• Timer Beam Formwork System with high quality System 1
  • Timer Beam Formwork System with high quality System 2
  • Timer Beam Formwork System with high quality System 3
  • Timer Beam Formwork System with high quality System 4
Timer Beam Formwork System with high quality

Timer Beam Formwork System with high quality

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 m²
Supply Capability:
100000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. CMAX Timber-beam Formwork Description 

CMAX Timber beam formwork is used for concrete wall pouring. The application of CMAX timber beam formwork greatly increased construction efficiency and reduced the cost. 

Timber beam formwork system mainly consist of formwork system and pull-push prop system.Timber beam formwork is made of plywood, timber beam and steel waling. Pull-push props can be specially designed according to the project requirements or equip the standard props. Timber beam formwork is convenient for construction and easy to control the project quality. 

2. Main Features of CMAX Timber-beam Formwork System

- Easy to set up, 

- Convenient for construction

- Economic, and easy to control project quality


3. Specifications of CMAX Timber-beam Formwork

- Shearing force failure load: 40kg

- Supply capability: 3000m/day, L=6600mm, T=18mm &T=21mm

- Moisture content 10%


4. CMAX Timber-beam Formwork System Application


Timer Beam Formwork System with high quality

Timer Beam Formwork System with high quality


5.  FAQ of CMAX Timber-beam Formwork System

1) What can we do for you? 

We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

We can provide you the professional design team.    

We can provide fashionable and newest styles for you.    

We can design the artwork for you.    

Please feel free to customize.  

 

2) What promises can be done by us?

- If interested in Timber-beam Formwork, please feel free to write us for any QUOTE.

- If printing required, please advise asap because the whole set need much more time to complete.

Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about the package and shipping time?

Packing:  As Customer's Requirements

Shipping: We have various shipping ways for our customers, such as express, by air/ sea etc.  

Shipping time: Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

Q: What is the use of building wall formwork support? Thank you
To build a scaffold to form a bracket supported by steel or wood, and with steel formwork concrete construction.
Q: Technical specification for construction formwork safety JGJ162-2008 who has made me please
This specification is applicable to the design, manufacture, installation and dismantling of the cast-in-place concrete engineering formwork system in construction.
Q: 1, JGJ162-2008 construction formwork safety technical specification;2, JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications; the friend has. Send me thanks
General principles for the implementation of 1.0.1 in the construction of formwork engineering in China to implement the principles and policies of safe production, to achieve advanced technology, economic and reasonable, easy to apply and to ensure safety in production, the development of this specification. 1.0.2 This specification is applicable to the design, manufacture, installation and dismantling of the cast-in-place concrete engineering formwork system in construction. 1.0.3 template design and construction, from the actual situation of engineering, reasonable selection of materials, scheme and construction measures; should satisfy the template in the transport, installation and use of the strength, stability and stiffness requirements, and should give priority to the finalization, standardization and template template support components, reduce production and installation work to improve the reuse rate. The design, manufacture, installation and removal of the 1.0.4 construction formwork shall be in conformity with the requirements of this code, and shall comply with the relevant provisions of the state.
Q: 86335 template support, what is the concept of those advantages
In the case of the construction industry, after 20 years of this industry, dedicated to technical analysis and improvement. After painstaking research, invited the domestic industry elite Magi to discuss, repeated demonstration, combined with the actual measurement through the practice of technical staff, spend long time hard work. Finally invented this new type of digital steel template support combination structure, so far spent ten years of painstaking research on the huge sums of money technology finally succeeded. To fill the gaps at home and abroad (with our understanding of the current international and domestic architectural template combination structure has not been any new structure), and won the national invention patent.
Q: Since the building, and I would like to ask some of the basic knowledge to the construction of a unified drawing, plus or minus 0 and the height of the drawings, the roof slope requirements. Now the blue steel reinforced concrete inclined roof beams or do. Here we use multiple beams, and the waterproof, thermal insulation, in tile. Anyway, many shortcomings is wood, attic space basically scrapped, there is a fire started...I would also like to use concrete flat top, that is, do not let, more depressed.If I can use wooden beams, waterproof SBS, hanging plastic extruded board?The construction of plastic extruded board in inclined roof beams hung strong? Construction is not difficult?As well as the 8X11 meters of the roof, 30 degrees slope, sloping roof concrete cost about? I feel modeling and cloth reinforcement are very troublesome, expensive cost estimation
You can put the beam properly after the play flowers on top, which is the slope of the wall, so that you can
Q: What is the building template support
(3) the characteristics of the new steel building formwork support:Features: keel tight flexible connection not only makes the operation simple and easy, and the structure is stable;Features two: retractable keel allows you to be able to adapt to any size; characteristics of the three: the column and the keel is not only simple and more flexible connection;Features four: tie rod light not only save material, and is more flexible and firm, flexible fastener is a must;Features five: compared to the wooden beam structure is more accurate, more solid; characteristics of the six: the construction site is beautiful and clean, greatly enhance the corporate image, highlighting the strength of the enterprise;Features seven: labor, material saving, time saving, more secure; features eight: do not use wood, products can be reused, so that the construction cost is greatly reduced.Building houses are required to achieve a certain level of earthquake, so the general buildings are cast in situ floor and shear wall structure,Formwork supporting composite structure

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches