• Pipe Cutter SQ-PC-701-3 cuts PVC.aluminium of plastic pipes System 1
  • Pipe Cutter SQ-PC-701-3 cuts PVC.aluminium of plastic pipes System 2
  • Pipe Cutter SQ-PC-701-3 cuts PVC.aluminium of plastic pipes System 3
Pipe Cutter SQ-PC-701-3 cuts PVC.aluminium of plastic pipes

Pipe Cutter SQ-PC-701-3 cuts PVC.aluminium of plastic pipes

Ref Price:
$0.80 - 4.00 / pc get latest price
Loading Port:
Ningbo
Payment Terms:
TT or LC
Min Order Qty:
2000 pc
Supply Capability:
20000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing
Product characteristucs:cuts PVC.aluminium of plastic pipes . when cutting PVC flesible pipe you should revolve the pipe whilst compressing.
Scope of cut : rigid plastic pipes to a maximum diameter of 42mm
 
INSTRUCTION OF USE :
1.
 
Part the handles to suit for cut angle.
2. Compress handles tightly until pipes is cut.
3. After cutting close the handles
ATTENTION:
When using
 
this prouct in the winter it is advisable to put the pipe in lukewarm waterto head, thiswill avoid bust pipes due to cold making pipes fragile for cutting.
If sdge of the cutters,are showing signs of wear and tear.loosen the fixing screw,remove the blade and replace with same type of 
pipe cutting blade.
After use we recommend rusproof oil is aplied to the cutter.

v

Q: What are the commonly used tools for construction workers on construction sites?
Must have a helmet, night construction but also reflective clothing. The use of the construction is probably the level, total station, tape measure, level with more.
Q: Level 1 Registered Architects Site Design Draws what tools to use
Knife, modify the drawings of the knife (drawing error, local changes), T-foot, pen (black, neutral pen line, write on the drawings, marked)
Q: What mechanical tools are required for building waterproofing works?
3, the basement, floor, basement walls used impermeable concrete must be advanced to the material laboratory, made with the experimental report out, reported to the supervision and approval. 4, technical skills and technical requirements of workers
Q: What are the costs of the tools used to build the project?
In order to continuously and systematically and comprehensively account for and monitor the changes of accounting elements caused by economic activities, it is necessary to scientifically classify the specific contents of the accounting objects according to their different characteristics and economic management requirements and determine in advance Classification of the project name, the provisions of its accounting content. This kind of accounting elements of the specific content of the classification of the project, known as the accounting subjects.
Q: What are the tools for the inspection of process engineering in construction projects?
4 wedge-shaped feeler 150 × 15 × 17 1-15 0.5 5 magnetic line falling hammer 300g 6 100 grid grid 240 × 115 × 3 standard brick 0.5% 7 detection mirror 105 × 65 × 11
Q: What art tools do art need? Learn what?
Architectural studies require a certain basis for painting. Architecture, in a broad sense, is the study of architecture and its environmental disciplines. Architecture is a discipline that spans engineering and humanities. The architectural and architectural techniques involved in architecture, as well as the aesthetic side and practical aspects of architectural art as a practical art, are clearly different but closely linked, and their weight varies depending on the circumstances and the Different and very different.
Q: Construction site, what software for three-dimensional modeling?
Previous 3D models were built using 3Dmax, but BIM applications were gradually applied by construction companies
Q: Now super high-rise building curtain wall lifting tools are usually used which
1, the use of hanging basket suspension system to do the bracket, hanging in front of the electric hoist, with the use of tower crane.
Q: What construction machinery is needed at the construction site of the building?
Vibrator Mixer Reinforcement: Reinforcement Straightening Machine Bending Machine, Cutting Machine ... Many equipment should be prepared according to the specific project of the site. In fact, this is the equipment to improve the productivity, but also can not use this equipment, can be done manually, but increase The cost of labor is not cost-effective
Q: What are the architectural drawings of the university?
Drawing tools, should be correct, precision, quality products, the error is small as a good drawing instrument. Ruler, ruler, tape ruler, scale, scale, triangular plate, slot (own production, the market no sale), cutting with the ruler, universal plotter, large compass and so on.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches