• Steel Cup Lock Scaffolding System Manufacturer in China CNBM System 1
  • Steel Cup Lock Scaffolding System Manufacturer in China CNBM System 2
  • Steel Cup Lock Scaffolding System Manufacturer in China CNBM System 3
Steel Cup Lock Scaffolding System Manufacturer in China CNBM

Steel Cup Lock Scaffolding System Manufacturer in China CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of Steel Cup Lock Scaffolding System Manufacturer in China 

  • NameCuplock Scaffold System
    SizeMany sizes or as your request
    Main MaterialQ235/345 Steel
    Surface TreatmentHigh Protected Painted, Powder Coating, Electric Gavenized, Hot Dip Gavenized.
    ColorSilver, Orange, Red
    CertificateSGS, EN12810.
    ServiceOEM Service available
    MOQ50T
    PaymentT/T, Western Union
    Delivery Time15-25  days  after  deposite
    Packingin bulk or steel pallet or as your request
    production capability50 tons per day
    Main  MarketAfrica, South America, the Middle East and Asia




  • Steel Cup Lock Scaffolding System Manufacturer in China CNBM

  • Steel Cup Lock Scaffolding System Manufacturer in China CNBM


  • Steel Cup Lock Scaffolding System Manufacturer in China CNBM

Descriptions of Steel Cup Lock Scaffolding System Manufacturer in China  

1.Cuplock scaffolding system is a type of scaffolding characterized by a joining method that uses metal cups to lock beams together. 

2.Like other types of scaffolding, cuplock scaffolding system is a temporary network of frames used to support workers during construction or renovation of a structure, such as a building, where high access points are needed. 

3.The overall stability and ease of assembly of the cuplock scaffolding system makes it the preferred type for projects where a large scaffolding must be constructed quickly and must support a relatively heavy load. 

4.The distinctive cuplock scaffolding joint system consists of three basic components: a top cup, a bottom cup, and ledgers. The cup components are ringlike, each with a hollow center that allows the round verticle bar to pass through it. 

5.We have been catering to wide requirements of our clients in the construction industry by manufacturing a wide range of cuplock scaffolding. Fabricated as per the specifications of our clients these are acclaimed for high durability and wear resistance.


  • The Measures of Steel Cup Lock Scaffolding System Manufacturer in ChinaConstruction 


  • Length(mm)Thickness(mm)Diameter(mm)Weight(kg)
    Scaffolding  Standard30003.24815
    24003.24812
    18003.2489
    12003.2486
    6003.2483
    Scaffolding  Ledger18003.2486.9
    15003.2485.9
    12003.2484.8
    9003.2483.7
    6003.2482.7
  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q: I've had my scaffolding piercing for about a week now and when cleaning i've just dabbed the hydrogen peroxide and salt water around my ear. However i read that i should be rotating it when cleaning it. Should i rotate it after only a week?
Do what the piercer told you to do. If they didn't say and you are concerned, ring them and ask. Personally I would say don't; the fluid that the piercing naturally leaks while healing can cake on the bar and dry into tiny but alarmingly sharp lumps. If you push these into the piercing accidentally while turning it it will really really hurt! They can also damage the newly forming tissue, delaying healing and possibly creating excess scar tissue. The bar will move naturally with the movements of your body anyway within the constraints of (sorry if you're squeamish but I can't put it any more delicately) any crusting around the bar. Just keep it clean and keep hair and face products away from it and it should be great.
Q: How to calculate the double wall scaffolding
The adjustment coefficient of the bearing capacity of the foundation: KC = 0.400;The average pressure of the bottom of the vertical rod foundation, P = N/A =84.900 kN/m2;Among them, the superstructure to the top surface of the axial force design value: N = 7.641 kN;Basal area (M2):A = 0.090 m2.P=84.900 = fg=200.000 kN/m2. Calculation of bearing capacity of foundation!
Q: Method for inspection of foot hand frame fittings
Should adopt the current national standard "straight welded steel pipe" GBT 13793
Q: Do the external wall decoration (from the top down to do) scaffolding is to wait until after the completion of the indoor and outdoor decoration before the demolition?If the first interior decoration, can make a layer of a layer of it is to remove all the work finished I mean I finished all the interior decoration, wall decoration only, then I do a wall decoration on the demolition of a layer of scaffolding, this site useful no
Two, removal of scaffolding, should meet the following requirements:1, the demolition work must be from top to bottom layer by layer, prohibited from top to bottom operation at the same time;2, even the wall must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the demolition of the scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the step, should be added to strengthen the wall;3, when the scaffolding down to the bottom of a long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4, when the scaffolding to take the sub section, the demolition of the sub elevation, the demolition of the scaffold should not be removed at both ends, should be added to the wall and lateral oblique reinforcement.
Q: Scaffolding installation process, construction preparation
Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
Q: What does my earth science teacher mean when he says to do a powerpoint with Link Scaffolding,how d u do it?
Link Scaffolding = A search found no answer. - Ask teacher to clarify.
Q: Is it easier to build a disc scaffolding system than a bowl buckle scaffold?
It is widely used in bridge engineering, tunnel engineering, workshop, elevated water tower, power plant, oil refinery... Support design and special plant, is also applicable to overpass span scaffolding, storage shelves, chimney, water tower and indoor and outdoor decoration, large concert stage, the background frame, stands, balcony frame, stairs, other party system, stage setting, sports watch station project.
Q: What are the requirements for acceptance of external scaffolding? Want to know before
Hello, this has the following specifications: safety 1, set up a high level scaffolding, the various materials used must meet the quality requirements. 2, the foundation must be firm, before the erection of the calculation, to meet the load requirements, and according to the construction code set up, do drainage measures. 3, scaffolding erection technical requirements shall comply with the relevant provisions of the code
Q: In the calculation of the bearing capacity of the scaffold, what is the axial force produced by the "N g2k" - the standard value of the component?The calculation formula for force rod scaffold N/ psi A+Mw/W = fWhere N=1.2 (Ng1k+Ng2k) +0.85*1.4 Sigma NqkThe specification of N g2k is explained in terms of the axial force generated by the standard values of the component fitting,It is how to understand, specifically refers to what? That is to say, what is the standard value of the component?Please master all trouble, thank you generous with your criticism!
Hello friends, NG2K said the weight of the standard parts of the standard value of the axial forceNG2K (kN) formula: NG2K = NG2+NG3+NG4 = 3.094 kN; NG2 and NG3, respectively, NG4(2) scaffolding deadweight standard value (kN/m2); the bamboo scaffold board, the standard value of 0.30NG2= 0.300 x 7 x 1.500 x (1.050+0.3) /2 = kN = 2.126;
Q: I really want a scaffold piercing and I can pay for it, I get good grades, I do all the chores I have to do, I spoke to them calmly and everything. Yet they still won't let me. My dad said that I will be grounded forever and everything but last time I got grounded, I went to a party the next day so what should I do?
dont do it. when your parents say grounded, you may be let off easy but if is about your body then if you get it your in deep ****. also your parents could see this question and then you would be in even more trouble. please dont get it. also things like that are really hard to hide from parents. if your 18 years or older llegally they cant stop you from doing it. i dont think you should do it.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords