Power Stacker CLD1032(FFL) CLD1032 CLD1032FFL
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
PRODUCT NAME:Power Stacker CLD1032(FFL) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PRODUCT INTRO | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Smooth travel and lift with excellent controls to reduces product damages and increases productivity. Driving unit: from Europe
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Related Products |
- Q:How much is the construction elevator equipment
- The principle is different, the construction elevator operates in the litter box. The elevators are short for construction elevators, which are very high in the safety and performance of large facilities that can be used on the site. The construction elevator should be a dual-use lifting device. Type 1, imobile elevator construction lifter is a kind of lifting good stability, wide range of goods lifting equipment is mainly used for production assembly line height difference between the transport of goods; The material is up and down. Adjust the height of the workpiece when the workpiece is assembled; Top feeder: Lifting up parts when large equipment is assembled; Material on large machine tools; The warehousing and loading and unloading facilities shall be equipped with the loading and unloading of goods such as forklift truck. Depending on the requirements, the attached device can be configured to carry out any combination such as a secure protection device for a stationary elevator. Electrical control mode; Work platform form; Dynamic form, etc. The correct choice of various configurations can maximize the function of the elevator and achieve the best use effect.
- Q:The ball of the universal milling and lifting platform rolls off, how to install,
- Ha ha, use dry oil stick ball into the channel of nut, and then rotate, but make it sound so simple, but to operate because you are not professional to do this, also pretty difficult. First, look at the inner circle of the screw and the outer circulation, and the ball is not in the position of the channel. It is usually necessary to rotate on the screw to prevent the ball from falling.
- Q:The purpose of the rail elevator
- Cannot reach the requirements of the occasion, such as difficult to solve in the narrow space, can make the efficient delivery platform, product set for hydraulic system, the door on the interactive chain, floors and lifting platform work table can set operation buttons, achieve multipoint control.
- Q:There are several reasons for the hydraulic cylinder oil leak on the elevator
- Oil cylinder in and out tubing joint cracking; (I've seen a lot of this in practice.) 2) the sealing damage of the piston rod with the piston rod is caused by the pull of the piston cylinder. 3) cooperate with cylinder liner piston rod out end seal is damaged, this is caused by long-term use of seal aging more, also has a lot of end cover on is too hard to seal extrusion is damaged, there is a lot of domestic manufacturer of hydraulic cylinder design is not reasonable cause (mostly in order to save costs)
- Q:The design of graduation is designed for mobile shearing and hydraulic lift
- Aluminum alloy lift, lift platform aluminum, aluminum alloy lift platform, aluminum alloy elevator, shear fork lifter, cut shear fork lifts, the fork lifts, elevator guide rail type, guide rail type cargo-lifts, set of cylinder type elevator, set of cylinder type lift table, set of cylinder type elevator, fork lift platform, guide rail type lift platform, set of cylinder lifting platform, electric lift high quality manufacturer, welcome new and old customers to choose
- Q:What is the phenomenon of the worker's transport of wood using a lift
- Imobile elevator accessory device can be configured for any combination, such as lifting capsules can be used with the inward and outward transportation equipment, make fully automated conveying process, operators need not enter the elevator, so as to ensure the personal safety of operators, and can realize the goods transport between floor, to improve the production efficiency; Electrical control mode; Work platform form; Dynamic form, etc. Limit the function of the elevator to achieve the best use effect. Imobile elevator optional configuration of hydraulic power, convenience and the surrounding the lap joint of frame, roller rolling or motor, prevent pinches safe touch, organ type safety guards, moving or motor rotary worktable, hydraulic flip table, to prevent falling elevator safety support bar, stainless steel security guard network, power system of electric or hydraulic elevator walking, mesa of ball. A stationary lift is heavy in weight. It's not affected by the environment.
- Q:How to choose the platform and how to use the method
- The purchasing and lifting machinery should not be bought blindly, should be fully market research, and field inspection, determine the size of the company and its credibility. This is one of the first is also a must, many small businesses in order to seek the market now violence and cut corners, so that the lifting platform quality is greatly reduced, although they will sell very cheap, but this kind of machine is not a long time, and the risk is big. As a result, it is a pity that the buyer should not be greedy for a small price.
- Q:How to use the elevator to be safer and more efficient
- Annual maintenance Check all hydraulic pipes and connectors. The pipe shall not be broken, the joints shall not be loose, and all the joints must be tightened. Remove and disassemble the descending valve, blow the plunger through compressed air, then load and resettle. Remove the hydraulic oil, remove the oil strainer and remove the oil strainer, clean it up and then put it back in the tank. Be familiar with 'ten notices' 1, pay attention to the agencies should regularly check and adjust the brake of the brake and the clearance between the brake wheel, flexible and reliable. The clean surface, there should be no dirt, in case of dirt must wash with gasoline or thinners. 2, pay attention to removing the hydraulic tank of fuel cap, remove the cap around earth, unscrew the cap, remove residual impurities in the joint area (not rinse in order to avoid water seeping into the tank), confirmed to open the cap. 3, pay attention to the elevator remove the hydraulic tank of fuel cap, filter cover, test hole, hydraulic tubing parts, cause the system oil when exposed to avoid dust, remove the parts to open completely clear before first.
- Q:The hydraulic platform is compared with the normal lift platform
- Light weight, good maneuverability, suitable for one-man operation. The special mast strap-roller device, which is stable and stable.
- Q:Is the elevator moving faster or slower?
- Speed of computing: lifting speed is equal to the lifting height/(the volume of a cylinder/pump displacement) this article provided by jinan international hydraulic machinery co., LTD. Is for reference only
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Power Stacker CLD1032(FFL) CLD1032 CLD1032FFL
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords