• Prefabricated House Of Steel Frame System Low Cost Heavy Steel Building Construction System 1
  • Prefabricated House Of Steel Frame System Low Cost Heavy Steel Building Construction System 2
  • Prefabricated House Of Steel Frame System Low Cost Heavy Steel Building Construction System 3
Prefabricated House Of Steel Frame System Low Cost Heavy Steel Building Construction

Prefabricated House Of Steel Frame System Low Cost Heavy Steel Building Construction

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m²
Supply Capability:
10000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Prefabricated House Of Steel Frame System Low Cost Heavy Steel Building Construction





Typical project 

Prefabricated House Of Steel Frame System

Prefabricated House Of Steel Frame System Low Cost Heavy Steel Building Construction

Prefabricated House Of Steel Frame System Low Cost Heavy Steel Building Construction

Prefabricated House Of Steel Frame System Low Cost Heavy Steel Building Construction

Prefabricated House Of Steel Frame System Low Cost Heavy Steel Building Construction

Description for Prefabricated House Of Steel Frame System:

Size

length X Width X Eave height, roof Slope

Type

single slope, double slope, muti-slope;

single span,double-span ,multi-span;

single floor, double floors

Column and beam

hot rolled or weld H section steel, grade Q345(S355JR)

Bracing

X or V or other type bracing made from angle , round pipe

Purlin

C or Z section size of C100~C320,Z160~Z300

Roof and wall

single colorful corrugated steel sheet;

sandwich panel with insulation of EPS, ROCK WOOL or PU

Accessories

semi-transparent skylight belts, ventilators, down pipe, out gutter etc.

Surface

frame steel:twice anti-corrosive primer and one finish paint;

secondary steel:hot galvanized

Package and loading

nude cargo loaded into 40'HQ


Packing

one 40HQ container loads about 100-140sqm of house.

The package method is bulk in container.

 

Installation

We send engineer to teach local workers to install and assembly.

4-6 workers can install a set of 100sqm house within 7 days.

The founation shall be used concrete ground or steel structure construction on pillars.

 

FAQ

Q1: Why buy Materials & Equipment from OKorder.com?

A1: All products offered by OKorder.com are carefully selected from China's most reliable manufacturing enterprises. Through its ISO certifications, OKorder.com adheres to the highest standards and a commitment to supply chain safety and customer satisfaction.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: What is the service life of a Prefabricated House?

A3: The life of a prefabricated house is at least double that of a corresponding concrete building.

Q4: Why choose a Prefabricated House?

A4: Prefabricated Homes are built to high aesthetic and architectural standards. Additionally, Prefabricated Houses are more resistant (better earthquake protection) and are not affected by extreme weather events, use eco-friendly materials, and offer excellent insulation and energy efficiency.

Q5: Are Prefabricated Houses safe?

A5: Our houses are completely safe. Advances in the field of prefabricated buildings have reached a point that today Prefabricated Homes are considered safer than traditional homes built with brick. In areas with high seismic activity and in countries prone to extreme weather events residents prefer prefabricated homes for safety reasons.


Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords