• Optical Fiber Cable for Duct/Direct Burial Application System 1
  • Optical Fiber Cable for Duct/Direct Burial Application System 2
  • Optical Fiber Cable for Duct/Direct Burial Application System 3
Optical Fiber Cable for Duct/Direct Burial Application

Optical Fiber Cable for Duct/Direct Burial Application

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or L/C
Min Order Qty:
500M Per Day m
Supply Capability:
5000M Per week m/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Packaging of Optical Fiber Cable for Duct/Direct Burial Application

Packaging Detail:

25kg/bag,kraft paper bags with plastic bags inside

Delivery Detail:

15 days

Specifications of Optical Fiber Cable for Duct/Direct Burial Application

1,for wire or cable sheath

2,quality SGS and ISO9001

3,delievery time 7 days

4,the highest temperature is 70

 

this product is used for wire or cable sheath.

Delivery of Optical Fiber Cable for Duct/Direct Burial Application

 

PROPERTY

UNIT

SPECIFICATION

TEST

HR-70

JR-70

tensile strength 

Mpa

MORE THAN16.3

≥16.8

GB1040

Elongation at break

%

320

310

GB1040

Thermal agining 100°C 168h

--

--

--

--

tensile strength at aging

Mpa

15.4

16

GB1040

Maximum change rate of Tensile Strength

%

-7.1

-4.8

--

Elongation ate Break after aging

%

300

290

GB1040

Maximum change rate of Elongation at break

%

-11.8

-6.5

--

Weight Loss after Thermal aging

g/cm3

9.6

11.2

--

Thermal deformation

%

45

35

--

Brittle point of Low temperature impact

°C

(-)40pass

(-)40pass

GB5470

Thermal stable time at 20°C

min

100

95

--

Volume resistivity at 20°C

Ω.m

5.6*1010

2.2*1013

GB1410

Volume resistivity at working time of 20°C

Ω.m

--

3.5*109

GB1410

Dielectronic strength

mv/m

28

27

GB1408

 

 

 

Q: I would like to ask my new workshop power consumption of about 500KW, injection molding machine, 60KW . 40KW . 20KW . the other 20KW, how much should the wire? Respectively how to use lines and switches more
A very practical proposal: to your local talent market, a large job fairs, and the best and your professional relevance, to see, look at what positions, pay how? You can also chat with hr, you will understand.
Q: What brand of cable is good, what are the top ten brands of wires?
If you are talking about the three-core wire, black - ground brown - line of blue - zero line. If it is 3 plugs, your wire is only 2 lines. Then the yellow received L, black received N. The above is the ground wire.
Q: Apple phone display cable or accessories not certified how to do
Indicating that your Apple data cable is not original, no effect, re-plug the general and you can use the.
Q: IPadmini. The latest version 7.1.1 up in the morning to see the non-stop display this cable is not certified does not support this feature. The The Charger original. Not on the computer charge. The Ask God to answer more
Ipad charge display does not support the general reasons for this and processing methods: . for non-original charger, it will often appear this situation, which is due to the charger does not meet the specifications caused by the replacement of a qualified charger can be. . if the original charger appears the above failure, please continue to look down. . please check whether the data line is normal. The appearance of the data lines seem normal, which may have been broken. Check the method is to borrow someone else's data line to see if it can charge. . shows the plug symbol is normal is full of display. If full or show the lack of electricity, indicating that the phone tail no problem. . again, check whether the original charger can work properly. You can connect the charger to other USB port to see if the phone is working properly. . if the above two check still can not charge, please try to insert the computer's USB port to see if the computer can identify the phone, to identify if it is to see if the charge, if not identified but not charged, it is estimated that the need for maintenance. If you can not identify can not charge, it is necessary to repair. If you can recognize and charge, replace the data cable and the charger (the original estimate is also damaged). . and then look at the voltage is not too low, not only to the maintenance station to repair, and pay attention to the iPad and iPhone do not mix the power adapter, the voltage is different.
Q: Cable a fire line power and why the other did not pick up the line with a pen test also have electricity? Answer detailed point
casing filled with dry cement, and with a wooden hammer tamping, but a certain idea of security, high pressure line once rammed the skin is too dangerous, should be done before power, you now estimated to have power,
Q: Decoration when the purchase of water pipes, wires and other items included in the account
KVV is the control cable, generally do industrial control; and RVS is twisted pair, generally used for weak system, to eliminate the interference requirements of the occasion, such as two-wire bus system, specifically, the electrical fire bus more Such as RS485 bus and so on.
Q: What is the difference between "wire" and "cable"?
Simple point, the plotter is generally used to out of the line map, the general is the Academy of Engineering, the Bureau of the use of a CAD map, and some can also be some effect of the general effect of the map, generally suitable for color requirements are not very high, but right Print accuracy requires a high place. Inkjet machine can be divided into indoor and outdoor ink, outdoor irritating smell, for outdoor advertising like the effect of the map, the indoor no irritating smell, the general subway, as well as other indoor advertising are used this out of
Q: IPhone6 This cable or accessories have not been certified how to solve
Rubber over the bridge surface curing treatment, nice and at the same time to ensure a safe Pressure tonnage: 5 tons to 65 tons, indoor and outdoor are available (and provide only tramway) Uses: used in engineering department exhibition company, power company construction line, play a role in protecting the line Rubber trough ■ tough, insulated, high pressure (maximum load of 65 tons) rubber over the bridge ■ suitable for all outdoor weather, rain, lightning, moisture, flame retardant ■ surface non-slip surface texture ■ Position protection to the type of cable and communication data cable ■ unique design, no need to destroy the ground installation ■ durable, the surface of non-slip surface texture ■ simple installation, easy to move, structural design briefs practical ■ unique elbow, tee, Selection ■ 1 hole, 2 holes, 3 holes, 4 holes, 5 holes design, fully applicable to the exhibition, performing arts, workshops, power, communications, military and other industries 2 Specifications Table 1 Specifications 1000 × 130 × 20 aperture 40 × 13 Weight 12KG (for indoor cable signal line, etc) 2 Specifications 1000 × 275 × 40 aperture 105 × 30 Weight 32KG (for indoor wiring too thick if the wire, etc) 3 Specifications 1000 × 250 × 50 aperture 32 × 35 Weight 7KG (applicable Over motor vehicles and large trucks, etc) 4 Specifications 900 × 500 × 75 Aperture 50 × 60 Weight 19KG (for motor vehicles and forklifts, etc) 5 Specifications 900 × 500 × 75 Aperture 32 × 35 Weight 21KG (for the workshop workshop, such as truck ) 6 Specifications 900 × 620 × 110 Aperture 90 × 90 weight The amount of 28KG (for small trucks and large trucks, etc) 7 specifications 1000 × 310 × 55 aperture 35 × 35 weight 15KG (for workshop workshop forklift or private cars, etc) 8 specifications 770 × 485 × 65 aperture 40 × 40 weight 18KG For the workshop workshop plant forklift, etc)
Q: This cable or accessory has not been certified and may not be able to work with this iphone reliably
The installation process is a certain requirement, high and low voltage cable bridge should be installed separately as usual, a wall laying vertical pipeline (slot) or installation equipment, the power distribution between the depth of D1 = 1200 ~ 1500mm; weak Between the deep distance from the D2 = 1100 ~ 1400mm more reasonable. The length L1 and L2 between the power distribution and the weak can be determined according to how much electrical equipment and pipelines (slots) are installed in the room. "Civil building electrical design specifications" proposed "shaft size in addition to meet the wiring spacing and terminal box, distribution box layout must be the size, but also in the box before the left not less than 0.8m operation, maintenance distance" requirements. In the weak equipment, the operation and maintenance distance is not specified in the provisions of the Code for Electrical Design of Civil Buildings, but it should not be less than 0.8m. Cable to wear steel pipe wiring, should be reserved in the floor steel pipe, wiring should be completed after the plug fire fire blocking material. Cable bridge installation should be horizontal, the maximum sag should not be greater than 10 mm; proposed separate installation
Q: What are the T and T, s of the wire and cable test type?
May be charging head of the problem, the line may also be a problem. If the warranty can be free for the change.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches