Semi-electric Aerial Reclaimer--DYT2-2.7
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Model | DYT2-2.7 | DYT2-3.3 | |
Rated capacity | kg | 200 | |
Max working height | mm | 4700 | 5300 |
Max platform height | mm | 2700 | 3300 |
Overall length | mm | 1300 | |
Overall width | mm | 760 | 840 |
Overall height | mm | 1700 | 1990 |
Platform size | mm | 900X600 | |
Ground clearance | mm | 30 | |
Wheelbase | mm | 770 | |
Lift motor | 12VDC/1.5kw | ||
Raising/Falling speed | sec | 19/17 | 22/25 |
Battery | 12V/120Ah | ||
Charger | 12A/15A | ||
Rear wheel | mm | Ф150×40 | |
Front wheel | in | 5 | |
Overall weight | kg | 268 | 313 |
-Emergency stop button
-Charge lamp
-Double brakers
-Voltage display
-Strut bar for safe overhaul
-Emergency descending button
-Overload limit
- Q:How is the small electric shearing fork lift designed
- classification The shear fork platform is divided into: movable, fixed and tractive. Mobile platform elevating power is manual or electric, the product structure is firm, the mobile is flexible, the elevation is stable, the operation is convenient, carrying weight is large and so on. use Pull-type elevating platform adopts foreign power do drawing, using three-phase power supply or diesel engine for power, move fast and convenient, suitable for long distance operation, it is mainly used in oil, electricity, urban construction, post and telecommunications industries field aerial work.
- Q:The structure of the universal elevator milling machine
- The transverse table is located on the horizontal guide of the elevating platform, and the vertical workbench can be brought forward together. The rotating table can turn the vertical table from the Angle (positive and negative to zero ~ 45o) in the horizontal plane, so that the spiral groove can be milling. Horizontal milling machines with rotary tables are called horizontal universal milling machines. The lifting platform can move the whole table up and down the vertical guide of the bed, adjusting the distance of the workpiece and the milling cutter. The base base is used to support the bed and the elevating table, with the inside of the cutting fluid.
- Q:What should the chain's main elevator be aware of when installing the chain
- Based on many years of production installation experience, the following items should be noted in the installation: The rail type carries mesa thickness problem. According to the actual demand, adopt the most appropriate bearing mesa, some manufacturers in order to save costs by steel plate thickness is not appropriate, causing customers to use after a period of time, serious deformation mesa.
- Q:What happens when the platform comes up and the power goes out.
- Many platforms have an emergency drop.I hope my answer will help you.
- Q:How to maintain the platform?
- Remove the hydraulic oil and remove the oil strainer, remove the oil strainer, clean it up, and then put it back in the tank and connect the pipe. (put on new oil and don't use the old oil. Otherwise, the moving parts of the hydraulic lift system will accelerate the wear and tear.) Remove and disconnect the lift valve, blow the plunger down with compressed air, then load and resettle. Check all hydraulic pipes and connectors. The pipe should not be broken, the joints should not be loose, and all the joints must be tightened.
- Q:The purpose of the rail elevator
- The product structure is strong, the load is large, the lift is stable, the installation maintenance is simple and convenient, is the economical and practical low floor space to replace the elevator's ideal cargo transport equipment. According to the installation environment and use requirements of lifting platform, choose different optional configuration, can achieve better effect, the use of this product is mainly used in chemical, high temperature and high pressure, power plant, the nuclear industry base, such as explosive explosion protection enterprise.
- Q:There is no elevator on the 7th floor of the home to install a lift or lift
- Comrade as an ordinary elevator work I tell you, the guerrillas installation of lifts is commonly used or is directly discarded ladder refurbished, safety exist great hidden trouble. If you see your family's life as a game, you can take a baidu elevator and install team.
- Q:What about the heat treatment of the lifting platform?
- The silk rods are generally used for the processing of the adjustment, and the semi-finishing process is a stabilizing stress treatment.
- Q:Is the music console working? Want to start a, afraid to buy expensive again.
- The music and song platform is a one-stop alternate office product, which means you can stand for a while.
- Q:What happened to the rise and fall
- The motor is missing (the motor is not moving, and there is a buzzing sound) to check the circuit breaker and the electrical wiring. The drop valve is open when the drop button is released, and the voltage meter is used to check if the valve has electricity. If there is no electricity, check the line and troubleshoot it. If there is electricity, the valve itself is out of fault. The slide valve must be clean and flexible. The overflow valve is adjusted to the relief valve. Under 100% rated load to adjust the oil level is too low, the oil pump hydraulic oil filled up at a empty absorption, oil absorption filter clogging, clean filter, oil leakage, check the suction tubing and connectors; Tighten the joint.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Semi-electric Aerial Reclaimer--DYT2-2.7
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches