Road Roller Buy D812H Road Roller at Okorder
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 300 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Name: D812H Road Roller
Parameter:
Type | Unit | Specifications |
Operating Weight | kg | 12300 |
Static Linear Load | N/cm | 297/297 |
Speed Range | ||
I Speed | km/h | 6 |
II Speed | km/h | 12 |
Theoretical Gradeability | % | 42 |
Min. Turning Radius(Inside/Ouside) | mm | 4870/7000 |
Vibration Frequency | Hz | 50/67 |
Nominal Amplitude | mm | 0.3/0.8 |
Centrifugal Force | kN | 103/159 |
Drum Diameter | mm | 1300 |
Drum Width | mm | 2130 |
Engine, Model | DEUTZ BF04M2012C | |
Rated Power | kW | 2300 r/min,98 |
Advantages:
state-owned company
fortune 500 company
AAcustom
Why choose us?
1 sincre
CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the equipment such as tower cranes, produced by CNBM are compliant with the national level quality.
2 professional
Our engineers will at your services 24hours to solve all your tower crane installation and other questions. Our goal is to provide the best professional services.
3 quality
CNBM International’s tower crane have strict quality control, only the best quality products can pass the test.
4speed
We have professional sales team to guarantee your reply within 12hours to save your precious time.
5 After sales
If the tower crane has any problems, we will solve your problems in first time.
- Q: What are the major components of a vibratory roller?
- There are several kinds of vibratory rollers: single cylinder wheel, double steel wheel, rubber wheel and so on.Take a single cylinder as an example, the main components include engine, hydraulic system, steel wheel, drive axle, cab, electrical system, structural parts, etc.
- Q: The vibratory roller is rolled back and forth several times at a time
- From the left to the right, or from the right to the left, roll the construction area once, as far as the lap of the previous work area is concernedGenerally, when the actual construction is not calculated, the number of rolling, as long as the road roller can not stop
- Q: Excavators, forklifts, bulldozers, rollers with the same tonnage fight who badly rank
- when other machine ran first and then driving the main digging sub floor, kill the driver, do not close machine line, so this is a boring the problem is driving technology, the two is to have strategic thinking, the three is not afraid of death.
- Q: I've been driving the rollers for two years. Here we are in accordance with the basic salary + wages will shift law after the contract and benefit salary I now 800+ monthly rent when I remember most clearly my day and night dry for a month basically the month every day with 16 hours of work time more than I had the whole 1600 Qian Pingchang a month is 1000 you say they do about promising the old workers set the contract year is 3W to about 5W hey really worry awayAnd do this set not what a concept of time site live on what usually have something to do to some 1 midnight when the call sites work hot summer winter freeze to death and death awfully dirty wages so low done two years not given the contract (is not what the payment of insurance we say this promising)?
- But your salary is a little small, but also willing to be regional, whether package, board and lodging and other factors, in short, happy
- Q: At the construction site, should the scraper, dump truck and roller be equipped with sprinkler?
- In fact, there is no absolute, but equipped with watering truck will be much easier!
- Q: Building construction, taking vibratory compactor as an example, illustrates the method of compaction Matters to be attended to?
- Compaction method has three principles: (1) first light and heavy: (2) first slow, then fast; (3) first low and high;It should be noted that: (1) the time of compaction, soil base must be appropriate water content, asphalt mixture temperature appropriate.(2) the role of the regulator - first slow and stable, is to maintain the new layer without deformation:(3) crown holding by low in high RCC will guarantee;(4) asphalt mixture rolling - watering appropriate, non stick office building, but quickly cool down
- Q: The rollers are divided into several types
- The routine use: single steel wheel used in roadbed, double steel wheel and rubber wheel. But according to the construction in the oil surface different processes and materials, double steel wheel and the rubber wheel will be used in the roadbed.
- Q: How can the asphalt be crushed between the road and the road, and the roller will cut the road along the stone
- Be close to the kerb and be careful about rolling, and shall not be too close to the edge.
- Q: What is the design principle?Experts: how to build a large machine --- roller, the internal structure of its drum (with the brief introduction of the best)? What is the design principle? What is the maximum weight of the drum at present? What kind of traction equipment do you need? Thank you very much.
- But no matter what kind of structure, the vibrating wheel is composed of vibrating wheel body, excitation chamber and mounting support part. The vibration chamber is composed of an internal and external bearing seat, a vibration shaft, a vibration bearing, etc. the mounting support part comprises a mounting plate, a shock absorber, a frame bearing, etc..
- Q: What's the difference between a three wheeled steel cylinder roller and two wheeled steel cylinder roller?
- Three wheeled steel roller: 12t, 12~15t;Tire roller: 12~20t, 20~25t;Vibratory roller: 6T, 14t;Walking type small vibratory roller: 2t;Vibration plate quality: not less than 180kg, the vibration frequency is not less than 3000 /min.
Send your message to us
Road Roller Buy D812H Road Roller at Okorder
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 300 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords