Stainless Steel Marble Bracket and Accessories
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 5000 Pieces m.t.
- Supply Capability:
- 1000000 Pieces per Month m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Type: Stainless steel marble bracket
Place of Origin: Jiangsu China (Mainland)
Model Number: ST-G02
Introduction:
The non-rust of the stainless steel means it can have certain chemical stability around the corrosion mediums of air, water, acid, alkali, salt or others. But it does not mean the stainless steel will never rust. Whether the stainless steel will rust or not is influenced by the molecular structures, the processing technic, and the operating environment and so on. To prevent the stainless steel from rusting extremely, please pay attention to the followings:
1. Stone fixation, stainless steel/Inox
2. Z Restraint/Support bracket/anchor
3. Brackets can be adjustable in 3 directions
1 |
Product Name |
Stainless steel marble bracket/accessories |
2 |
Brand |
|
3 |
Model |
ST-G02 |
4 |
Size |
According to customers' requirements |
5 |
Material |
201, 302, 304, 304L, 316, 316L, according to customers' requirements |
6 |
Standard |
GB, JIS, AISI, BS, DIN |
8 |
Finishing |
Cold draw hairline and Fluorocarbon coating(all kinds of colors) |
9 |
Usage |
stainless steel angle to fix marble stone one the wall |
10 |
Package |
Bubble bag + Inner box + Carton |
11 |
MOQ |
5000 pieces |
12 |
Delivery time |
15-30 days after receiving the full payment |
13 |
Price |
0-100 USD/piece |
14 |
Service | 1.Product design drawings (CAD) |
2.Professional engineer advices | ||
3.Installation guiding | ||
4.Product Warranty is offered | ||
5.OEM, ODM , Customer design | ||
15 |
Payment |
L/C, T/T |
16 |
Ability |
1000,000 pieces/month |
Suggestion:
1. Recommended projection size between 45 mm to 135 mm and loads up to 800N.
2. In horizontal joint installation slabs are pinned on the bottom and upper sides. Anchors act as load bearing carrying half the weight of the slabs above. Anchors also act as restraint holding the slabs below and restraining against wind suction and pressure.
3. In vertical joints installation slabs are pinned at the left and right sides. Anchors on the bottom are load-bearing anchors carrying the whole weight of the slab. Half the slab is on the left and half the slab is on the right. Anchors on the top are restraint anchors holding the slabs and restraining against wind suction and pressure.
4. Three - dimensional adjustability allows quick and easy installation.
After many years, we can:
Own design - meet the project needs;
Own production - ensure that the project in a timely manner;
Rigorous testing - ensure good quality;
Dedication to service - ensure customer's satisfaction;
The whole management - ensure Honor.
- Q:Glass curtain wall glass installation process requirements which out
- The last step is the most critical step is to glue. Before the application of "xylene" or industrial ethanol and clean towels to wipe the stainless steel and steel tiles to fight the site, in the need to glue part of the paste protective tape, pay attention to adhesive tape and glue to be straight. Split the bottom of the stainless steel and the gap with the steel slot with a foam tape to tighten, to ensure straight, and set the net height of 8mm-12mm of the adhesive thickness. When the glue is full, the operation sequence is generally: first hit the horizontal seam after playing vertical seam; vertical glue should be from top to bottom, glue filled, should check whether there are bubbles, empty, broken, Mixed, if it should be dealt with in a timely manner. Every other day when the plastic joints, plastic joints should be cleaned up a good plastic head, remove the glue before the glue, to ensure that the two glue the connection closely. Stainless steel glue should be quickly modified after the adhesive tape will be torn on stainless steel, stainless steel plastic curing, should clean the inside and outside the stainless steel, do a good job protection signs. If the use of laminated stainless steel, the outer film thickness should not be less than 10mm, the thickness of the film should not be less than 8mm.
- Q:How to measure the size of the glass on the glass structure of the steel structure
- The splicing jaws serve as an important accessory to the glass curtain wall, which plays an important role in the connection of the glass curtain wall. The mechanical properties are particularly important by passing the load to the steel structure or other body structure through the splice joint. Of the installation staff, the installation of the curtain wall when you need to master a lot of technical and knowledge points.
- Q:304 stainless steel splicing claws the price is how much, what quality and cheap manufacturers
- 304 stainless steel splicing claw is not expensive, if the amount of large manufacturers suggested that the cooperation, 304 material cost-effective, widely used.
- Q:The installation method of the splicing jaws
- Steel beams and glass are ready to ensure that the location is not wrong, as well as glass holes, adapter and steel beam welding no problem. Put the claws on the transfer, engage in tight. Put the splice on the glass, engage in tight, do not forget the middle of the gasket. Then, the glass is mounted, the splice is connected with the splicing jaws, but do not twist too tightly, and then adjust the position and adjust the error. Finally, tighten, check the next to ensure safety. Ordinary is so loaded, of course, there are different styles, installation methods are different, but not difficult.
- Q:What are the specifications of the stainless steel jaws?
- A very common one. Use the same with the 200 splicing claws. Including glass area between 2.0m2 and 2.3m2, the thickness of 6 +6 or 8 +8 can be used. Thickness of 8 +8 is recommended to use 250 split claws, Jie Chen hardware.
- Q:What is the size of the glass I use
- Light steel glass canopy focus on just the material for the light steel, tempered glass rain shed focus on the glass material for the tempered glass, are glass canopy
- Q:Diamond knife can pierce twelve PCT tempered glass?
- Diamond knife is not the glass pierced, but the glass a long mouth, and then stress the broken line above the broken, it is easy to board off. It is very difficult to cut the twelve-piece tempered glass directly.
- Q:Glass curtain wall claw should be how to calculate the size
- In general, our factory will be based on the customer's glass area and glass thickness, to advise customers to choose what specifications of the split jaws, common splicing claw specifications are: 150.160.200.220.250 and so on. Be sure to choose the appropriate type and specification of the splicing jaws so that both price and performance are guaranteed
- Q:Do you want to glue when you install a splice?
- Are mechanically connected by bolts.
- Q:The difference between the skeleton curtain wall and the whole glass curtain wall
- With the skeleton of the curtain wall is a metal column beam as a support structure, because there is a metal skeleton, is bound to be very transparent. Full glass curtain wall as the name suggests, is the force support and the panel is full of glass, so the effect is more transparent than the skeleton curtain wall.
1. Manufacturer Overview |
|
---|---|
Location | Zhejiang, China |
Year Established | 2010 |
Annual Output Value | US$1 Million - US$2.5 Million |
Main Markets | North America South America Eastern Europe Southeast Asia Africa Oceania Mid East Eastern Asia Western Europe South Asia Domestic Market |
Company Certifications | ISO 9001:2000 ISO 9001:2008 CELAB |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | NINGBO,SHANGHAI |
Export Percentage | 51% - 60% |
No.of Employees in Trade Department | 3-5 People |
Language Spoken: | English, Chinese |
b)Factory Information | |
Factory Size: | 3,000-5,000 square meters |
No. of Production Lines | 8 |
Contract Manufacturing | OEM Service Offered Design Service Offered |
Product Price Range | Low and/or Average |
Send your message to us
Stainless Steel Marble Bracket and Accessories
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 5000 Pieces m.t.
- Supply Capability:
- 1000000 Pieces per Month m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches