• Plate Compactor HZR-60B System 1
  • Plate Compactor HZR-60B System 2
Plate Compactor HZR-60B

Plate Compactor HZR-60B

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description:

Used for compacting the gravel,soil, asphalt roads, sidewalks, Bridges, car parks, sports venues and the narrow site compaction work. It’s an ideal equipment for highway, municipal departments to build roads, streets, squares.

Easy operation, flexible steering and good welt performance, good shock absorption performance.


Main Product Features:

1. Foldable handle for easy transportation and stock;(straight hand is also available)

2. Open plate provide self cleaning;

3. Radius base plate for easy access to corners;

4. Throttle control for easy holding working speed;(throttle control is optional)

5. Heavy-duty shock mounts reduce vibration to the upper engine and handle;

6. Rubber & canvas mat for brick paving compaction as option.


Product Specifications:

Model: HZR60-A

Engine: Single cylinder, air-cooled, 4 cycles.

Engine Type: Petrol. Robin EY-20D

Power: 5.0HP

Size of Base Plate: 43cm x 38cm

Centrifugal Face: 11KN

Vibration Frequency: 5500VPM

Compaction Depth: 20cm

Forward Speed: 20-25m/min

Compaction Area: 330m2/h

Climbing Ability:0-30°

Weight: 68Kg

Dimention:67cm x 40cm x 54cm



FAQ:

Q1: Does the Plate Compactor use electricity or diesel?

A1: The Plate Compactor is equipped with famous brand diesel engine.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 10 to 20 workdays.

Q4: If we can produce some Plate Compactor according to customers request?

A4: Yes, we can produce Plate Compactor according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5: OKorder and our manufacture both have overseas branches all-around of world, IF needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.


Plate Compactor HZR-60B

Plate Compactor HZR-60B





Q: How to choose a second-hand roller?
Roller is an indispensable road equipment in modern road construction. It is widely used in filling and compacting operations of large scale projects such as highways, railways, airports, runways, dams and stadiums. Compared with the new machine of second-hand roller with good price, steel in the world will give you a brief introduction about, how to buy second-hand roller.First, the use of time is a key factor in determining the price of used rollersTreatment of rollers and other construction machinery, although our country does not have the same as the mandatory scrapping of the car, according to the annual use of 2000 hours to calculate, roller service life is generally 10 years. Due to the new roller, the normal use of the case, five years without heavy repair, the machine during this period generally has a good cost performance. The price of used rollers is usually depreciated by 20% in the first year, and then decreased by 5% each year to calculate the basic price. First year depreciation 20%, second year depreciation 15%, third year depreciation 10%, fourth year depreciation 5%. Fifth years after the machine parts, with normal wear and aging, plus some unpredictable factors, the probability is greatly increased when the need to overhaul the roller prices in general, because of the individual machine product phase is different, there are great differences. After 10 years, the roller, with the impact of technology and other factors, the price is generally maintained at 20% below the price of new machines.
Q: How does a housing appraisal center identify a house that has been cracked by a compactor?
Look at the cracks in the house, measure the slope, and judge the house according to the actual situation
Q: How many tons of rollers are needed for highway engineering?
The answer. Now there are a lot of sites with more than ten tons of roller. The selection of roller tonnage shall also consider the type of pavement structure and material type. It is not necessary to use such a large amount of compaction, and the larger the tonnage, the better the compaction. If the tonnage is too large, it is possible to crush the road material and destroy the pavement structure. After all, layered compaction, tonnage is small, can reduce the thickness of the layer, or increase the number of compaction, which can meet the requirements of compaction.
Q: What kind of hand roller is good for use? Now it seems to be hydraulic and Mechanical
With respect to the hydraulic mechanical type, the performance is more stable, better compaction out, the failure rate is smaller, so the equipment is originally in half considering hydraulic, don't want to bother, every two or three days a problem
Q: I've been driving the rollers for two years. Here we are in accordance with the basic salary + wages will shift law after the contract and benefit salary I now 800+ monthly rent when I remember most clearly my day and night dry for a month basically the month every day with 16 hours of work time more than I had the whole 1600 Qian Pingchang a month is 1000 you say they do about promising the old workers set the contract year is 3W to about 5W hey really worry awayAnd do this set not what a concept of time site live on what usually have something to do to some 1 midnight when the call sites work hot summer winter freeze to death and death awfully dirty wages so low done two years not given the contract (is not what the payment of insurance we say this promising)?
But your salary is a little small, but also willing to be regional, whether package, board and lodging and other factors, in short, happy
Q: When using 20T heavy vibratory roller, what is the backfill thickness per layer?
2, subgrade backfill using heavy roller, in order to ensure backfill quality. The construction of subgrade soil subgrade must be layered backfilling, each layer backfilling thickness is less than 30cm, roller with 18-20T times the number of not less than four times, with cutting ring check its density to meet the design requirements must be.3, after the roadbed forming, should be central line, elevation, vertical and horizontal gradient test, qualified immediately after maintenance, after the expiration of the maintenance report submitted to the quality inspection department for acceptance testing.
Q: It should be the shape of the roller! Ask friends or have other recommended rollers?
The utility model is suitable for various compacting operations of the static pressure roller by the gravity action of the machine itself, so that the compacted layer is permanently deformed and compacted. It is divided into two types: steel wheel type and tyre type. Grinding wheel grinding, grinding groove structure light and kneading etc.. The most common application of light milling is mainly used for compaction of surface layer of road vibratory roller. With mechanical or hydraulic transmission, the utility model can concentrate the compacted part of the protruding part, and has high compaction and smoothness, and is suitable for the compaction operation of the asphalt pavement. According to the layout of the axle, there are single shaft, single wheel, double shaft, double shaft, three wheel and three axle, three wheel and so on. The internal combustion engine is powered by mechanical or hydraulic transmission. General front wheel steering, good maneuverability, rear wheel drive. In order to improve the steering and rolling performance, the articulated steering structure and all wheel drive should be adopted. The front wheel frame is hinged with the frame to reduce the unusual body sway of the road surface. The rear wheel and the frame are rigidly connected. Hydraulic control, hydraulic cylinder control steering. The front and rear grinding wheels are equipped with scraper to remove the adhesive on the roller.
Q: Why can't we use the tire roller in the modified asphalt road?
Because rub tire roller will make the coarse aggregate surface, causing structural depth decreases, and even bleeding.1L children took one look is layman also adopted by the cold
Q: Will the Apocalypse Tank be pressurized back?
but also not explosion damage, the armor is even more powerful, not simply rely on the weight can be crushed,
Q: What are the specific types of Compactors? What is the function of each? What is the difference?
Answer: the roller is divided into six categories: the first category of hydrostatic roller second steel wheel roller third class tire roller fourth kinds drag roller kneading fifth categories (padfoot roller) function of roller roller sixth categories the impact roller for each category can be found in Chinese electromechanical data online! Here I will not say too much! Because Chinese electromechanical data network is quite comprehensive! Pure non handwritten copy and paste to forget to hope you can have a more in-depth understanding of!

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords