Scaffolding Pressed Double Coupler
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | Type: | ||||
Scaffolding Part Type: | zink plated: |
Packaging & Delivery
Packaging Detail: | bags and pallet |
Delivery Detail: | 20-40days after order confirmed |
Specifications
1. BS1139 scaffold pressed double coupler
2. swivel/fixed type
3. Size: 48.3*48.3mm
4. Thickness: 4.5mm-5mm
Our factory has more than 15 years experience on scaffolding coupler production. We have several kinds of scaffolding coupler, includes Japanese type, Korean type, British type, and so on.Our products have entered such countries and regions as Japan, Korea, Southeast Asia, South Asia, the Middle East and Western Europe. Our company can design and develop all kinds of top-grade coupler products according to the foreign customers' demands.
1. Size of our coupler: 42.7mm~76.2mm.
2. Thickness: 2.5mm~5mm
3. Weight : 580g~1050g
4. Type: include fixed and swivel type
5. Finish: Zinc electroplate, hot dipped
6. All moulds are made by ourselves, we can design products according to your order.
Our BS coupler has passed BS1139 test, the data as list
Test Clause | Test Item | Test Requirment (Swivel coupler,Class A) | Test Result | Verdit |
7.2.1 | Slipping force | Δ1≤7mm,Fs,5%≥7.0kN and 1mm≤Δ2≤2mm, Fs,5%≥10.0kN | Δ1=7mm,Fs,5%=7.7kN; F=20.00kn, Δ2<1mm | pass |
7.2.2 | Failure force | Ff,5%/yR2≥14.0kN | Ff,5%/yR2=30.2kn | pass |
7.5 | Indentation | F=4.7KN, Δ10≤1.5mm | F=4.7KN, Δ10<1.5mm | pass |
- Q: I want to know the classification of scaffolding in the building
- Steel pipe scaffold. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold.
- Q: what are the scaffolding building on I-44 between milemarker 282 and 283 east bound on the north side of the h
- Are you talking about where the trains are? The cylander shaped buildings? They are oil/fuel tanks... they have a big balloon like thing with a weight on top that as it fills will fill out inside the scaffolding. I have not seen them filled in years though.
- Q: Which kind of scaffolding is the most convenient and time-saving?
- 3, low cost (can speed up the construction schedule, shorten the construction period), large spatial scaffolding in the same condition, the new building quick dismantling scaffold material ratio of bowl type multifunctional scaffold, the same specifications of single member weight than the bowl type multifunctional scaffolding light.
- Q: What is rolling scaffolding?
- Scaffold (pipe staging) that has wheels in the legs. Any metal scaffolding that you've seen can be fitted with wheels to make it mobile.
- Q: Any advise on nerves? I have 11 piercings but I'm still terrified of needles! Any tips on keeping my cool?
- You should keep your breathing calm so you don't freak out, haha. If you're very terrified of needles, have one of your friends hold your hand while doing it and talk to them while doing this to keep your mind off of the piercing. It should be done very quickly though, so don't work yourself up too much :)
- Q: Scaffold removal should comply with those requirements......
- Demolition safety requirementsThe removal order should be 1 layers from the top down, at the same time no homework.2 remove the frame rods and connectors, springboard and other materials, should be used in rolling, prohibited throw down. The foot lever and remove the plate have been demolished, should be disposable.3 all the pieces of the wall should be removed from the scaffold layer by layer, it is strictly forbidden to take the whole or a few layers of the demolition of the wall and then dismantle the scaffolding; the demolition of the height difference should not be greater than two steps, such as the height difference is greater than the two step should be added to strengthen the wall.4 when the scaffolding removed to the lower part of the last long steel pipe height, according to the needs of the site in the appropriate position to take temporary support reinforcement, after the demolition of the wall.
- Q: In the calculation of the bearing capacity of the scaffold, what is the axial force produced by the "N g2k" - the standard value of the component?The calculation formula for force rod scaffold N/ psi A+Mw/W = fWhere N=1.2 (Ng1k+Ng2k) +0.85*1.4 Sigma NqkThe specification of N g2k is explained in terms of the axial force generated by the standard values of the component fitting,It is how to understand, specifically refers to what? That is to say, what is the standard value of the component?Please master all trouble, thank you generous with your criticism!
- (3) the railings and retaining scaffold deadweight standard value (kN/m); the railings, bamboo amphipodsshouban baffle, the standard value of 0.15NG3 = 0.150 x 7 x 1.500/2 = 0.788 kN;(4) the load of the hanging safety facilities, including safety net (kN/m2); 0.005NG4 = 0.005 x 1.500 x 24 = 0.180 kN;
- Q: Okay, quick question. I dropped into a couple of piercing studios yesterday to inquire about getting a scaffold done. Both places informed me that it's not a good idea to have it pierced with a bar straight off, as the pressure from the jewellery combined with the swelling when first pierced can seriously slow down the healing rate. Is this true? The second place said they will pierce both holes with rings, and these can be changed to a bar after around 6 to 8 weeks.Is this the best option? Thanks for any replies.
- yeah that is a better idea. it prevents the bar from getting ripped out, rejecting, and generally makes it less likely to get caught up in your hair while it's still sore.
- Q: Was thinking of getting one. How much do they cost?
- Only a professional piercer can decide if your ear can handle and industrial piercing. Consultations are free and I highly recommend booking one before you get the piercing. Mine was $70, but my regular piercer does them for $50. It just depends on what shop you go to.
- Q: hi, ive had my scaffolding for a little over a month now, and one of the holes has started going really weird. on the top, its swollen and sore on one side, and on the bottom, its the same but on the opposite side. not sure if its infected ir being rejected by ear, which ive heard can happen. i would like to keep it in if possible,as i love it. any help welcomed :) thanks xx
- Normally if there is an infection it is very very sore, red, warm to the touch, and secretes yellow or green pus. It sounds like you might also be possibly forming a keloid, but most likely it is just irritated. Continue with your sea salt soaks (hopefully thats what your doing) and go down to your piercer and have them check it out if you get too worried about it.
Send your message to us
Scaffolding Pressed Double Coupler
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords