Power Stacker RSS1632 RSS1636 RSS1645 Ride seated
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
PRODUCT NAME:Power Stacker RSS16PRODUCT INTRO
Up to h3 mm | ACTUAL CAPACITY (Q) kg | ACTUAL CAPACITY EITH SIDE SUPPORT | ||
2900 | 1600 | 1350 | 1600 | 1350 |
3600 | 1000 | 850 | 1200 | 1000 |
4000 | 800 | 650 | 1000 | 850 |
4500 | 600 | 500 | 800 | 650 |
5500 | 650 | 550 | ||
Load centre distance (C)mm | 600 | 700 | 600 | 700 |
Designation | Closed mast height h1 mm | Free lift h2 mm | Lift height h3 mm | Extended mast height h4 mm |
Two stage | 2147 | 185 | 3200 | 3660 |
2347 | 185 | 3600 | 4060 | |
Two stage (full free) | 2797 | 185 | 4500 | 4960 |
2147 | 1660 | 3200 | 3680 | |
2347 | 1860 | 3600 | 4080 | |
2797 | 2310 | 4500 | 4980 | |
Three stage | 2240 | 1740 | 5000 | 5505 |
2500 | 1960 | 5500 | 6040 |
1KG=2.2LB 1INCH=25.4MM
Characterris tics | 1.2 | Model of manufacture | RSS1632 | RSS1636 | RSS1645 | |
1.3 | Power supply(electric,diesel,petrol,gas ,mains electric) | electric | ||||
1.4 | Type of operation(hand,pedestrian,stand on,rider seated, order-picker) | Ride seated | ||||
1.5 | Capacity /rated load | Q Kg | 1600 | 1600 | 1600 | |
1.6 | Load center distance | C mm | 600 | 600 | 600 | |
1.8 | Load distance | X mm | 765 | 765 | 765 | |
1.9 | Wheelbase | y mm | 1478 | 1478 | 1478 | |
Weights | 2.1 | Weight(including battery) | Kg | 1543 | 1568 | 1626 |
2.2 | Axle loading laden, drive end/load end | polyurethane | ||||
2.3 | Axle loadings unladen, drive end/load end | mm | Φ254x82 | Φ254x82 | Φ254x82 | |
Wheels, Chassis | 3.1 | Tyres(Vulkollan,pneumatic,polyurethane) | mm | Φ85x70 | Φ85x70 | Φ85x70 |
3.2 | Tyre size drive end | Φ150x60 | Φ150x60 | Φ150x60 | ||
3.3 | Tyre size load end | 1x-1/4 | 1x-1/4 | 1x-1/4 | ||
3.4 | Castor wheels(dimensions) | b10 mm | 712 | 712 | 712 | |
3.5 | Wheels, number (x=driven wheels)drive end/ load end | b11 mm | 395 | 395 | 395 | |
3.6 | Track width(front) | h1 mm | See mast table | |||
3.7 | Track width(rear) | h2 mm | See mast table | |||
Basic Dimensions | 4.2 | Closed mast height | h3 mm | See mast table | ||
4.3 | Free lift | h4 mm | See mast table | |||
4.4 | Lift height | h6 mm | 2160 | 2160 | 2160 | |
4.5 | Extended mast height | h7 mm | 960 | 960 | 960 | |
4.9 | Height of steering wheel | h14 mm | 1180 | 1180 | 1180 | |
4.15 | Fork height lowered | h13 mm | 85 | 85 | 85 | |
4.19 | Overall length | l1 mm | 2226 | 2226 | 2226 | |
4.2 | Length to face of forks | l2 mm | 1076 | 1076 | 1076 | |
4.21 | Overall width | b1 mm | 1050 | 1050 | 1050 | |
4.22 | Fork dimensions | s/e/l mm | 60/180/1150 | |||
4.25 | Fork carriage width | b3 mm | 645 | 645 | 645 | |
4.32 | Overall fork width | b5 mm | 575 | 575 | 575 | |
4.33 | Floor clearance under mast,laden | m2 mm | 25 | 25 | 25 | |
4.34 | Working aisle with 800x1200 pallet lengthwise | Ast mm | 2630 | 2630 | 2630 | |
4.35 | Outer turning radius | Wa mm | 1840 | 1840 | 1840 | |
Performance Data | 5.1 | Speed laden/unladen | km/h | 8.5/9 | 8.5/9 | 8.5/9 |
5.2 | Lift speed, laden/unladen | mm/s | 145/215 | 145/215 | 145/215 | |
5.3 | Lowering speed, laden/unladen | mm/s | 260/270 | 260/270 | 260/270 | |
5.8 | Gradeability , laden/unladen | % | 6/10 | 6/10 | 6/10 | |
5.1 | Brakes | electric | ||||
E-Motor | 6.1 | Drive motor | kw | 3.0(AC) | 3.0(AC) | 3.0(AC) |
6.2 | Lifting motor | kw | 3 | 3 | 3 | |
6.3 | Battery acc. to DIN43531/35/36A,B,C,no | 43531 B | 43531 B | 43531 B | ||
6.4 | Battery voltage,norminal capacity k5 | V/Ah | 24/480 | 24/480 | 24/480 | |
6.5 | Battery weight | Kg | 460 | 460 | 460 | |
Battery dimensions I/W/h | mm | 1010/210/750 | ||||
Others | 8.1 | Type of drive control | MOSFE MOSFET Control AC | |||
8.4 | Noise peak at operator’s ears | dB(A) | <70 | <70 | <70 |
Related Products
- Q: What is the reason for the automatic lowering of the hydraulic platform
- The overflow valve opens and closes and is not properly closed, and checks for leaks.
- Q: How is the lifting handle of the universal knee-milling machine very tight
- There are a lot of problems with that. It depends on the circumstances. If it's an old machine, it won't be easy to judge. New machine tools are different,
- Q: What device is better to design a platform that is 1 square meter or so?
- Hello, we are jinan Kowloon hydraulic machinery manufacturing co., LTD., which produces elevators,
- Q: How to use the ball screw platform?
- Second, heyman screw can see lu, platform settled on first use, carefully to see if there are any more abnormal hydraulic parts, electrical appliances, layout, to ensure that no more than about geomagnetic held before commissioning, no-load again after 3 ~ 5 times a load test.
- Q: You need to make a small lift platform, on top of the robot, non-industry. What you want is to add a light pole with a nut and a bolt, and you can use an electric motor to turn the bolts and the nuts.
- If use reduction motor may speed not soon (and consider the design of lifting platform under actual gravity reduction ratio), the situation of the specific need according to the design requirements, weigh the pros and cons.
- Q: Can the stepping motor drive the hydraulic platform?
- Why do you want to use a step motor? You can put a limit on the platform. If you step into the motor, you don't know if it's a linear relationship
- Q: How does the elevator repair
- All parts should be filled with lubricating oil to extend the life of the bearing. The oil and oil level of hydraulic oil. The platform rises all the way up, and in this position, the hydraulic pressure should be 40 to 50 mm above the bottom of the box. Hydraulic oil is a variation of dark, sticky or grit, such as a discovery should be replaced in time (32 # hydraulic oil) Annual maintenance A. check all the hydraulic pipes and connectors. The pipe shall not be broken, the joints shall not be loose, and all the joints must be tightened. Remove and disassemble the descending valve, blow the plunger through compressed air, then load and resettle. C. the elevator hydraulic oil is put in the rejected, tighten the joint remove oil filter, after cleaning, use compressed air is clean, and then back into the tank, and the connecting line. (put on new oil and don't keep using the old oil. Otherwise, the moving parts in the system will accelerate the wear and tear.)
- Q: What standard elevator platform needs to go to the special equipment inspection to report
- (the state council of the People's Republic of China on March 11, 2003 to no. 373 Based on January 24, 2009 the state council on amending the decision of the < > special equipment safety supervision regulations "amendment)
- Q: How to maintain the platform?
- The platform comes in many forms: a, hydraulic. B, mechanical, etc. Hydraulic platform maintenance essentials: 1, to minimize the use of the rustbelt for safety and safety. 2, the joints should be lubricated regularly and lubricate. Regularly check for corrosion or damage to the top of the high pressure tubing and tubing. 4, the limit switch is maintained in good condition, not water or moisture. Always check the oil pump pressure and the oil gauge line. 6, check regularly for oil spills. 7, daily clean maintenance work.
- Q: Diablo ii flame volcanic mission will not be able to jump
- Push the pole to the right to climb quickly to seize the board on the wall, press the left key to left, after the magma press e and ran to the front of the counter, jumped to the table according to move to the left along the plate on the plate
Send your message to us
Power Stacker RSS1632 RSS1636 RSS1645 Ride seated
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords