• Professional Production Aluminum Concrete Formwork System 1
  • Professional Production Aluminum Concrete Formwork System 2
  • Professional Production Aluminum Concrete Formwork System 3
  • Professional Production Aluminum Concrete Formwork System 4
  • Professional Production Aluminum Concrete Formwork System 5
  • Professional Production Aluminum Concrete Formwork System 6
Professional Production Aluminum Concrete Formwork

Professional Production Aluminum Concrete Formwork

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
200 m²
Supply Capability:
60000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Aluminum Form Work Brief Introduction : 

Aluminum Formwork is widely used in highway,railway,bridge,tunnel and shearing wall,etc. It is with light weight and smooth for surface concrete and popular in constructions .

 

2.Characteristic for Wholly Steel Formwork :

   1) High Smooth Surface

   2) Convex ling for Edge Rib

   3) Specialized Connection Pin for Edge Rib Connection

   4) High Stiffness for Aluminum Surface

   5) Light Weight for saving producing cost

   6) Fast Separate and Easy transport

   7) Recycling using

 

3. Aluminum Formwork Specifications:

    1) Maximum Column Size:900 x 900mm   (2’-11.5”x 2’-11.5”)

    2) Design Concrete Pressure: 1,800 psf (90 kN/m2)

    3) Standard Panel Width 900mm, 750mm & 600mm  (2’-11.5”,2’-5.5” & 1’-11.5”)

    4)Standard Panel Height: 3.0m, 2.4m, 1.2m


4. Aluminum Formwork Parts

Professional Production Aluminum Concrete Formwork

Professional Production Aluminum Concrete Formwork

Professional Production Aluminum Concrete Formwork

Professional Production Aluminum Concrete Formwork

Professional Production Aluminum Concrete Formwork



 

5. Factory& Product Photos :

 

Professional Production Aluminum Concrete Formwork

 

Professional Production Aluminum Concrete Formwork

 

Professional Production Aluminum Concrete Formwork

 

6. FAQ

1) What is the payment terms in our Company ?

Generally TT, LC At Sight, West Union , Moneygram . Besides , we can accept LC After Sight , DP etc.

2) Packing For Aluminum Formwork.

Nude or Pallet for Big Formwork and the Accessaries in PP bags.

3) Quality Guarantee

We have Strictly Quality-Inspection Department and we also can apply SGS and other Third-Party Agency to check the Products to make sure superior quality .

4) After Sales Service

We can send our engineer and sales manager to your job site for work and installation direction and make training for your workers .

5) Time of Delivery

We can overdo work for the customer to make sure the fast shipment



 

 

Q:Whether a shear wall aluminum template and wood template can be mixed
The high strength and stability of the aluminum template are good, and the surface roughness of the concrete is high and the precision is high, which can be removed from the surface. The fixed method is simple and quick,
Q:Now the domestic use of aluminum template project more?
Construction of aluminum alloy template construction advantages are: 1, the construction period is short, four to five days can be a layer; 2, re-use more than 200 times, effectively reduce costs; 3, artificial reduction of 30%, construction convenience, high efficiency; The template 2 times the bearing capacity, good stability, high bearing capacity;
Q:Aluminum template of the aluminum template advantage characteristics
Aluminum template system components need to be designed according to the characteristics of the floor, the design of technical staff capacity requirements are higher. Approximately 80% of the modules in the aluminum template system can be recycled in multiple projects, while the remaining 20% can only be recycled in a class of standard floors, so the aluminum template system is suitable for high-level buildings with high levels of standardization. And villa group.
Q:In the Sheng-aluminum template installation workers, how to develop prospects
First, it is obeying the instructions. Then, hard work hard not to suffer. Finally, either honestly go to a climb, or put you out. Solution is completed, I was Sheng through drops!
Q:What is the development prospect of aluminum template design?
More than the number of turnaround, good economy: aluminum alloy template system can be used up to 300 times, each set of template system in a slight improvement can be re-used in the follow-up of new buildings, resulting in long-term low template sharing costs. Aluminum alloy template waste can be fully recycled.
Q:What is the change in the aluminum template?
The turnover of the aluminum template is determined by the use of performance. The use of aluminum template system to improve the overall construction efficiency of the construction industry, including in the building materials, artificial arrangements are greatly saved a lot of aluminum template, also known as aluminum alloy template, is made of aluminum alloy building templates, to solve the traditional The existence of defects in the template, greatly improving the construction efficiency.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords