels are trying to convey. These messages serve as a guide toward greater fulfillment and happiness. Alternatively, it signifies an unusual disturbance in your soul. Angels may appear in your dream as a result of your wicked and mean-hearted activities.
Q: I have seen a crane sitting in a tree watching over the pond in my front yard. I have never seen any fish in the pond and so i am curious as to why the crane is there. I thought cranes only hangout by ponds if there are fish. Does anyone have an research hypotheses to why the crane is there?thanks in advance
They also eat bugs and little critters. It could have been looking just outside of the pond, also it could have not known there weren't any fish and thought to give it a try anyhow.
Q: or is jason mraz just making up things for lyrics?
Plenty of cranes are built on the shop floor and lifted in place....so no it doesn't take a crane to build a crane. There are cranes that need another crane and that is the the ones used in the center of new skyscrapers where they build a hoist on top of the building to add to the length of the main crane. So maybe that is the kind he is talking about
Q: Are there any NECs that let them do so? Maybe Minesweeping Bosn Mate?
In the latest update to the NEOCS Manual Vol II (NECs) I no longer see an NEC for BM for Crane Operator. Volume II Navy Enlisted Classifications (NECs) NAVPERS 18068F April 2011 NEC Chapter 4 RATING SERIES AND SPECIAL SERIES NECS www lic.navy.mil/bupers-npc/re...
Q: Our company is responsible for the general contracting construction project foundation pile by Party A but other subcontractor for the construction of pile foundation of a pile foundation the company has quickly completed the construction scheme of the party and the supervision of tower crane foundation now has been reported by the audit Party B must contact us pile pile. We believe that Party A shall bear it at one time. Ask the net friend is this so?
In fact, in the long run, in a word, what the construction site is finally all party a pay, just clearing the count.
Q: I have to build a hydralic system that can pick up a paper clip . the supplies you are allowed to use are 10 straws, 5 pipe cleaners, 1 yard of masking tape. 10 note cards. 2 syringes and tubing. 5 rubber bands. 8 popsicle sticks. 2 feet of string. 1 magnet. Please help.
build a basic crane out of your materials and thread the string to the magnet hold it on with tape secure opposite end of the string to the plunger on one syringe. and fix this syringe(syringe 1) to the frame of the crane. position the plungers of both syringes at mid point, and fill both with water, and fill your tubing with water. connect the needle ends of both syringes together with the tubing. pushing the plunger on syringe 2 will cause the plunger in syringe 1 to move out. pulling the plunger on syringe 2 will cause the plunger on syringe 1 to retract and can be used to lift the paperclip.
Q: this wind speed refers to that height of wind speed?
Surface wind speed is greater than 6
Q: Romney woulda had that thing fixed by now.
Obama hates cranes!
Q: How do cranes get from one construction site to another without hitting streetlights, wires, car, buildings?
They are disassembled and carried via a truck to the next job site. Also some cranes are built into a truck and so they retract into itself and make it easier to get around in a city. Also in order to be a crane operator you have to have special certification and training. For the larger cranes that are able to be on the road, some times police departments well shut down roads in order for it to move around in the city.
Q: It got me thinking.
I have not seen the movie, but I think I saw what you're talking about on a preview. I would think that the safeties involved in the control system for a crane would make it highly unlikely to happen. There is no absolute assurance, only probabilities or likelihoods. You just hope that you have enough failsafes in the system so if one part of the system fails, the others will take over, or shut the whole thing down properly.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords