1.Description of Steel Coupler Rebar Plastic Scaffolding Plettac Scaffolding CNBM:
Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required.
The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.
The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.
2.Advantages of Steel Coupler Rebar Plastic Scaffolding Plettac Scaffolding CNBM:
The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.
3.Available sizes of Steel Coupler Rebar Plastic Scaffolding Plettac Scaffolding CNBM:
14mm,16mm,18mm,20mm,22mmm,25mm,28mm,32mm,36mm,40mm
4.Delivery:
Delivery Term: FOB / CFR / CIF available.
Delivery Time: 15 days or less after order confirmed.
5.Why choose us?
Technical Expertise
Experienced Management
Stringent Quality Control
Exemplary Service
On-Time Delivery
Wide Product Range
Competitive Pricing
Huge branch network capable of catering worldwide
- Q:I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
- 10, the scaffolding removed, should first check to connect with the building, and will remain on the scaffold material, clean, and other debris from the top down, according to the first after the demolition, demolition of first order after installation, demolition materials should be passed down or lifted onto the ground, step one clear. Not allowed to use the method of step down, it is strictly prohibited to throw down or push (pull) down the demolition method.11, take off scaffolding, should be set up warning area, and sent a special alert. In case of more than six winds and bad weather, the scaffolding should be stopped.
- Q:hi, i already have my cartlidge pierced on my right ear and thinking about getting a scaffold piercing on my left ear. will a scaffold piercing hurt more than my cartlidge piercing,,less,,or about the same???thanks answers apprecietedhope =] xx
- Several people have told me it hurts about the same. I do not have one, sorry couldn't be more help than that.
- Q:Do the external wall decoration (from the top down to do) scaffolding is to wait until after the completion of the indoor and outdoor decoration before the demolition?If the first interior decoration, can make a layer of a layer of it is to remove all the work finished I mean I finished all the interior decoration, wall decoration only, then I do a wall decoration on the demolition of a layer of scaffolding, this site useful no
- The relevant provisions of the demolition of the external wall scaffold:First, the removal of scaffolding before the accurate preparation work should meet the following requirements:1, should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system, etc. are in line with the requirements of the structure;2, should be based on the results of the inspection to improve the construction organization design of the demolition order and measures, approved by the competent authorities before the implementation;3, should remove the scaffolding on the debris and ground obstacles.
- Q:opinions on scaffolding piercing and how to hide it from school :)?
- While they're healing, they need to stay in so there's no way of hiding it. Wait until the beginning of the summer and get it done then
- Q:Okay, quick question. I dropped into a couple of piercing studios yesterday to inquire about getting a scaffold done. Both places informed me that it's not a good idea to have it pierced with a bar straight off, as the pressure from the jewellery combined with the swelling when first pierced can seriously slow down the healing rate. Is this true? The second place said they will pierce both holes with rings, and these can be changed to a bar after around 6 to 8 weeks.Is this the best option? Thanks for any replies.
- Scaffold Piercing Jewellery
- Q:How many time was Hester Prynne on the scaffold? why was she on it each time? What about the time when pearl and dimmesdale was on it with her? HELP!!!
- She was only on it once officially but there are several appearances in the book.
- Q:three examples of scaffolding, thanks
- Google these 1) Independent scaffold 2) Putlog scaffold 3) Birdcage scaffold
- Q:What are the common rules for calculating the amount of scaffolding works
- The calculation of masonry construction height within 1.35 ~ 3.6m according to the calculation in the scaffold; scaffold height above 3.6m, the independent brick columns are less than 3.6m in height according to the circumference of the core column is built by scaffolding in height according to the calculation; at an altitude of 3.6m and above at the circumference of the core column is built by 3.6m and calculated by single row height scaffolding.
- Q:Cantilever beam type scaffolding can not exceed the maximum number of not married
- The surface of the board and the bottom of the board should be treated with additional reinforcement.Scaffolding (scaffold) refers to the construction site for the workers to operate and solve the vertical and horizontal transport and erection of various stents. The general term of the construction industry, refers to the construction site used in the external walls, interior decoration or high level can not be directly construction. Mainly in order to work or work on the construction of the perimeter of the safety net enclosure and high altitude installation components, etc., is put on the shelf, scaffolding materials are usually made of bamboo, wood, steel or synthetic materials, etc..
- Q:Bowl buckle type steel pipe scaffolding should set up a few people
- What are the form and structure of bowl buckle scaffold?Composition formA bowl type steel tube scaffold is a multifunctional scaffold in our country with reference to foreign experience developed, its member nodes connected with bowl, because the bowl is fixed on the steel pipe, all components of the axial connection, good mechanical properties, which is reliable, consisting of the scaffold with good integrity, there is no fastener lost problem.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Steel Coupler Rebar Plastic Scaffolding Plettac Scaffolding CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 5000 pc
- Supply Capability:
- 10000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords