• Tower Crane TC5516 Sale Construction Equipment Building Machinery Sales System 1
  • Tower Crane TC5516 Sale Construction Equipment Building Machinery Sales System 2
  • Tower Crane TC5516 Sale Construction Equipment Building Machinery Sales System 3
  • Tower Crane TC5516 Sale Construction Equipment Building Machinery Sales System 4
  • Tower Crane TC5516 Sale Construction Equipment Building Machinery Sales System 5
  • Tower Crane TC5516 Sale Construction Equipment Building Machinery Sales System 6
Tower Crane TC5516 Sale Construction Equipment Building Machinery Sales

Tower Crane TC5516 Sale Construction Equipment Building Machinery Sales

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Tower Crane TC5516 Description:

1.CMAX Tower Crane TC5516  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC5516  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC5516 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC5516  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC5516  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC5516  Parameter:

 Max. working range 55m, tip lifting weight 1.6T and Max. lifting weight 8T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 44

Max height with attachment (m) 150

Working range can be adjusted (m) 44、50、55

Min working range (m) 2.5

Max lifting capacity (t) 8

Tip load @ 50m (t) 1.6 


Tower Crane TC5516   Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC5516 Diagram:

Tower Crane TC5516 Sale Construction Equipment Building Machinery Sales

Tower Crane TC5516 Sale Construction Equipment Building Machinery Sales


Tower Crane TC5516 Technical Sheet:

Tower Crane TC5516 Sale Construction Equipment Building Machinery Sales

Tower Crane TC5516 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC5516 for example, the first two letters “TC” means Tower Crane, “55”means jib length is 55 meter, and the last two letter “16” means the tip load is :1.6 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q: i am making a wired crane robot to pick and drop a wooden block of about 5*5*10cm dimension. I would like to know wat r the different possible lifting mechanisms by which i can lift the wooden block.Ideas other than the normal claw shaped lifters
There are different attachments that you can put on the end of your crane to pick up this block. You can make a set of forks (like a forklift) that would slide under the block (block would have to be elevated on a skid). You can pick up this block with a suction cup. You can also pick up the block by clamping the sides of the block by replicating a scissor type mechanism.
Q: What is the function of the balance valve in the hydraulic jacking system of tower crane?
The function of the balance valve is to maintain the balance of the oil pressure, the hydraulic oil delivery flow is stable, so that the tower crane jacket and the upper part of the lift, disassembly, standard time, lift and smooth.
Q: How does a crane get down from a skyscraper once they're done using it? Like the crane on top of the skyscraper, do they get take it apart?
realdolby is correct. Small crane from parts that can be transported in service elevator is brought up and assembled. It is used to swing out and lower larger crane's parts. Then the small crane is broken apart and taken down in elevator.
Q: Calculate the work the crane performs.
Crane work = weight to be lifted x 6.95 m Weight to be lifted = 2.75x10^3 N + 1.20 m^3 (2.00 x 10^3 kg/m^3) (9.8) = 2750 + 23520 = 26270 Therefore, Crane work = 26270 x 6.95 = 182576.5 J
Q: In the private training session, Katniss Everdeen creates a noose, hangs a practice dummy, and uses the paint to write: Seneca Crane. I know this name is mentioned earlier in the book, but I don't remember who Seneca Crane is... Remind me, please?
Seneca Crane is the previous Gamemaker who decided to allow Peeta and Katniss to live after the berry incident. The Capitol killed her and replaced her for that act of mercy. That's why Katniss hung her; she was rebelling against the Capitol and implying that they murdered Seneca Crane.
Q: Firstly I know there is a very good club near me which does 5 lessons a week, just to let you know.Firstly could you please tell me how much of white crane is actually fun and how much percentage is kicks and how much punches.I'm a very althletic boy age 15 and I don't know much about this style. Is it fairly exciting and what I might enjoy?Thanks for you help.
white crane kung fu
Q: What time period would you consider that Stephen Crane wrote in? I have no idea. By time period, I mean like the kind of writing from those times. Ex: Renaissance Period.
I beleive that he was active around or just after the Civil War. American Romantic?....I know he had a short life (died young)....
Q: I've always been puzzled how cranes operate.Because as buildings get taller so do cranes but i don't know how they increase the height of the cranes.Can you help answer this please?
search for others, animation and video of process more edit Some cranes actually climb the structure of the building and are taken apart when the building reaches its full height.
Q: I've been wondering and haven't been able to find any information on it. Where does the sky crane go after it drops off Curiosity? You see it fly off in all of the videos, but no information is given on where it goes? Does anyone know?
If you download the simulation called Eyes on the Solar System from NASA, you can watch the sky crane crash somewhere off in the distance in the same crater that Curiosity is in. It had quite a bit more reserve fuel than they expected so it might have flown further than shown. edit: they might have disabled that simulation now. I can't get it to work.
Q: heres a picture of one
they are put up section by section with another crane

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords