• PVC Portable Fence Panels for Wholesales with New Design System 1
  • PVC Portable Fence Panels for Wholesales with New Design System 2
PVC Portable Fence Panels for Wholesales with New Design

PVC Portable Fence Panels for Wholesales with New Design

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
50000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

PVC Portable Fence Panels for Wholesales with New Design

1. It can keep good looking for years which are longer than wood fence.

2. You need not to paint or stain. And it can resist being fade.

3. Strong point: aluminium steel inser to reinforce the fence.

4. Our products are environmental friendly and non-toxic.

5. We can offer any length or size according to your needs.

PVC Portable Fence Panels for Wholesales with New Design show :

Factory Capacity :

Trade Items Of  Field Horse Fencing

Packing:1. Envirnment PE bag export packing
2. Carton as customer's request
Transaction:T/T,L/C,D/A,D/P, Western Union
Payment Term:FOB,CIF,CFR
Port:China main port
Delivery time:supply quick delivery time, normally 15 working days
Sample Cost:Free sample cost
Sample Time:Small piece sample one day, full section sample 2 days

Service:

1.Sample can be offered with free sample charge and courier fee by buyer's side. 

2.We have full stock and can deliver within short time.

3.OEM and ODM order are accepted, Any kind of logo printing or design are available.

4.We offer you the different types of product.

5.Good Quality + Factory Price + Quick Response + Reliable Service, is what we are trying best to offer you.

6.All of our products are produced by our professional workman and we have our high-work-effect foreign trade team, you can totally believe our service. 

7.We are very glad that customer give us some suggestion for price and products.

FAQ:

Why choose us ?

 1.Commpletely production line. From raw material to delivery, all fences have passed strict tests, so the quality can be assured.

2.Delivery time: about 7 days for a 20ft container.

Where is our main market ?

The products are exported to Northern America, Australia, Canada,Europe and so on.

 

 

Q:Traffic accident crime can not be brought to the civil service guardrail?
The traffic accident crime can be broken into the guard rail, accompanied by criminal suit and called for damages.In the criminal procedure law, the ninety-ninth victims suffer material losses due to the criminal act of the accused, and they have the right to file an incidental civil action in the course of criminal proceedings. If the victim dies or loses his capacity for action, the legal representative or close relative of the victim shall have the right to file an incidental civil action.If it is the loss of state property or collective property, the people's Procuratorate may institute supplementary civil action when prosecuting.
Q:Traffic, driver's license subjects, in the highway driving vehicle crash barrier, what protection measures?
It should hit the side of the collision. Because if at high speed, the speed will be soon after the collision, to the upstairs said will be in the opposite direction. At this time, if you have the opposite direction direction, the car will deviate from the more powerful, will let the car in the middle of the road! And, in case the car stops and stops in the middle of the road, it's more likely to cause two accidents, which is more dangerous! So, the correct thing is to hit the side of the collision and stop by the guardrail
Q:A few days before the night, my boyfriend drove, because not familiar with the road, accidentally damaged traffic guardrail, fence in front of the right lead to depression, (it was only the right side of the damaged head) then the accident appraisal center, out of the 4.32 meters square line fence (2) the amount of 1300. upright and round end (1) the amount of 500. blocks (4) 240. I do not want to lose, just want to ask such a reasonable compensation.? ask professional personage to give answer, thank you!
You need to see if the procedure of the identification center is legal and the standard is correct. If it is legal and correct, you need to pay for it. It's a simple reason to compensate for the damage.
Q:Twenty-seven this month, 19:58 in the pine Fen North Bridge, a license plate number for the Su *-*9641 minivan suddenly he crashed into a roadside fence, passers-by were hit startle, the car down a man on a drive the beauty in his back open stroll up, the car did not seem affected by major injuries, second days work hair, the poor fence also stubbornly stick to their posts. In which cable!
The traffic law of ninety-ninth one of the following acts, by the traffic administrative department of the public security organ for more than two hundred yuan to two thousand yuan fine: (a) without obtaining a driving license, motor vehicle driving license is revoked or motor vehicle driving license is suspended during driving;
Q:Construction plan of plastic steel guardrail
I. General Situation of EngineeringThe contract section of major projects for the fence, anti dazzle board and contour standard, construction period: K249+500~K268+750 pile, the road length is 19.25Km. According to preliminary statistics, the fence works about 89Km, anti glare board project volume of about 1020m; outline project, about 4850 projects.The project construction period for the initial 6 months, plans to start in early March 2006, completed by the end of August 2006.Two. Organization of project management and key personnelIn order to ensure the smooth progress of the project contract, set up the project manager, appointed project manager of a project, a chief engineer, and the establishment of the relevant functional departments, organization of the contract project management organization. According to the actual engineering, ready to move in 46 construction personnel, including construction management technical personnel 8. At the same time, the company will be in accordance with the progress of the project and the duration of the project, at any time can increase the construction staff to meet the progress of the project needs. Project management, organization and division of labor. See Table 5 (A), "the organization of the company and the organization for the purpose of this project".
Q:When the car hits the guardrail, what information does it require after the fire is abandoned?
4, report the inquiry transcripts (survey members contact the owner to record record of the insurance company's Insurance Company received a report after);5, at the time of the accident the driver of a valid driver's license and vice;6, "motor vehicle driving license" of the positive page, vice page, annual examination page copy, view the original;7, the identity of the insured, the identity card is positive and negative;
Q:What are the aspects of road guardrail design?
Other answersRoad guardrail in the security building traffic facilities market can also be called traffic guardrail or municipal guardrail. This series of products is mainly in order to regulate the road traffic order and mobility. In order to improve the road vehicle traffic speed. To prevent illegal U-turn vehicles at random. The protection of pedestrians and non motor vehicles crossing the road traffic safety can be effectively. The prevention of road traffic accidents. To reduce the traffic accident losses. Design of road guardrail should be considered from which aspects?There are three aspects to consider in the design of road guardrail:A structural safety design: in order to meet the needs of municipal traffic management. The road guardrail assembly technology design. Manufacture. Surface coating production and installation. In order to ensure high strength of municipal traffic guardrail. High safety requirements. The steel of different materials. The reasonable structure design and component design to meet the requirements the security strength of different installation methods. Using assembled to convenient economy. Without the need of professional and technical personnel to participate. To meet the special needs of municipal traffic. When the barrier is damaged by accident. No need to replace the whole. Just use professional tools to replace the damaged part. The municipal traffic control department and can save a lot of money in the installation and maintenance human.
Q:What are the types of traffic barrier and the size and requirements of each classification?
Some of the middle of the fence without vertical interval or vertical interval is too large, pedestrians can easily drill the fence, there are security risks; some barriers, intensity difference, human hand can remove isolated joints, easily damaged, useless; some rail welding point, not the bottom surface anticorrosion treatment, surface paint or plastic dipping treatment low, easy to rust, corrosion resistance, short service life.
Q:What is the standard height of highway guardrail design?
The main consideration of the height of guardrail is the density of people and the terrain along it. 6 specifications for the use of cold-formed equilateral channel steel are provided for different force conditions, while other appropriate cross section steel is also available under the condition of strength and stability. From the main force direction of the channel column, the choice of specifications should make the core of the Y-Y axis (Iy) larger channel steel. The effective height of the national JTJ074-94 fence standard ranges from 1.6~1.8m, and this range of values takes into account the adult height to prevent crossing as the main design goal. It is observed that if people want to enter the highway, they usually destroy the guardrail, and the damage position is below 1.2m. Set up a high fence, although it can better prevent people from crossing, but it can not prevent people from entering the highway. What can really regulate people's behavior is legal awareness and social civilization. With the development of society and the improvement of people's legal consciousness, the number of people who violate traffic laws is bound to decline. Britain and other developed countries highway double ring fence design height is about 1.3 meters. Therefore, the fence should not be set too high, it is recommended in the general area, fence exposed height in the 1.2m-1.5m can be, the special areas in 1.6m is appropriate. This height of people is not easy to cross, but also saves investment. How much is the spacing between the posts of the guardrail net; because the height of the fence post is lowered, it is suggested that the column spacing should be 4m, and that it should be set at 201 5m per kilometre;
Q:Crash guardrail 3-5 meters, afraid to ask me more money, I did not report insurance, I think the loss is not much, I did not expect to repair the car to 4400 yuan. Hey, now have to repair at their own expense, depressed.
When driving into the middle of the road, the guardrail should pay for the guardrail, and then pay the fine given by the traffic police.One of the ninety-ninth acts that refer to the traffic law shall be fined by the Department of traffic control of the public security organ for not less than two hundred yuan but not less than two thousand yuan:

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords