• Telescopic Boom Lift-GTBZ20 System 1
Telescopic Boom Lift-GTBZ20

Telescopic Boom Lift-GTBZ20

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
500 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Telescopic boom lift--20m:

 

Item

Measurement

Item

Measurement

Dimensions

Productivity

Overall length(stowed)

9.18m

Platform height max.

20.6m

Overall width(stowed)

2.49m

Working height max.

22.6m

Overall height(stowed)

2.8m

Horizontal reach max.

17.3m

Ground clearance

0.31m

Turntable rotation

360 continuous

Wheelbase

2.49m

Platform rotation

160

overall weight

11165kg(2WD)

Platform capacity

250kg

Platform Size (L*W*H)

1.83*0.76*1.1M

Gradeability

30%(2WD)

Platform levelling

Automatic

Turning radius(outside)

4.97m

Tire specification

9.00-20

Turning radius(inside)

1.66m

Tire type

Solid

Turntable tailswing

1.32M

Power

Max. Driving Speed

6.3km/h

Hydraulic tank vol.

170L

Driving Speed (stowed)

0~6.3km/h

Hydraulic system vol.     

270L

Driving Speed (extended)

0~1.1km/h

Fuel tank vol.

125L

Max allowable wind force

12.5m/s

Control voltage

24V DC

Max allowable slope

3��

Engine

Original Cummins

Max noise on normal use

82dB(A)

Drive & steer model

2WD*2WS

Max allowable side force

400N

Q: Calculation of engineering quantity of electric hanging basket
According to the vertical projection area of the wall, the height shall be designed from the outdoor floor to the top of the outer wall, and the length shall be calculated from the outer perimeter of the outer wall
Q: There is a dry stone hanging project on the exterior wall. Hanging basket needs many mobile installation, each installation should be tested?
Hanging basket construction is a dangerous height work. The safety and reliability of equipment shall be tested with a qualification in play, installation, use before the construction plan approved by the relevant departments of the enterprise safety, audit, corporate chief engineer group signed to belong to more than a certain size, according to the provisions of the construction quality of [2009]87#, but also by the group of experts through demonstration
Q: Tianjin building more than meters, not allowed to use hanging basket construction
In fact, the building is not high enough to use a hanging basket, but the basket itself is not allowed to exceed a certain height. Is generally allowed to use to 200m, more than 200m, through expert proof can be used
Q: Basket up and down, what's the matter?
(7) when the basket stop at high altitude work, should be the safety lock lock, need to move, and then relax the safety lock. When the safety lock accumulated after using l000h must be regular inspection and re calibration, to ensure the safety work of electric basket (8) abnormal noise and failure in operation, must immediately stop check, before the fault does not completely rule out, shall not be used.
Q: Construction plan for mounting basket on steel pipe support frame
(3) the front and rear beams are respectively arranged before and after stent insertion within the casing, with the beam to the front and rear beams set, and according to the situation before the selected overhanging beam, the distance between the front and rear supports should be put to the maximum, will be placed on the front seat pillar rod sleeve. The small connecting sleeve is arranged on the inserting rod sleeve of the back support, and is fixed by bolts, and the bracket is assembled and completed.
Q: What is the power of the zlp630 electric basket?
At present, the use of electric basket has gradually become a trend, in the high-rise building construction, installation, maintenance and construction of curtain wall insulation cleaning exterior wall has been widely recognized by higher operation, and can be used for large tanks, bridges and dams and other operations.
Q: How about the sudden suspension of aerial homework basket?
. 6) release the front bracket and remove the counterweight from the rear support. 7) put all the disassembled parts in the prescribed place and prepare them to be transported to the ground. 8) demolition hoist, safety lock and side basket, basket plate bolts to collect good disintegration, remove the. 9) the parts of the platform and the components of the suspension system are centrally placed in the prescribed place and ready for loading and unloading.
Q: How to transplant basket?
There is no soil transplant is not a problem, the problem is that after transplanting soil, must be compacted. Don't leave any space. Water it for the first time.
Q: What is a bridge gondola?
4, using the extended electric basket for bridge maintenance, maintenance and construction operations, the 5 electric basket wells word tower repair and maintenance and construction work, the system adopts double basket structure, convenient construction.
Q: Is it true that free baskets are offered to friends?
Recharge cards or free calls are actually Internet telephony. (you use WeChat's voice over the Internet or video calls, free of charge! Or with non network company calls for free software, NetEase, Alibaba and other large companies have calls for free software, free flow), and do not spend a small unknown software also need to spend their own money, suddenly some software is not, because the money is gone, some give you 100 yuan, you have to recharge use. Yes, they lose a lot of money in a minute.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords