• Scaffolding Formwork Accessories Butterfly Nut System 1
  • Scaffolding Formwork Accessories Butterfly Nut System 2
  • Scaffolding Formwork Accessories Butterfly Nut System 3
Scaffolding Formwork Accessories Butterfly Nut

Scaffolding Formwork Accessories Butterfly Nut

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

uick Details

Place of Origin:
Hebei China (Mainland)


Model Number:
GT-BOLT
Standard:
GB,GB, DIN, ISO, ANSI, ASTM, JIS, etc
Name:
GI Butterfly Bolt and Nut
Size:
M4-M24
Length:
6mm-60mm
Grade:
4.8, 6.8, 8.8, 10.9, 12.9
Material:
Carbon steel,stainless steel, alloy steel,etc
Finish:
Plain, black, zinc-plated, HDG, dacromet,etc
Package:
Bag, carton, then on pallet, or according to customers' requirement
Usage:
Construction, machinery, vehicle, ship, bridge, railway, tunnel, etc
Free Sample:
Available

Packaging & Delivery

Packaging Detail:Bulk in carton, then on pallet, or according to customers' requirement
Delivery Detail:Within 15 days after confirming the deposit

Specifications

GI Butterfly Bolt and Nut
1.Size:M4-M24
2.Length: 6mm-60mm
3.Material:carbon steel, ss, etc
4.Finish: plain, zinc, black

Butterfly Bolt

NameGI Butterfly Bolt and Nut
Place of OriginYongnian, Hebei, China
SizeM4-M24 or non-standard as request&design
Length6mm-60mm or non-standard as request&design
FinishPlain, black oxide, zinc plated, HDG, passivated, YZP, dacromet, etc
Material

Carbon steel:  Q235A,  Q345B

Stainless steel:  201 304, 321, 304L, 316, 316L

Alloy Steel:SCM435

Grade4.8, 6.8, 8.8, 10.9, 12.9
StandardGB, DIN, ISO, ANSI/ASTM, B7, BS, BSW, JIS etc
Non-standardsOEM is available, according to drawing or samples
SamplesSamples are free.
Package

Bulk in master cartons, then on pallets, or according to customers' requirement

PaymentL/C or T/T (30% in advance and 70% against the copy of BL)
DeliveryWithin 15 days after confirming the deposit


Q: What are the chances of cracking the tile? What can I do to avoid cracking the tile?This will be 3 levels of scaffolding on 6 inch wheels.
unless you are majorly manhandling the scaffolding, such as slamming it around and jerking it into place, etc, you won't crack the tiles (this is being said with the hopes that the flooring was installed correctly.) i would throw a layer or two of bedsheets or a good heavy drop cloth over the tiled floor just to protect the tile from being chipped or scratched. be careful going up so high. good luck!
Q: If you have two workers say standing on a scaffolding, their are downward forces from the weight of the workers along with the weight of the scaffold, and upward forces from tension suspending the scaffolding in place. The opposite forces add to zero and thus the scaffolding remains at rest.My question has to do with what would occur if more/less workers were on the scaffolding. It appears to me that the scaffolding would always remain at rest. Would there always be a ΣF=0 regardless of the amount of workers? As the decreases in weight from removing a worker would also cause the tension force to be weaker? And vice versa if there were more workers?I
You are correct so long as the scaffolding is not allowed to move. I.e. the cables suspending it are locked and not unwinding from their spools as more workers get on. More weight added would necessarily increase the tension in this type of case. However, if, when another worker got on and the tension could not increase for what ever reason, a downward acceleration would take place that is proportional to the worker's weight. Hope that clears things up.
Q: I am currently taking early childhood care education as my college major. I am learning about ZPD (Zone of Proximal Development), and scaffolding the the development in early childhood.How would you explain, and define scaffolding
Maybe this will help: scaffolding is the support provided by adults working with a child to help promote and extend development of knowledge and skills. It can mean asking appropriate questions to help extend a child's thought process, or providing suitable activities to help a child learn through hands-on activities. Look it up in your textbook and read the definition and apply it to my explanation above for a deeper understanding, and don't be afraid to ask your instructor questions like this! That's what s/he is there for!
Q: How to maintain the scaffold after use
Tool type scaffolding (such as door frame, bridge frame, hanging basket, receiving table) in the removal of the need to stop the maintenance and timely maintenance, and supporting storage.
Q: For indoor use of mobile scaffolding safety construction plan! Four support points with four pulleys with brake!The construction scheme of scaffolding safety belt for indoor high Jiqiu braking pulley, for about 12 meters of buildings, indoor emergency please heroes!
Wall point setWhen the height is not less than 6.0m, you must set the uniform distribution of wall, its setting should meet the following requirements:Door type steel pipe scaffold: when height is less than or equal to 20m, less than 50m2 of a wall, and even the vertical spacing wall point should be less than or equal to 6m; when the frame of high >20m, not less than 30 M2 a point, and even the vertical spacing wall point should be less than 4m.The other floor (or bottom bracket) scaffolding frame: when high than 20m, a point of not less than 40m2, and even the vertical spacing wall point should be less than or equal to 6m; when the high frame >20m, a point of not less than 30m2, and even the vertical spacing wall point should be less than 4m.The free height of the upper wall of the scaffold is not more than 6m.
Q: Is it easier to build a disc scaffolding system than a bowl buckle scaffold?
Disc scaffolding systemIs a new type of scaffolding, the product was introduced in Europe in the last century in 80s, is the upgrading of products after the bowl buckle scaffold. Also called chrysanthemum disc scaffolding, scaffold system, disc scaffolding system, buckle disc scaffolding, layher frame (layer frame, Lei Ya frame, because the basic principle of the scaffold is by the German LAYHER (Lei Ya)'s invention, the industry has been called the "thunder sub frame"
Q: Can anyone give a very brief description on all three scaffold scenes in The Scarlet Letter?
oh dang u have to read that story too ! man i had to read it and watch the movie ! so boring. What grade are u in ?
Q: Right! I've heard from so many different people about this. Some say that you should never twist an industrial because it can damage the delicate newly healing skin cells. Others say that you must twist it to prevent the jewelry from healing attached to the skin and to be able to clean it properly.There really doesn't seem to be a definitive answer!My piercer has said not to twist it, so I haven't been, and I'm happy that the piercing is clean enough, etc. However I'm interested in whether any of you out there have found that not twisting it can damage it more than doing so.Thanks
i twisted mine alot and the cartlidge inbetween has ripped and it hurts unbelievably loads, so i wouldnt twist it
Q: why scaffold need for inspected within the preceding 7 days and after adverse weather condition?
It is a work safety issue. Past experience has shown that scaffolding sometimes gets modified by unqualified people (or weather) resulting in injury or death.
Q: what do you think?pain wise? i know it's going to hurt as it's a peircing (duh) but will it hurt especially as it's two thick pieces of cartilage?
It's not going to hurt 'especially' don't worry. :) xoxox

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords