• Steel Coupler Rebar Scaffolding For Sale with High Quality System 1
  • Steel Coupler Rebar Scaffolding For Sale with High Quality System 2
Steel Coupler Rebar Scaffolding For Sale with High Quality

Steel Coupler Rebar Scaffolding For Sale with High Quality

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
8000 pc
Supply Capability:
10000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Steel Coupler Rebar Scaffolding For Sale with High Quality

1.Description of Steel Coupler Rebar Scaffolding For Sale with High Quality:

Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required. 


The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.


The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.

Steel Coupler Rebar Scaffolding For Sale with High Quality

Steel Coupler Rebar Scaffolding For Sale with High Quality

2.Advantages of Steel Coupler Rebar Scaffolding For Sale with High Quality: 

The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.


3.Available sizes of Steel Coupler Rebar Scaffolding For Sale with High Quality:

14mm,16mm,18mm,20mm,22mmm,25mm,28mm,32mm,36mm,40mm


4.Delivery:

Delivery Term: FOB / CFR / CIF available.

Delivery Time: 15 days or less after order confirmed.


5.Why choose us?

Technical Expertise

Experienced Management

Stringent Quality Control

Exemplary Service

On-Time Delivery

Wide Product Range

Competitive Pricing

Huge branch network capable of catering worldwide

Q: How to solve the problem of scaffold pipe repair
In the construction of the bending, torsional irregular steel tube to adjust the straight, mechanical transmission, reasonable structure, high efficiency, safe and reliable
Q: The role of the external scaffolding and the relevant provisions?
There are many kinds of scaffolding, there are many types of scaffolding alone. According to the use, structure, decoration scaffolding scaffolding and protective scaffolding; according to the use of materials, there are bamboo scaffolding, scaffolding, metal scaffolding; according to the structure form, there are several independent bar type, frame type, bridge, hanging, hanging, pick style etc..
Q: The classification of scaffolding and the relevant provisions of the provisions of the installation, please explain professional, thank you
1, the height of the super 24M drop steel scaffolding; 2, attached to the lifting of the scaffolding, including the overall lifting and chip upgrade; the 3, cantilevered scaffolding; the door scaffolding, scaffolding, the scaffolding, scaffolding, the scaffolding; the 5, hanging basket, scaffolding, scaffolding, and so on; 6;
Q: 21M high full scaffold erection scheme
2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall of the whole layer or several layers removed and then removed the scaffolding; demolition should not exceed the height of the 2 step, such as the height difference is greater than the step, should be added to strengthen the wall;3 when the scaffolding removed to the lower part of the last long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4 when the scaffold is divided into sections and sub sections to be removed, the two ends of the scaffold without dismantling should be added with the wall and the transverse reinforcement.
Q: by scaffolding ?
I'm guessing it is a reference to large breasts. But I could be wrong.
Q: what are two burdens for each character? What action does each character indicate that she or he is indeed free from their burdens?
Tell me what you know and I will elaborate. I had to read this book for a class and hated it, but I won't do your homework for you. I will help if you show you read it yourself and put in some effort we can see
Q: What is the meaning of the scaffold when it is set up in the concrete structure of the permanent building
5.2.5 scaffolding engineering A. structural parts (1) structural parts selection and calculation basis
Q: He pushes a can over the scaffold at 15 meters and it takes 3.25 seconds for it to land.I keep doing the problem over and over. the Correct answer is 20.5 m/s, however I keep arriving to the solution of 17 m/s. I solved it by doing Vf^2 = Vi^2 + 2adwhere the initial velocity is zero and the acceleration is -g. I made my coordinate system so that down is negative in which the distance will be negative. This however, did not give me the correct answer. Am I right or is the book right?
The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt? 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s?)(3.25 s)? vo = +20.5 m/s
Q: What is the service life of the mobile scaffolding accessories?
In actual use, there are a lot of mobile scaffolding accessories because of deformation, and other reasons, resulting in a lot of scaffolding accessories are not easy to use, or even eliminated. Therefore, the overall life of about 5 years. Therefore, the use of mobile scaffolding accessories should pay attention to the maintenance, so that its useful life to get more, the value of the use of more perfect.
Q: I got my scaffolding approximately about 7 weeks ago maybe just a lil over, I want to know when is a good time to change the bar/take it out, I am keeping up with cleaning it 2 to 3 times a day with the saline solution, even though, it only requires to be cleaned 1-2 times a day to be fair though
Scaffold piercings, being two cartilage piercings connected by a single bar, take six months for initial healing and twelve months for a fully healed tunnel of flesh to be formed. Don't change it yet, I assure you, you will regret it. Just be patient, keep on cleaning, cleaning, salt-soaking.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords