YHZS mobile concrete batching plant is highly integrated concrete batching plant. The main mixer adopt double-shaft compulsory mixer, have the advantage of low mixing time, discharge quickly, mixing equality and high productivity, can produce plastic, dry-hard and other concrete, reliable quality. Aggregate adopt electronic scale cumulative measurement or single measurement, cement、water、admixture are used weighing hopper, accurately measurement, computer centralized control, simple operation, easy adjustment and reliable quality. Aggregate adopt two kinds of feeding method: upgrade hopper or belt conveyor. Electrical components adopt Siemens device, reliable performance and high productivity, suitable for large quantities of concrete which is on site production. The mixer’s scale board and mixing blade using wear-resistant material which has processed special, the special shaft bearing and seal type has greatly improve the life of the mixer.
This machine is functional and consisted by bathing system, mixing system, measuring system and control system, small size, cost-effective, suitable for small or medium-scale hydropower, roads, ports, airports, bridge and other mobility projects.
- Q: The main components of a mixing station
- The conveying system of materials is made up of three parts. Aggregate conveying; There are two ways of conveyance and belt conveyance. The advantage of hopper promotion is that the area is small and the structure is simple. The advantage of belt transport is that the transport is large, efficient and low. The belt conveyor mainly applies to the mixing stations that have aggregate storage, thereby increasing the productivity of the mixing stations. Powder conveying; The powder used in concrete is mainly cement, fly ash and mineral powder. The most commonly used powder conveyors are conveyors of screw conveyors, and the large mixing buildings are carried by pneumatic conveyer and scraper. The advantages of screw transport are simple structure, low cost and reliable use. Liquid transport mainly refers to water and liquid admixtures, which are delivered separately by water pumps
- Q: What is the concrete of the mixing station?
- I am at the work station, the concrete mixing plant is operating goods, use the material such as cement, fly ash, sand, water reducing agent in strict accordance with the provisions of the state standard the ratio of mixing, through concrete truck mixer (commonly known as "car" river) transportation to the construction site, recycled concrete pump for handlebar concrete on the building site. For building products safety, now the big building construction are banned to mix concrete, concrete supply must to the recognition of concrete mixing station to buy, hope to help you.
- Q: What is the concept of on-site concrete mixer station
- It's not a simple blender. It's not a simple blender. But an intensive production scale small and use the site concrete, according to the need to establish a set of automatic production line, divided into according to production output per hour 35 square (45), 50 square (60), 75 (90), 90 (120), the standard station with laboratory; To establish the corresponding scale of the stations according to the construction needs; This kind of mixing station can not only guarantee the quality of concrete, but not the time factor, which guarantees that 24 hours can produce the concrete needed for the site. He needs to have about 30, 000 or so in demand, and the site is suitable. This has low cost, convenient site management and mutual benefit!
- Q: How much concrete is produced per hour by HZS180 concrete mixer?
- Depending on the different areas of the site, the requirement is between 10 and 300, 000, which requires a high level of testing equipment. The cost is relatively higher. The best way is to find a few different test equipment suppliers, according to different manufacturers, equipment, and make a simple quote analysis
- Q: How to choose a good concrete mixer station?
- For simple concrete mixup stations, the overall cost of equipment is much cheaper, because the configuration is different and a lot of configuration is eliminated. But cement weighing cannot save configuration independent water weighing measurement more accurate to efficient, do not use water weighing system can also be mixing concrete, but there is a big hidden trouble. The water weighing system is not suitable for individual water weighing system, and it can reduce the investment of a simple mixing station by about 7, 000 yuan. And shortcomings is not water in the mixing drum of the weighing system and water, time node device can be used to set the water within a certain time interval to churn, but increased water and forced concrete mixer mixing time, still can cause concrete model is not stable. Therefore, although do not use water weighing system can save investment, but will increase the mixing time of concrete and affect the stability of the concrete, so the customer can choose according to oneself circumstance.
- Q: What constitutes the js750 concrete mixing station
- Host one, silo (usually four kinds of material), a set of mainframes, three to four storage tanks (with a cage), and an air compressor, which is usually the case
- Q: How long does it take to build a concrete mixer station?
- The core part of the stirring station: stirring the host, electronic control system, weighing element and instrument. The mixer should choose to use the stirring stability, the maintenance is simple and convenient, the service life is long, the match is supplied with the sufficient production plant. The electric component must choose the international brand products, preferably the imported original product, to guarantee the reliable; The software of the computer system shall be developed by the manufacturer in order to be upgraded and replaced in the future. And there should be a pro version of the software (piracy is prone to malfunctions and possible intellectual property lawsuits).
- Q: What is the special work of the concrete mixing station
- Mixer operator, welder, tester, loader driver's license, assessor
- Q: What is the difference between a concrete mixer and a concrete mixer
- The simple point is: the bones of the mixing tower are on top, and the bone is measured directly into the blender. The bone material of the stirring station is below, and the bone material is measured and then transported into the blender after the slanting belt. In a popular way, it is called the building, which is called the second ascent. Higher initial investment mixing floor production line 400000 station, because of mixing building bin above, therefore the steel structure will be bigger, inclined belt will be relatively longer. But in productivity, the churn is about 20 per cent more productive. In the operation, the energy consumption and the failure rate will increase due to the frequent start of the inclined belt of the mixing station, while the mixing building will be relatively low. Of course, in appearance, the mixing building is a bit more imposing than a mixer-stand, which can sometimes have an unexpected effect on the business. In addition, there are some technology mixing buildings that can be used, and the mixing stations can't be used, because the equipment is different. It's worth noting that the difference between the initial and the mixing stations is not absolute.
- Q: What is the daily routine of the concrete mixing station?
- Your question is fun, you ask is daily work refers to a person or the institution will have job or responsibility, and concrete mixing plant is short for a single search or mixing unit, I put the question to you "what's the concrete mixing station management personnel daily work including".