• Loader High Cost Performance Gnhc100 System 1
  • Loader High Cost Performance Gnhc100 System 2
Loader High Cost Performance Gnhc100

Loader High Cost Performance Gnhc100

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 PCS
Supply Capability:
1500 PCS/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Loader High Cost Performance Gnhc100 

Product Details

Basic Info.

Model NO.:SUNION GNHC100

 

Type:Skid Steer Loader

Walking Mode:Wheeled

 

Load and Unload Method:Front Discharge

Certification:CE, ISO9001: 2000

 

Condition:New

Operating Weight:3.56t

 

Export Markets:South America, Southeast Asia, Africa, Mid East, Eastern Asia

Additional Info.

Trademark:SUNION

 

Packing:in Bulk or in Container

Standard:SGS

 

Origin:China

HS Code:3111968887

 

Production Capacity:100 Sets/Year

Product Description

SUNION GNHC100 skid Steer Loader
Brand: SUNION
Model: GNHC100
Type: Wheel Loader
Condition: New
Standard: Excallent
Packing: In bulk or in container
Port: Shanghai
Delivery Time: Within 1 month

We have the most detailed info about the machines, if you need, please contact we freely, we'll try our best to satisfy you. 
We also supply much more others construction machines. 
Remember our idea: Services to create value, share a better future. 
Service for you!

ItemGNHC100
Specifications
Rated Load (kg)1200
Tipping load (kg)2400
Bucket capacity (m3)0.7
Operationg weight (kg)3560
Travel speed (km/h)12
Hydraulic pump flow (L/min)120-144
Fuel tank capacity (L)90
Tyre model12/16.5NHS
Overall Size (mm)3560×1900×2150
Dimensions
Height at maximum extension (mm)4070
The maximum pin shaft height (mm)3150
Width with bucket (mm)1900
Wheelbase (mm)1500
Axles base (mm)1185
ground clearance (mm)260
Flip angle40°
Dumping height (mm)2450
Approach angle26°
Departure angle20°
Engine
ModelCummins
Rated power100hp/2500rpm
Displacement (L)3.9

Loader High Cost Performance Gnhc100

Loader High Cost Performance Gnhc100


Q: I also need a couple of different ways they found and mined the gold.
In the early days of any gold rush, miners go to the creeks and pan for gold. They get a shovelful of gravel/sand and throw it in their mining pan and swish it with water. The heavy gold falls to the bottom as the gravel is washed away. Then within a short time two or three miners would get together and build a sluice box or rocker - this is just like panning except it's a long shoot with little boards nailed to the bottom - looks like a chicken ladder. As the gravel and sand is washed down the sluice, the miner rocks the sluice box and the gold settles out behind the little boards in the chicken ladder. These low-tech ways of getting gold out of the creek are always the first techniques to be used. But all the time time the miners are looking around for the source of the gold which is in the creek - when they find that, then they begin mining through hard rock following the color in the rock.
Q: My grandparents own a doublewide with a mother in law apartment in which we live. They would like us to quot;rent to ownquot; the land. We would like to take the doublewide off the lot and replace it with a modular. We do not need any construction coverage as my husband is an excavator. What kind of loan would this require?
You can't get one at all. The land has to be own free and clear first.
Q: its a john deere 27c and i cant stand the beeping, we need to work into the night without bothering the neighbors....HELP
If you can easily get to the beeper itself, just remove one of the wires. You can plug it back in later. Or if they don't unplug, duct tape will do a great job of silencing a beeper. I've actually done that before on a forklift. You can still hear it, but I doubt that it would bother anyone.
Q: I'm an engineer. I was employed at a rather large company that manufactures heavy duty off road vehicles, (Wheel Loaders and Excavators and such). Recently, I've lost my job because the quot;higher upsquot; in my company decided to cut costs. They hired an engineer from India to replace me at a fraction of the cost of my wage. I'm middle class and when I see these people with six figure incomes it makes me question their true worth? They will argue that it's actually positive for our the company and our ecomony, but as I sit here typing this, (unemployed), I wonder....who are the ones benefitting? I am unemployed. I don't build bulldozers any longer but they are still being built. These bulldozers clear the land for the house that I can no longer afford. The carpenter, plumber, electrician, etc. don't have a job because the house was never built. They don't have to buy tools anymore either. The trucks that deliver those tools will be parked. I wish I could type more, but you get the point!
Who knows? Many American jobs are being lost by the failing economy also, and more companies may have to follow suit to stay alive. Sad but true!
Q: I have some and i used it in my leopard geckos tank for over a year now. Is there any way to make it not as hard as cement so that my reptiles can actually burrow in it?
I think you should change the sand type. A fine grounded sand would probably work. You should check with a local pet store and see what they use just in case though.
Q: how much can a used komatsu excavator pc200-5 clocking about 4000-6000hrs cost?
even tho it has that many hours on it plan on dishing out 50 grand or better. Personally Id go for a John Deere. I used to be a heavy equipment mechanic so i think my opinion is valid.
Q: What does PC200 excavator mean? What does PC mean? What do you mean by 200? How big is the bucket capacity?
PC-- Komatsu excavator, 200 tonnage of 20 tons, down 0.9
Q: Card to bel 320d2gc hydraulic excavator how much money
The production of hydraulic excavators is also booming.Excavator hydraulic transmission is closely related, and its development is mainly based on the application of hydraulic technology. Its structure is mainly composed of engine, hydraulic system, working device, driving device and electrical control part, the excavator working conditions required to achieve the action is very complicated, so it puts forward higher requirements for the design of the hydraulic system, the hydraulic system of engineering machinery hydraulic system is the most complex. Therefore, the analysis and design of hydraulic system of excavator has become an important part of excavator.Single bucket hydraulic excavating machine is a mechanical equipment with periodic operation. It consists of three parts: working device, rotating device and walking device.
Q: When was Troy founded, and by who?
The first city of Troy was founded in 3,000 BCE. Ilus, the son of Tros is the founder of Troy according to legend. Ilus (Ilos in Greek) is in Greek mythology the founder of the city called Ilion (latinized as Ilium) to which he gave his name. When the latter became the chief city of the Trojan people it was also often called Troy, the name by which it is best known today. Ilus was son and heir to Tros of Dardania and brother of Assaracus and Ganymede. He won the wrestling prize at games held by the King of Phrygia and received fifty youths and maidens as his reward. The king also, on the advice of an oracle, gave him a cow and asked him to found a city where it should lie down. Ilus did so. Ilus then prayed to Zeus for a sign and at once saw the Palladium fallen from heaven and lying before his tent but was immediately blinded for the impiety of looking on the image. He regained his sight after making offerings to Athena. Ilus preferred his new city of Ilium to Dardania and on his father's death he remained there, bestowing the rule of Dardania on his brother Assaracus instead and so the Trojans were split into two kingdoms.
Q: We are working on a project up North (Nunavut, Cit anada) and there is 45,000 Gallon of JP-4 left there by the USAF in the mid-80's (probably when they turned to JP-8). That's a large volume we would preferably reused than shipped and disposed at high cost in the south. If possible, we are looking forward to mix the JP-4 with additives and use it in the heavy equipment (excavators, trucks, loaders, etc). Some info gathered on the internet mentionned to mix JP-4 with 10W30 motor oil, but we need a precise answer as we cannot afford to damage the diesel engine of the equipment. Thanks a lot for your help !
With this much fuel, some processing is required. This could be as simple as prefiltering prior to use. In order to not harm your engines, you will need to raise the flashpoint of the JP4.(FP = 0F). Petro diesel has a flashpoint of ~180F. Mixing it with waste oil is a good idea, but proportioning will be an issue. You will need to have both the JP4 and the Oil you intend to yse tested in a local lab. You need to know the following 1. pour point 2. viscosity 3. flashpoint. then Prepare a decade series of mixtures with increasing amounts of oil 1% oil, 10% oil, 20% and so on. plot the flash points for this series and determine the exaact mixture that gives you 182 degrees F. If your JP4 is in barrels the mixing is easier. If its in a tank farm there will be more processing. You will have to deal with algae, water and a lot of sediment. good luck

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords