Telescopic Ladder Work Lift Platform
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 500 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Telescopic Ladder Work Lift Platform is used for aerial working, for the construction, workshop, hotel, and so on.
GTTY-A Single ladder model(capacity:200kg) | ||||||
Model | Height | total dimension M | down speed | TableSize | rated power | gross weight |
GTTY-6A | 6m | 1.02*0.92*1.8 | 0.054M/s | 0.75*0.75m | 1.1kw | 480kg |
GTTY-8A | 8m | 1.16*0.92*2.05 | 0.044M/s | 0.8*0.8m | 1.1kw | 580kg |
GTTY-10A | 10m | 1.16*1*2.17 | 0.04M/s | 0.8*0.8m | 1.1kw | 650kg |
GTTY-12A | 12m | 1.4*1.23*2.23 | 0.03M/s | 0.8*0.8m | 1.1kw | 900kg |
GTTY-14A | 14m | 1.4*1.23*2.3 | 0.028M/s | 0.8*0.8m | 1.1kw | 1075kg |
GTTY-15A | 15m | 1.4*1.23*2.4 | 0.026M/s | 0.8*0.8m | 1.1kw | 1200kg |
GTTY-B Pair ladders model (capacity:150kg) | ||||||
Model | Height | total dimension m | down speed | Table Size | rated power | gross weight |
GTTY-16B | 16m | 1.68*1.39*2.36 | 0.026M/s | 0.8*0.8m | 1.5kw | 1350kg |
GTTY-18B | 18m | 1.78*1.47*2.6 | 0.026M/s | 0.8*0.8m | 1.5kw | 1430kg |
GTTY-20B | 20m | 1.78*1.56*2.65 | 0.042M/s | 0.8*0.8m | 1.5kw | 1650kg |
GTTY-21B | 21m | 1.78*1.56*2.7 | 0.04M/s | 0.8*0.8m | 1.5kw | 1700kg |
GTTY-22B | 22m | 1.97*1.65*2.8 | 0.035M/s | 0.8*0.8m | 1.5kw | 1850kg |
GTTY-23B | 23m | 1.97*1.65*2.9 | 0.03M/s | 0.8*0.8m | 1.5kw | 2000kg |
GTTY-24B | 24m | 1.97*1.65*3.0 | 0.043M/s | 0.8*0.8m | 1.5kw | 2200kg |
GTTY-25B | 25m | 2.05*1.75*3.05 | 0.042M/s | 0.8*0.8m | 1.1*2kw | 2350kg |
GTTY-26B | 26m | 2.05*1.75*3.2 | 0.04M/s | 0.8*0.8m | 1.1*2kw | 2450kg |
GTTY-28B | 28m | 2.2*1.8*3.05 | 0.034M/s | 0.8*0.8m | 1., 1*2kw | 2500kg |
GTTY-30B | 30m | 2.25*1.9*3.25 | 0.034M/s | 0.8*0.8m | 1.1*2kw | 2800kg |
GTTY Tiltable lift platform (capacity:150kg) | ||||||
Model | Height | total dimension m | down speed | Table Size | rated power | gross weight |
GTTY-20 | 20m | 2.8*1.45*2.2 | 0.04M/s | 0.8*0.8m | 1.5kw | 2350kg |
GTTY-22 | 22m | 2.9*1.45*2.25 | 0.04M/s | 0.8*0.8m | 1.5kw | 2500kg |
GTTY-24 | 24m | 3*1.5*2.25 | 0.035M/s | 0.8*0.8m | 1.5kw | 2650kg |
GTTY-26 | 26m | 3.1*1.5*2.3 | 0.03M/s | 0.8*0.8m | 1.1*2kw | 2800kg |
GTTY-28 | 28m | 3.2*1.6*2.35 | 0.03M/s | 0.8*0.8m | 1.1*2kw | 3000kg |
GTTY-30 | 30m | 3.2*1.6*2.35 | 0.03M/s | 0.8*0.8m | 1.1*2kw | 3200kg |
- Q:Construction basket for hanging basket
- Suspension platform: suspension platform is the working area of construction personnel. He is composed of high and low railings, basket bottom and hoist mounting frame. The four parts are assembled by bolts
- Q:Electric basket acceptance should pay attention to what problems?
- The installation and disassembly of the basket (including the two shift) is carried out by the property right unit. Basket installation and disassembly (including the two shift) before, should develop the installation and disassembly program, and reported to the general contractor units and supervision units for the record, while the installation of workers to carry out safety technical disclosure. The general contractor shall ensure that the installation conditions are met at the site. The installation and disassembly of the basket (except the Porter) shall be valid for the construction operation qualification certificate of special construction operation. It is forbidden to install or disassemble the gondola without permission.
- Q:Kind of basket flower, how to raise?
- Chlorophytum watering humid environment, easy to keep moist pentu. However, the fleshy roots of the suspension can store large amounts of water, so they have strong drought resistance and will not dry for days without drying them. Winter 5 degrees below, less water, basin soil should not be too wet, otherwise the leaves yellowing.
- Q:Tianjin building more than meters, not allowed to use hanging basket construction
- If it is still not permitted, it may be used in the form of exterior wall materials, such as rail cranes, launch vehicles, etc..
- Q:When will the manual lifting cradle be used?
- While hanging scaffolding refers to the scaffold in advance assembled against the wall scaffolding welded on the vertical channel, the reserved hole on the wall by a screw fixed scaffolding attached to the walls, lifting tower crane is used for hanging scaffold, remove the screw, and then enhance the hanging to the upper wall. Because the safety factor of hanging scaffold is not high, the state has not advocated the use of pylons.
- Q:Construction plan for mounting basket on steel pipe support frame
- (3) the front and rear beams are respectively arranged before and after stent insertion within the casing, with the beam to the front and rear beams set, and according to the situation before the selected overhanging beam, the distance between the front and rear supports should be put to the maximum, will be placed on the front seat pillar rod sleeve. The small connecting sleeve is arranged on the inserting rod sleeve of the back support, and is fixed by bolts, and the bracket is assembled and completed.
- Q:What issues should I pay attention to when removing the galvanized basket?
- 4 remove the cable from the temporary electric basket, the distribution box and the hanging basket: and roll into the disc. 5, the wire rope unloading down to the roof, a disc. 6 、 dismantle the roof suspension device and do the protection work. 7, remove the counterweight, in front of the front and rear bracket of the electric basket, can pad a number of boards.
- Q:What should I do when the hanging frame of the basket is stopped?
- Must be placed on the ground or platform, can not let the basket platform shaking, taut four steel rope and cable big rope, basket platform from the wall at least twenty centimeters above
- Q:Which is better?
- The factory is almost all basket basket basket and the welding of the suspension of other accessories are from other places to buy their own accessories so it is good the hanging basket hoisting machine can glide Kingmas qianghui Little Swan Road up to the proliferation of fake slippery rope questions always solve not good-looking basket and hanging watch the weight of the welding effect whether the design is reasonable is the best surface treatment of hot galvanizing and long service life a lot or very effective when other accessories wire rope can be full of hot galvanized Czech faersheng too expensive cable 2 around the square is very good for the whole series of the safety rope or twist the middle do not buy the strip distribution box inside look at the components preferably CHINT grasp these basically you buy the basket is good
- Q:How about the sudden suspension of aerial homework basket?
- 4) cut off the power supply, remove the cable from the two power distribution box and the hanging basket, and recover the cable. The safety rope is retracted and the mounting surface is turned into a disc binding. 5) return the suspension mechanism to the floor, release the rigging screw, remove the reinforcing wire rope, remove the bolt, remove the upper support and the boom.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Telescopic Ladder Work Lift Platform
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 500 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords