• High-strength non shrinkage grouting material superfine System 1
  • High-strength non shrinkage grouting material superfine System 2
  • High-strength non shrinkage grouting material superfine System 3
High-strength non shrinkage grouting material superfine

High-strength non shrinkage grouting material superfine

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
2000吨 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

A, grouting material product introduction:

Grouting material with special cement as binder, selected high strength materials as aggregates, with high flow, micro expansion, anti segregation and other material prepared.

The product has good gravity flow, rapid hardening, early strength, no shrinkage, expansive; non-toxic, harmless, non aging, on water quality and no pollution to the surrounding environment, self sealing good, rust and other characteristics. In the construction aspect with reliable quality, reduce the cost, shorten the construction period and convenient advantages. To fundamentally change the equipment base force, so that the whole load uniformly bear device, so as to satisfy all kinds of machinery, electrical equipment (heavy equipment of high precision grinder) installation requirements, is the ideal filling material without pad mounted era.

Two, the scope of application:

Grouting material is mainly used for: the anchor bolt anchor, runway repair, nuclear power equipment, Luqiao fixed reinforcement engineering, machine base, steel structure and foundation with export, equipment foundation grouting, planted two times buried reinforced, concrete structure reinforcement and reconstruction of old concrete structure, crack control, electrical and mechanical equipment installation, track and installation of steel structure, static pressure pile engineering piles, structure of the wall thickening and repair the leakage, all kinds of foundation engineering collapse grouting and various repair engineering etc..

Three, the conventional physical properties of grouting material:
Model No.
Compressive strength(MPa)

Vertical expansion rate

(%)
Fluidity

Grip strength

Round steel.

MPa
The bleeding rate(%)
Remarks
6h
1d
3d
28d
1d

The initial fluidity

30min Fluidity retention value
28d
Universal type
--
≥15
≥30
≥70
≥0.02
≥260
≥230
≥4.0
≤1.0

High strength

--
≥30
≥40
≥70
≥0.02
≥260
≥230
≥4.0
≤1.0

Early strength type

≥20
≥30
≥40
≥60
≥0.02
≥260
≥230
≥4.0
≤1.0
High early type
≥22
≥30
≥40
≥70
≥0.02
≥260
--
≥4.0
≤1.0

Super flow type

--
≥15
≥25
≥50
≥0.025
≥300
≥250
≥3.5
≤1.0
High temperature resistant type
--
≥22
≥40
≥60
≥0.02
≥260
≥230
≥4.0
≤1.0

The engineering design reference: anchor bolts for anchoring cement

380
340
290
270
The maximum set size(mm)
≤4.75
>4.75and≤16
Fluidity(mm)

The initial flow

≥380
≥340
≥290
≥270*
≥650**
30min retention value
≥340
≥310
≥260
≥240*
≥550**

Vertical expansion rate

(%)
3h
0.1~3.5
24h and 3H expansion difference
0.02~0.5
Compressive strength(Mpa)
1d
≥20
2d
≥40
28d
≥60
There is no corrosion of reinforced
NO

Qinshui rate

(%)
0



The engineering design reference

Cement based grouting material choice for anchoring bolt anchor

The spacing of the surface of the bolt and the hole wall(mm)

Cement based grouting material categories
15~50

340、290

50~100
290、270
>100
270

Cement based grouting material selection with two grouting:

Filling layer thickness(mm)

Cement based grouting material categories
5~50
380
20~100
340
80~200
290
>200
270



Four, product characteristics

"Pour 1-3 days after high early strength was as high as 30Mpa, shorten the construction period.

Since the flow field - just add water, stir, direct filling equipment foundation, mortar self construction, free vibration, ensure the grouting construction of long distance without vibration.

Casting body is used for a long time without shrinkage / micro expansion, to ensure that equipment and basic close contact, no shrinkage between the foundation and foundation, and appropriate expansion of the compressive stress to ensure the long-term safe operation of equipment.

* anti oil leakage after 30 days soaking its strength in the oil increased by more than 10%, molding, compacting, impermeability, adapt to the base oil of environmental protection. * durability 2000000 times fatigue test, 50 times freeze-thaw environment test strength has no obvious change.

"Good weather -40 to 600 DEG C is safe for long-term use

* low alkali corrosion resistance of the strict control of raw material of alkali content, suitable for alkali aggregate reaction inhibiting requirements engineering.

Five, the use of methods

1 Foundation Treatment

Cleaning equipment based on the surface, there shall be no stone, laitance, dust, dirt and other debris demoulding agent. Before grouting 24h, fully moisten the surface of equipment foundation. Before grouting 1H, should be sucked up water.

2 determine the grouting method

According to the actual situation of equipment base, selection of grouting method of corresponding flow, because of its good performance, in general, with "weight grouting" can, will paste directly from template export poured into slurry, completely rely on the self weight to leveling and filling the whole filling space; if a large area, especially the complex structure of perfusion or a very small space and distance, can use "high funnel method grouting" or "pressure grouting, grouting method" to ensure that the slurry can be fully filled every corner.

3 formwork

According to the grouting and grouting construction diagram determined by the way of support design templates, template location elevation should be higher than the equipment on the base surface of at least 50mm, template must support of a tight, firm, to prevent loosening, leakage.

The 4 stirring grouting material

According to the water feed products recommended certificate than the amount of water, mixing water should be used to drinking water, the water temperature to 5 ~ 40 degrees is appropriate, can use mechanical or manual stirring. By mechanical mixing, stirring time is generally 1 to 2 minutes. The use of artificial mixing, should first join 2/3 with water and stir for 2 minutes, then add the remaining water to continue to stir until evenly, standard consistency water volume is 12%-14%.

5 grouting

Grouting construction should meet the following requirements:

(1). The slurry should be poured into the side, until the other side overflow until, in order to facilitate the discharge between the device frame and concrete foundation of air, so that the filling, not from the four sides of the grouting.

(2). The grouting after the start, must be continuous, not interrupted, and should be possible to shorten the filling time.

(3). During the grouting process should not be vibrated, when necessary, available bamboo laths were pulling the diversion.

(4). Each filling layer thickness should not exceed 100mm.

(5). The grouting long equipment or track foundation, should use the segmental construction. The length of each section is appropriate in 10m.

(6). The grouting process such as the discovery of surface bleeding phenomenon, can dispenser a small amount of dry material, sucking up water.

(7) for the foundation of equipment grouting layer thickness is greater than 1000mm in large volume, stirring grouting material according to total ratio 1:1 join 0.5mm stones, but the required test for determining the groutability can not meet the requirement.

(8). The equipment foundation grouting is completed, should be removed part shall be treated in the grouting layer before the final setting.

(9). In the grouting construction process should be avoided until the mold, filling layer by vibration and collision, so as not to damage the pending grouting hard layer.

(10) the horizontal distance between the template and the equipment of the base should be controlled at around 100mm, in order to facilitate the grouting construction.

(11) slurry filling in phenomena such as appearance, should be timely treatment.

(12) when the equipment foundation grouting amount is larger, should adopt mechanical agitation mode, in order to ensure grouting construction.

6, maintenance

(1) after grouting is finished. In 30 minutes, immediately spray curing agent or covered with plastic film and affix rockwool were maintenance, or in the grouting layer after the final set immediately sprinkler wet maintenance.

(2) in winter construction, conservation measures shall be in accordance with the "reinforced concrete construction acceptance norms" (GB50204) the relevant provisions.

(3) at different temperature curing time and removal time schedule

Daily minimum temperature (c) time of stripping (H) curing time (d)

         -10 - 0                96                    14

0 -5                             72                    10

5- 15                            48                     7

15                              24                    7


Q: Civil building insulation materials, combustion performance grade A What is the material
A grade is no material, there are rock wool, slag cotton, composite silicate insulation materials, ordinary aluminum silicate cotton, glass wool board, from the seizure of light gnawing chi chi found looking for silvery cotton wool, foam asbestos sheet, Magnesium silicate board, inorganic wall insulation mortar, and so on.
Q: 1 square mull retaining wall is equal to how many square stone
Need to block 1.02 square bar, plus loss, budget fixed injury is the case
Q: M15 in the building that the strength of mortar? What is the unit?
The mortar strength grade is determined by the compressive strength values maintained at 28 d under the standard conditions [at (20 ± 2) ° C and relative humidity of 90% or more) using cubic cubes with a side length of 7
Q: The use of cinder and other waste slag production of brick materials to enjoy what preferential policies
Construction materials, refers to the brick (excluding sintered ordinary brick), blocks, ceramic, wall, pipe, concrete, mortar, road covers, road fence, fireproof materials, refractory materials, insulation materials , Waste residue refers to mineral processing waste residue, smelting waste residue, chemical waste residue and other waste residue The proportion of slag and the proportion of raw materials used in the production of raw materials, shall be calculated in terms of weight, shall not be calculated in terms of volume
Q: Home to warm backfill, to warm the requirements of the back to fill with the strength of the C15 of the bean concrete, but the warm work that with 13 chicken gnawing flone glycoside sulfonate bag Han Li bag cement, 1 gravel (melon stone 5mm), 2 Sand concrete (gravel and sand ratio and C15 gap between the larger), concrete mixing station also tend to a reasonable proportion, said the local warm backfill is the proportion of which proportion I should require backfill concrete, confused? More
The standard answer should be: melon stone: fine sand: cement = 3: 2: 1
Q: Paste the culture of stone mortar into the construction site after the need to do material re-examination?
Commercial mortar raw materials do not have to do the re-test, but the factory certificate, factory inspection report, manufacturers send third-party testing reports, invoices and so must be complete
Q: Now what is the general use of indoor plaster material? Please advise, thank you
; according to the building standards, the general plaster For the senior plaster and ordinary plaster two levels; decorative plaster decorative plaster is through the operation of the process and the selection of materials and other aspects of the improvement, so plaster more decorative effect
Q: I expect a correct answer, not guess, the answer is best to have some evidence of the source, thank you
In the construction materials, 1: 1: 6 cement mortar concrete, in the end is the volume ratio or quality ratio? The answer to this question after the search is different
Q: Choose epoxy mortar floor, looking for epoxy mortar floor construction program
, making it a lot of manufacturers to build the ground of choice, but how should the specific construction, the following for everyone to briefly introduce
Q: Is a square meter in the number of kilograms of cement how much kg
Decoration of cement and yellow sand ratio of 1: . according to a bag of cement 50 pounds to calculate a bag of cement can shop 2 square meters of floor tiles that shop 1 ㎡ to 25 pounds of cement, according to the ratio of 1: 3 to calculate the need Yellow sand 75 pounds. So paste 1 ㎡ tiles need 100 pounds of sand cement. Tile is used 325 tons of cement, strength grade 32.. initial setting time in 1 to 3 hours, and the final condensate for 4 to 6 hours.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords