• Timer Beam FORMWORK SYSTEMS for Indonesia Customer System 1
  • Timer Beam FORMWORK SYSTEMS for Indonesia Customer System 2
Timer Beam FORMWORK SYSTEMS for Indonesia Customer

Timer Beam FORMWORK SYSTEMS for Indonesia Customer

Ref Price:
get latest price
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
10000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specifications

Flange: Spruce
Thickness of Web: 27mm(+/1mm)
Poplar Plywood web in WBP glue
Painting: Yellow Waterproof Paint

H20 TIMBER BEAM

 

H20 BEAM(I-BEAM)

Flange: Spruce
Thickness of Web: 27mm(+/1mm) 
Poplar Plywood web in WBP glue 
Painting: Yellow Waterproof Paint 
Length: from 1m to 6m

Length longer than 6m can be special ordered.

Application: Formwork

 

Specifications

Item

Formwork H20 Timber Beam

Wing Material

Imported spruce solid wood, finger-jointed and glueing according to DIN 68140-1

Web Material

Multilayer poplar plywood

Head Protection

Injection molding plastic head

Glueing

Finger-jointed between wings and web pursuant to approval notice Z-9.1-146

Moisture Content

less than 12% at the time of delivery

Surface Protection

The complete beam is waterproofed using a water-repellent color glaze

Color

Yellow or as customer's request

Wing Size

80x40mm

Standard lengths

2.45 / 2.90 / 3.30 / 3.90 / 4.90 / 5.90 m (Max.length:6.00m)

Mechanical Specification

Modulus of elasticity : E 11,000 N/mm2

Shear modulus : G 600 N/mm2

Packing

Pallet or in bulk

Application

Level formwork system, Vertical formwork system, Adjustable formwork system, Curve formwork system, Irregular formwork, etc. 

Timer Beam FORMWORK SYSTEMS for Indonesia Customer

Timer Beam FORMWORK SYSTEMS for Indonesia Customer

Timer Beam FORMWORK SYSTEMS for Indonesia Customer

Timer Beam FORMWORK SYSTEMS for Indonesia Customer

Timer Beam FORMWORK SYSTEMS for Indonesia Customer

Timer Beam FORMWORK SYSTEMS for Indonesia Customer

Timer Beam FORMWORK SYSTEMS for Indonesia Customer

 

Q: What are the sectors of machine building and parts processing?
Industry to classify, it is not very strict. For example, the insurance industry, mining, energy, food, hotels, real estate services industry, garment industry, advertising industry, aerospace, aviation, chemical, chemical, construction, health care, education, training, computer, metal smelting, fire, police, soldiers, accounting, beauty, body, media, publishing, wood, paper retail, wholesale, agriculture, tourism, justice, lawyers, sports, sports, arts, entertainment, medical, art, design, banking, finance, Internet, music, dance, postal, courier, transport, consulting services.
Q: What are the principles, performances and uses of the commonly used construction machinery equipment?
1.: concrete pump principle: concrete pump driven by motor pump system, the conveying capacity of constant power control of hydraulic system of concrete pump automatic control, manual control can also be used to select the concrete delivery volume. Performance: 1. using the hydraulic system of double pump double open circuit, the main pump valve swing circuit and S circuit are separate for fault diagnosis and removal; 2. pumping hydraulic circuit adopts the main valve pilot pressure control; 3. hydraulic system has safe relief protection, while the main pumping system overpressure, oil pump automatic pressure cutting off; 4. switching circuit with constant voltage supply with the energy storage device, so as to guarantee reliable swayingforce large and have the advantages of energy saving effect; 5. pumps and valves are used continuously, the world famous brand is more reasonable and more reliable and easily realized commodity concrete transport quantity adjustment; 6. hydraulic pipeline with cone seal pipe joint sealing material; 7. pumping circuit adopts a valve block mode of high and low voltage switch, convenient, no leakage; 8. with oil and oil filter technology, foreign body into the hydraulic system. Further improve the hydraulic system reliability and component life; 9. hydraulic hose hose. Use: widely used in commercial concrete demand for large, high grade and strict quality requirements, long conveying distance of high-rise buildings, municipal construction, electric power, energy, transportation and other civil and industrial buildings, especially the construction of the narrow space more show its true colour of a hero.
Q: What is the use of spare parts prices in Chinese market by foreign companies?
But there is always somebody to ask, just like a college paper, where everyone can read or keep secrets, but collecting them and sending them to foreigners is a sign of treason
Q: How are the machine parts stacked?
Then there is a point to note, that is, from there to get used, must be put back where, so that will be organized, all things are owned by you, it will not mess.
Q: What type of industry does the machinery and building accessories processing belong to?
Every industry has average tax rate, the contribution of each this argument does not exist, the industrial enterprise is nade VAT. The more value-added products you pay more.
Q: How do the welding parts in the welding drawings of the machine parts indicate the technical requirements of the drawings?
The whole circle of the triangle is welded as an angle weld, and the other is the outer circle with the same diameter as the two, so the butt joint is better to open the groove. Welding, for V type welding seam, and, technical requirements are generally, welding firm, no defects, welding smooth grinding, cleaning welding slag splash
Q: What are the world famous mechanical equipment exhibition?
2 、 Las Vegas Construction Machinery Exhibition (Conexpo-Con/Agg) sponsored by the American equipment manufacturers association, the American precast concrete association, the United States sand association. It is the world's second largest construction machinery exhibition after BAUMA. The exhibition, sponsored by the American Association of equipment manufacturers, has been held every three years for nearly a hundred years. The next exhibition will be held on March 2017 7-11. The exhibition is of great size and numerous merchants. It has focused on world famous brands such as Caterpillar, Komatsu, Liebherr and Volvo. It is an important platform for displaying the latest technology, equipment and products in the industry.
Q: How are buildings, installations and materials divided?
Provisions on the division of equipment and materials for engineering construction? [answer] the division of equipment and materials in engineering construction is directly related to the reasonable division of investment structure, budget preparation and calculation of construction output value. In order to reasonably determine the project cost, strengthen the investment in the process of construction and management, the equipment and materials in the engineering construction is unclear, especially the universal controversial common problems and put forward the principle of division of fifteen copies of "national unified installation project budget quota" of the equipment and materials are divided, the provinces, autonomous regions and municipalities directly under the central government and the relevant departments of the State Council, the Department should be combined with the local situation, formulate rules for its implementation, and report to the Ministry of construction for the record.
Q: Where does Heilongjiang do the most construction machinery?
It is mainly used for national defense construction project, the construction of transportation, energy industry construction and production, mining and other industrial raw materials, construction and production, forestry and water conservancy construction, industrial and civil construction, city construction and environmental protection.
Q: What are the sub projects of a construction project?
Appendix B Construction Engineering Division (sub branch) engineering, sub project division, B.0.1 Construction Engineering Division (sub branch), engineering, sub projects can be divided into table B.0.1. Table B.0.1 division number of construction works, sub works and sub projects

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords