• Timber Beam Formwork system H20 System 1
  • Timber Beam Formwork system H20 System 2
  • Timber Beam Formwork system H20 System 3
Timber Beam Formwork system H20

Timber Beam Formwork system H20

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Characteristics:

◆ Standardized production lines.

Supply capability: 3000m/day, Lmax = 6600mm.

◆ Finger jointing of the flange and web, the strength of timber beam is highly improved.

Max. shearing force failure load:40KN

◆ Well treated to prevent from water penetration or erosion, so the service life maximally extended.

Normally, CNBM timber beam H20 can be used for 4 to 5 years, the exact using time would depend on maintenance & storage.

◆ Robust caps at the end of the girders protect against damages.






Q: What is the use of building wall formwork support? Thank you
To build a scaffold to form a bracket supported by steel or wood, and with steel formwork concrete construction.
Q: Technical specification for construction formwork safety JGJ162-2008 who has made me please
This specification is applicable to the design, manufacture, installation and dismantling of the cast-in-place concrete engineering formwork system in construction.
Q: 1, JGJ162-2008 construction formwork safety technical specification;2, JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications; the friend has. Send me thanks
3 2.1.12 flying die flying shuttering mainly by the platform board, support system (including beam, support, support, legs, etc.) and other accessories (such as lifting and walking mechanism, etc.). The utility model is a large tool type template, which is called a table mould or a table model because of the appearance of the utility model. Because it can take advantage of lifting machinery, pouring from the well under the floor of the lift out of the transfer to the upper layer of repeated use, so called flying mode. 2.1.13 tunnel mode tunnel shuttering a combination of stereotypes template, while pouring concrete wall and floor of the template, because the shape of the template like a tunnel, it is known as the tunnel model.
Q: 86335 template support, what is the concept of those advantages
86335 new formwork support structureDigital steel formwork support composite structureAt present, in the construction for concrete cast-in-place construction formwork supporting structure, widely used in steel or timber beams assembled into the template bracket, built into the scaffold to form a bracket supported by steel or wood, and with steel formwork concrete construction. The problem is to build and assembling workload, low construction efficiency, labour and material consuming and poor quality, waste of resources, not beautiful and difficult to adjust
Q: Since the building, and I would like to ask some of the basic knowledge to the construction of a unified drawing, plus or minus 0 and the height of the drawings, the roof slope requirements. Now the blue steel reinforced concrete inclined roof beams or do. Here we use multiple beams, and the waterproof, thermal insulation, in tile. Anyway, many shortcomings is wood, attic space basically scrapped, there is a fire started...I would also like to use concrete flat top, that is, do not let, more depressed.If I can use wooden beams, waterproof SBS, hanging plastic extruded board?The construction of plastic extruded board in inclined roof beams hung strong? Construction is not difficult?As well as the 8X11 meters of the roof, 30 degrees slope, sloping roof concrete cost about? I feel modeling and cloth reinforcement are very troublesome, expensive cost estimation
You can put the beam properly after the play flowers on top, which is the slope of the wall, so that you can
Q: What is the building template support
The main: length may be 1.17 meters and 4.39 meters between any adjustment for short distance, main keel balcony and bathroom, small room.Vice: the length of 1.15 meters, 0.8 meters and 0.4 meters specifications.Support rod: height can be adjusted between 2 meters and 4.80 meters, such as the height of the building with the connecting rod arbitrarily high.