Self-propelled Aluminium Work Platform-FAWP
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Model | Unit | FAWP7.5-2000 | FAWP9-2000 |
Max.Platform Height | mm | 7500 | 9000 |
Max.Machine Height | mm | 9000 | 10500 |
Min. Platform Height | mm | 530 | |
Ground clearance | mm | 70 | |
Lift Rated Capacity | kg | 200 | 150 |
Platform size | mm | 1000x700x1150 | |
Max.Drive Speed(Platform stowed) | km/h | 3~4 | |
Max.Drive Speed(Platform elevated) | km/h | 0.6~1 | |
Min. Turning radius | mm | 1600 | |
Max. Climbing Capacity | % | 10-15 | |
Caster Size | in | 6 | |
Driving Wheel Size | mm | Φ230x80 | |
Driver Motor | V/kw | 2x24/0.4 | |
Lifting Motor | V/kw | 24/2.2 | |
Aneroid Battery | V/Ah | 2x12/150 | |
Charger | V/A | 24/15 | |
Pothole Protection System | / | mechanical control | |
Overall Length | mm | 1500 | |
Overall Width | mm | 1000 | |
Overall Height | mm | 1960 | |
N.W | kg | 1100 | 1250 |
- Q: Where is the mobile lift platform?
- Jinan stanozolol machinery co., LTD is mainly engaged in elevator, lift platform, hydraulic lift platform is one of the specialized fixed-point production factory, the company produced well-equipped, detection means complete. The technical force is strong, the product performance and technical indexes meet the national industry standard.
- Q: There is no elevator on the 7th floor of the home to install a lift or lift
- Comrade as an ordinary elevator work I tell you, the guerrillas installation of lifts is commonly used or is directly discarded ladder refurbished, safety exist great hidden trouble. If you see your family's life as a game, you can take a baidu elevator and install team.
- Q: Is the elevator moving faster or slower?
- Lifting platform should comply with the law of the People's Republic of China machinery industry standard JB/T9229.1, JB/T9229.2, JB/T9229.3, lifting platform in general can be divided into fixed lifting platform, mobile lifting platform, self-propelled lift platform, lift car. Working environment temperature 15 + 40 ℃, general requirements workbench rising velocity should be 6-9 m/min, falling speed should be not more than 6 m/min. Lifting platform type different calculation slightly different;
- Q: What certificate is required to operate hydraulic platform
- Need special equipment to use the license, do this card is very expensive, seem to want 500 ~ 10000. Where did you buy it, because the house can do it for you? If the product does not meet technical review do not water,,,, I know there is a producers can do STH for sb, HuaNanJun industry machinery equipment co., LTD, special equipment to check more strictly, now,
- Q: How is the lifting handle of the universal knee-milling machine very tight
- Maybe it's too tight.I hope my answer will help you.
- Q: How do I design this hydraulic lift?
- I have to write a hydraulic part that is 40 or 50 pages, you can find the estimate here is a little difficult, still go to the library search.
- Q: Operation and attention of electric elevating platform car?
- ?Gives you an explanation of the items of electric elevator: In order to ensure the use of safety and keep the machine in good working condition, the appearance performance check should be performed first. The inspection is as follows: Using the operating: A, the power cord is in good condition; B, the buttons are valid; C, oil pipelines, etc. D, the intersections of the intersections of the arm frame are fastened.
- Q: How to maintain the platform?
- Remove the hydraulic oil and remove the oil strainer, remove the oil strainer, clean it up, and then put it back in the tank and connect the pipe. (put on new oil and don't use the old oil. Otherwise, the moving parts of the hydraulic lift system will accelerate the wear and tear.) Remove and disconnect the lift valve, blow the plunger down with compressed air, then load and resettle. Check all hydraulic pipes and connectors. The pipe should not be broken, the joints should not be loose, and all the joints must be tightened.
- Q: The purpose of the rail elevator
- The product structure is strong, the load is large, the lift is stable, the installation maintenance is simple and convenient, is the economical and practical low floor space to replace the elevator's ideal cargo transport equipment. According to the installation environment and use requirements of lifting platform, choose different optional configuration, can achieve better effect, the use of this product is mainly used in chemical, high temperature and high pressure, power plant, the nuclear industry base, such as explosive explosion protection enterprise.
- Q: What is the difference between elevator and elevator platform and high-altitude platform
- The elevator will use the motor to reverse the deceleration and pull the cable to lift the basket. The platform, like the high-altitude operating platform, USES hydraulic oil to pressurize or unload the platform. High altitude (pinyin: gao kong zuo ye) refers to the work performed at a certain location on a high level. National standard GB 3608-2008 "high job grading" regulation: "where in the fall for more than 2 m height datum (2 m) to operate the heights of the likely to fall, are called high homework." According to this rule, the scope of the construction industry is quite extensive. When working in a building, operate on a shelf above 2m.
Send your message to us
Self-propelled Aluminium Work Platform-FAWP
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches