• L28 Crown roof railings System 1
  • L28 Crown roof railings System 2
  • L28 Crown roof railings System 3
L28 Crown roof railings

L28 Crown roof railings

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Product Description:

Our products are specialized, through the provision of high quality, innovative design products and attentive service and dedication to provide customers with high-quality , durable , cost-effective , innovative portable products, all in the US market leader in this industry , and won at home and abroad high praise

 

2. Product Characteristic:

1 , Welding : Using now the latest high frequency seamless welding technology , welding point perfectly.
2 , cloth tape : tape weaving machines imported from Germany, knitting , using plain weave , to better showcase the company 's visual identity , more beautiful , more taste .
3 disassembly : The product from the expansion joints , cloth belt, shaft , base composition , free disassembly assemble , easy to transport and car.

 

3.Specification

Product Specifications: 38 * height 900mm
Material: Stainless Steel
Whole items include: stainless steel rod , chassis, counterweight , lanyard 2 meters ( optional lanyard and different hooks)
Packaging: pole 20 / carton + wooden frame , chassis 20 / carton + wooden frame ,

 

4. Reference Picture:

Q:Determination of traffic accident responsibility for pedestrians crossing guardrail
In this case, pedestrians should bear the main responsibility for your negative responsibility, but the responsibility of traffic police, and you will let you bear the main responsibility for negotiation, even full responsibility, so the insurance company will pay more than a little, because your car insurance is insurance, the insurance company will according to your responsibility for claims the medical expenses, including pedestrians and cars you money.
Q:How do you handle a guardrail when you hit the road?
(two) the vehicle is handed over without obtaining a driving license or driving license is revoked or withheld driver;(three) escaping after a traffic accident does not constitute a crime;(four) motor vehicles exceed fifty percent of the speed limit;
Q:Does the traffic barrier isolation work belong to the construction project?
Covers housing construction, railway engineering, highway engineering, water conservancy engineering, municipal engineering, coal mine engineering, port engineering, marine engineering, civil engineering, commercial and material engineering, agricultural engineering, forestry engineering, food engineering, petroleum engineering, offshore oil engineering,
Q:What are the penalties for damaging highway and traffic safety facilities?
Traffic safety facilitiesTraffic safety facilities play an important role in ensuring traffic safety and reducing the potential accidents. Good safety facilities system should have many functions, such as traffic management, safety protection, traffic guidance, isolation, blocking and glare prevention. Road traffic safety facilities include signal lights, traffic signs, road marking, guardrail, isolation grid, lighting equipment, line of sight guidance, anti glare facilities, etc..
Q:What is a highway guardrail drilling machine? What's the difference between it and highway guardrail and pile driver?
The utility model relates to a highway guardrail drilling machine, also called a guardrail large catch integrated vehicle, which is a new type of equipment upgraded by a road barrier and a pile driver. The utility model has two functions of piling and drilling, and realizes the dual-purpose of a machine
Q:Whether or not the guardrail end of the highway needs to be put into anti-collision barrels
According to the highway code, the anti-collision bucket is not the norm
Q:Construction plan of plastic steel guardrail
I. General Situation of EngineeringThe contract section of major projects for the fence, anti dazzle board and contour standard, construction period: K249+500~K268+750 pile, the road length is 19.25Km. According to preliminary statistics, the fence works about 89Km, anti glare board project volume of about 1020m; outline project, about 4850 projects.The project construction period for the initial 6 months, plans to start in early March 2006, completed by the end of August 2006.Two. Organization of project management and key personnelIn order to ensure the smooth progress of the project contract, set up the project manager, appointed project manager of a project, a chief engineer, and the establishment of the relevant functional departments, organization of the contract project management organization. According to the actual engineering, ready to move in 46 construction personnel, including construction management technical personnel 8. At the same time, the company will be in accordance with the progress of the project and the duration of the project, at any time can increase the construction staff to meet the progress of the project needs. Project management, organization and division of labor. See Table 5 (A), "the organization of the company and the organization for the purpose of this project".
Q:How to punish guardrail hit escape?
The circumstances are serious and constitute a crime:If a major road accident is committed in violation of the laws and regulations of road traffic safety, if the case constitutes a crime, criminal responsibility shall be investigated according to law, and a motor vehicle driving license shall be revoked by the traffic administrative department of the public security organ.
Q:There is no legal basis for road fines when traffic accidents cause damage to highways
On the basis of law. The loss needs to be assessed and then punished accordingly.
Q:Hello, I would like to ask June 24th my car just hit a roadside barrier when viewing and did not hit people directly drove away but in September 5th when police went to my house, I hit someone and then buckle my driving license and driving license and car but the police refused to show the camera is that my butt is this going on?
The traffic administrative department of the public security organs received eleventh traffic accident alarm or the police command, shall immediately send traffic police rushed to the scene. If there are casualties or other emergency situations, the first aid, medical treatment and fire control departments shall be notified in a timely manner. Any damage to the roads, power supply or communication facilities shall be notified to the relevant departments in a timely manner.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords