Straddle power stacker--CLH20 Series
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
PRODUCT NAME:Straddle power stacker--CLH20 Series | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PRODUCT INTRO | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
●large tonnage and high lift stacker
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Related Products |
- Q:What is the use of a silk pole elevator?
- It can be used in single or combination, which can be controlled by a certain degree of accuracy, which can be driven directly by electric motive or other power. It can also be manually, with the maximum input speed of 1500r/min, the maximum speed is 2.7 / min. There are different structural forms and assembly modes, and the height is customised according to the user's requirements. The change device can be self-locked.
- Q:The characteristic of shear fork platform
- Shear fork lift platform is mainly used in the logistics industry, production lines, lifting, loading and unloading goods to floor between basement, can also be used to lift stage, lifting work station, etc. The product has a stable structure, low failure rate, reliable operation, safe and efficient and easy to maintain.
- Q:Put a large beaker of water on a horizontal platform and put a light glass upside down in the water
- Rise slowly lifts A certain height, because the process is slow cooling can in time, and the environment temperature balance, and can be regarded as constant temperature, the glass is immersed in the water depth increases, the gas pressure increase, to A.
- Q:How does the table in the middle of the tatami mat go up and down
- Opposite position: put the platform and the table board into the central pit of the tatami mat. Drop the lower part of the platform to the bottom, make the table and the tatami mat surface level, and adjust the horizontal position to make the gap between the table and the table evenly.
- Q:The design of graduation is designed for mobile shearing and hydraulic lift
- Has offices in the major cities, buy convenient, jinan Long Hao hydraulic machinery is the main production: elevator, lift platform, lift platform, elevator, cllimbing trolley, hydraulic lift, hydraulic lift platform, hydraulic lifting platform, hydraulic lifts, hydraulic dock leveler, imobile elevator, stationary lift platform, fixed lifts, fixed lifts, stationary dock leveler, mobile lift, lift platform, lift platform, portable lifts, mobile cllimbing trolley, goods elevator, cargo-lifts, hydraulic cargo-lifts, stationary cargo-lifts
- Q:What are the elevating institutions
- Hydraulic actuation is commonly used, so it is called hydraulic platform. In addition to the cargo delivery of different altitudes, it is widely used in the installation and maintenance of high altitude. Elevating mechanism - classification according to the different points of the lifting mechanism: cutting fork type, lifting type, sleeve type, lifting arm type, folding arm type.
- Q:Tomb raider 9 research base elevator to go to go to go to go to the order to pry the gear not to go down to go down to go down the card 3 to break up
- Press the switch and then descend the elevator down to the second floor and then climb to the right hand side of the cargo and pull down the first gear. Walk to the elevator and climb down the stairs to open the door between the second and third floors. Go up to the third floor and turn the elevator to the third floor. And then you go back to the second floor and you go to the third floor and you go to the sandwich and you get the second gear. Go up to the fourth floor and press the elevator up, go back to the third floor and switch to the three or four floors and twist the third gear. Come down to the entrance of the third floor elevator and then go in and use a shotgun to smash the three floors and the four floors. On the fourth floor elevator again back to the fourth floor, between the back to the fourth floor on the elevator by just open the channel on the wall opposite the detour to the fourth floor mezzanine dropped last gear lever.
- Q:What is the size of the hydraulic elevator platform for 2T
- If use the size of the demand is larger, can use fixed double span hydraulic lift, double straddle steady lifting, large carrying capacity, easy operation, widely used in vehicle maintenance, kilns, chemical plant, equipment and other industries use.
- Q:When the hydraulic platform drops, it feels very shaken and unbalanced. Please answer?
- Connected to the solenoid valve is the control valve core, if it is to be repaired. To change oil, you need to lift it up to the top, and then use the safety support frame or stick to support it so that you can do what you want
- Q:How do you remove the horizontal universal elevator milling cutter
- Tie rod and the threaded part of the milling cutter is too short, removing cutter bar back a loose, threaded connections even fewer number of buttons, easily when tapping threads dozen hair, and make the cutter not screw down, or make the damage of tie rod.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Straddle power stacker--CLH20 Series
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords