T Beam for Flooring Decking Precast Machine
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 5 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
T Beam for Flooring Decking Precast Machine
1. Structure of T Beam for Flooring Decking Precast Machine:
T Beam for Flooring Decking Precast Machine is our special developed products as results of our engineers research, with which 60%steel material will be saved compared with traditional revolving die method .Efficiency can be improved 3 to 5 times compared with conical die method, these machine are easy for operation and convenient for maintenance, products from these machines are in good quality, smooth appearance and accurate in size.
2. Main Features of T Beam for Flooring Decking Precast Machine:
• One machine can make one slab lower cost, high Wear-resistant, long service life.
• In case of quality problem the company provide free replacement.
• Provide technical support for free.
3. T Beam for Flooring Decking Precast Machine Images:
4. T Beam for Flooring Decking Precast Machine Specification:
Model | Thickness of slab (mm) | Width Of slab(mm) | No of Holes | No of Wires | Diameter of wires (mm) | Eclectic Motor Power (kw) | Vibrator Motor Power (kw) | Max span(m) | Forming type |
ZB 100*130*4 | 100 | 130 | Solid | 5 | 5 | 7.5 | 1.5 | 4.5 | Flat pushing |
Type | Slab thickness | Slab width | Total power | Mould speed |
ZB100-130-4 | 100mm | 130mm | 9kw | 1.1-1.3m/min |
ZB110-130-4 | 110mm | 130mm | 9kw | 1.1-1.3m/min |
ZB140-155-4 | 140mm | 155mm | 9kw | 1.1-1.3m/min |
ZB150-140-4 | 150mm | 140mm | 9kw | 1.1-1.3m/min |
ZB150-160-4 | 150mm | 160mm | 9kw | 1.1-1.3m/min |
Production Process
Rebar tensioning
Raw materials preparing
Molding
5. Packing & Delivery
• Wire cables are used for fastening the machine on the trailer or inside the container.
• Machine covered with plastic film.
• Machines can be packed in tarpaulin or wooden case according to customer’s needs.
6. FAQ:
We have organized several common questions for our clients, may help you sincerely:
• What information we need to confirm with you before send a formal offer?
What kind of slab you want to make, wall panel, roof panel, lintel or something else?
Do you have exact slab size (slab thickness and width)? If not, please tell us the slab span, we will give you suggestion.
• Have you use this kind of machine before?
Our machine is totally different from European machine. Please don’t follow their instructions.
• How long can we receive the product after purchase?
In the purchase of product, within 20 working days we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 35 working days can be served.
- Q: How does operating machinery under water complicate mining procedures?
- Absolute pressure at the surface is 14.7psi. Absolute pressure at 250 feet of see water for example is 126psi. That puts the machinery and people into a very different world that us surface dwellers from the get go. The BP job was at something like 7000 to 8000 feet if I remember correctly. That's about 3352psi. People can only dive to about 1000 feet of sea water. So on the BP job there were no people down there working. Everything we saw was from ROVs. Remotely Operated Vehicles. Doing things with a claw that is controlled by a joystick through a TV screen is very different from doing it with your own hands when you're right there looking at it. Even when you do have divers down there they usually only have 1 to 4 people. That's a limited team. They do not have a big box full of tools down there with them. They have the surface crew send the tools to them as needed. Salt water is not good for any kind of tool. It makes them rust and makes the seals break down. This leads to tool failure and many trips back and forth for replacements and repairs. The surface crew is usually young guys 18 to 25 who are not the most mature or reliable people in the world. Tool maintenance does not always get done properly. Divers are regular people. They are stubborn, arrogant, lazy, dumb and any other thing that you run into with coworkers anywhere. If they feel like sitting down for a break, the boss can't always keep a proper watch on them or come down and yell at them. We just finished a well abandonment job where we did the same thing with plugging a well with concrete just like the BP job and it took us 6 tries. That technique doesn't work too good at shallower depths either. This stuff is still full of bugs buts the pursuit of money keeps things moving beyond what we truly understand.
- Q: Royal Co. acquired new machinery with a list price of $700,000. At the date of Purchase they received a $7,000 cash discount and paid $2,000 of delivery charges. Installation and worker training costs were $46,000 and $14,000 respectively. During installation, worker negligence caused $15,000 damage to other machinery in the factory building. What is the acquisition cost for the machinery?I am unsure what to include, deduct or add in the calculation. Any help would be great!
- Acquisition okorder
- Q: I have a go cart with a 6.5 horsepower general machinery small engine. The engine starts right up first pull but as soon as I press the throttle, the engine dies. The only way to use it is if you start the engine with the throttle being pushed, but if you let it idle for about 10 seconds after that it dies. Whats going on here??? Any help would be greatly appreciated.
- clean carb...idles ok but given gas stalls....when u hit throttle u open letting in more air...not enough gas..
- Q: Machinery was purchased for $51,000 on January 1, 2009. Freight charges amounted to $2,100 and there was a cost of $6,000 for building a foundation and installing the machinery. It is estimated that the machinery will have a $9,000 salvage value at the end of its 5-year useful life. What is the amount of accumulated depreciation at December 31, 2010, if the straight-line method of depreciation is used? $10,020. $8,580. $17,160. $20,040.
- $20,040: (51,000+2,100+6,000-9,000) / 5 = 10,020 per year 2009 - 10,020 2010 - 10,020 Total = $20,040
- Q: What is the best way to develop abs quickly without using any machinery?
- lose all your belly fat and then do abs and leg raises
- Q: whre can i download this book?...Electric Machinery Fundamentals (Power & Energy)By Stephen J. Chapman-4th edi?
- I'm okorder /
- Q: Do engineering technicians get to invent and patent ideas within large companies, or is this typically reserved for the mechanical engineers?
- Mech Engr Technicians are mechanics. They assemble, tear down and help diagnose things gone wrong with machines. They take data etc. but rarely will do much inventive work, still, some inventive opportunity exists for technicians, I've had many work for me and good one's are worth everything they get paid and more. Truth be told though, very few Engineering technicians are getting hired these days. If you want to be an engineer, bite the bullet and do the 6 years of school it takes, you will not regret it. Astrobuf
- Q: electric digram for desel generator wih 105 kva
- Call or write to the manufacturer.
- Q: what is difference between machinery and equipment?
- A turbo-machinery engineer would be a specialty within the rotating equipment engineering category.
Send your message to us
T Beam for Flooring Decking Precast Machine
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 5 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords