• High-strength non shrinkage grouting material of high temperature resistant type System 1
  • High-strength non shrinkage grouting material of high temperature resistant type System 2
  • High-strength non shrinkage grouting material of high temperature resistant type System 3
High-strength non shrinkage grouting material of high temperature resistant type

High-strength non shrinkage grouting material of high temperature resistant type

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
2000吨 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

A, grouting material product introduction:

Grouting material with special cement as binder, selected high strength materials as aggregates, with high flow, micro expansion, anti segregation and other material prepared.

The product has good gravity flow, rapid hardening, early strength, no shrinkage, expansive; non-toxic, harmless, non aging, on water quality and no pollution to the surrounding environment, self sealing good, rust and other characteristics. In the construction aspect with reliable quality, reduce the cost, shorten the construction period and convenient advantages. To fundamentally change the equipment base force, so that the whole load uniformly bear device, so as to satisfy all kinds of machinery, electrical equipment (heavy equipment of high precision grinder) installation requirements, is the ideal filling material without pad mounted era.

Two, the scope of application:

Grouting material is mainly used for: the anchor bolt anchor, runway repair, nuclear power equipment, Luqiao fixed reinforcement engineering, machine base, steel structure and foundation with export, equipment foundation grouting, planted two times buried reinforced, concrete structure reinforcement and reconstruction of old concrete structure, crack control, electrical and mechanical equipment installation, track and installation of steel structure, static pressure pile engineering piles, structure of the wall thickening and repair the leakage, all kinds of foundation engineering collapse grouting and various repair engineering etc..

Three, the conventional physical properties of grouting material:
Model No.
Compressive strength(MPa)

Vertical expansion rate

(%)
Fluidity

Grip strength

Round steel.

MPa
The bleeding rate(%)
Remarks
6h
1d
3d
28d
1d

The initial fluidity

30min Fluidity retention value
28d
Universal type
--
≥15
≥30
≥70
≥0.02
≥260
≥230
≥4.0
≤1.0

High strength

--
≥30
≥40
≥70
≥0.02
≥260
≥230
≥4.0
≤1.0

Early strength type

≥20
≥30
≥40
≥60
≥0.02
≥260
≥230
≥4.0
≤1.0
High early type
≥22
≥30
≥40
≥70
≥0.02
≥260
--
≥4.0
≤1.0

Super flow type

--
≥15
≥25
≥50
≥0.025
≥300
≥250
≥3.5
≤1.0
High temperature resistant type
--
≥22
≥40
≥60
≥0.02
≥260
≥230
≥4.0
≤1.0

The engineering design reference: anchor bolts for anchoring cement

380
340
290
270
The maximum set size(mm)
≤4.75
>4.75and≤16
Fluidity(mm)

The initial flow

≥380
≥340
≥290
≥270*
≥650**
30min retention value
≥340
≥310
≥260
≥240*
≥550**

Vertical expansion rate

(%)
3h
0.1~3.5
24h and 3H expansion difference
0.02~0.5
Compressive strength(Mpa)
1d
≥20
2d
≥40
28d
≥60
There is no corrosion of reinforced
NO

Qinshui rate

(%)
0



The engineering design reference

Cement based grouting material choice for anchoring bolt anchor

The spacing of the surface of the bolt and the hole wall(mm)

Cement based grouting material categories
15~50

340、290

50~100
290、270
>100
270

Cement based grouting material selection with two grouting:

Filling layer thickness(mm)

Cement based grouting material categories
5~50
380
20~100
340
80~200
290
>200
270



Four, product characteristics

"Pour 1-3 days after high early strength was as high as 30Mpa, shorten the construction period.

Since the flow field - just add water, stir, direct filling equipment foundation, mortar self construction, free vibration, ensure the grouting construction of long distance without vibration.

Casting body is used for a long time without shrinkage / micro expansion, to ensure that equipment and basic close contact, no shrinkage between the foundation and foundation, and appropriate expansion of the compressive stress to ensure the long-term safe operation of equipment.

* anti oil leakage after 30 days soaking its strength in the oil increased by more than 10%, molding, compacting, impermeability, adapt to the base oil of environmental protection. * durability 2000000 times fatigue test, 50 times freeze-thaw environment test strength has no obvious change.

"Good weather -40 to 600 DEG C is safe for long-term use

* low alkali corrosion resistance of the strict control of raw material of alkali content, suitable for alkali aggregate reaction inhibiting requirements engineering.

Five, the use of methods

1 Foundation Treatment

Cleaning equipment based on the surface, there shall be no stone, laitance, dust, dirt and other debris demoulding agent. Before grouting 24h, fully moisten the surface of equipment foundation. Before grouting 1H, should be sucked up water.

2 determine the grouting method

According to the actual situation of equipment base, selection of grouting method of corresponding flow, because of its good performance, in general, with "weight grouting" can, will paste directly from template export poured into slurry, completely rely on the self weight to leveling and filling the whole filling space; if a large area, especially the complex structure of perfusion or a very small space and distance, can use "high funnel method grouting" or "pressure grouting, grouting method" to ensure that the slurry can be fully filled every corner.

3 formwork

According to the grouting and grouting construction diagram determined by the way of support design templates, template location elevation should be higher than the equipment on the base surface of at least 50mm, template must support of a tight, firm, to prevent loosening, leakage.

The 4 stirring grouting material

According to the water feed products recommended certificate than the amount of water, mixing water should be used to drinking water, the water temperature to 5 ~ 40 degrees is appropriate, can use mechanical or manual stirring. By mechanical mixing, stirring time is generally 1 to 2 minutes. The use of artificial mixing, should first join 2/3 with water and stir for 2 minutes, then add the remaining water to continue to stir until evenly, standard consistency water volume is 12%-14%.

5 grouting

Grouting construction should meet the following requirements:

(1). The slurry should be poured into the side, until the other side overflow until, in order to facilitate the discharge between the device frame and concrete foundation of air, so that the filling, not from the four sides of the grouting.

(2). The grouting after the start, must be continuous, not interrupted, and should be possible to shorten the filling time.

(3). During the grouting process should not be vibrated, when necessary, available bamboo laths were pulling the diversion.

(4). Each filling layer thickness should not exceed 100mm.

(5). The grouting long equipment or track foundation, should use the segmental construction. The length of each section is appropriate in 10m.

(6). The grouting process such as the discovery of surface bleeding phenomenon, can dispenser a small amount of dry material, sucking up water.

(7) for the foundation of equipment grouting layer thickness is greater than 1000mm in large volume, stirring grouting material according to total ratio 1:1 join 0.5mm stones, but the required test for determining the groutability can not meet the requirement.

(8). The equipment foundation grouting is completed, should be removed part shall be treated in the grouting layer before the final setting.

(9). In the grouting construction process should be avoided until the mold, filling layer by vibration and collision, so as not to damage the pending grouting hard layer.

(10) the horizontal distance between the template and the equipment of the base should be controlled at around 100mm, in order to facilitate the grouting construction.

(11) slurry filling in phenomena such as appearance, should be timely treatment.

(12) when the equipment foundation grouting amount is larger, should adopt mechanical agitation mode, in order to ensure grouting construction.

6, maintenance

(1) after grouting is finished. In 30 minutes, immediately spray curing agent or covered with plastic film and affix rockwool were maintenance, or in the grouting layer after the final set immediately sprinkler wet maintenance.

(2) in winter construction, conservation measures shall be in accordance with the "reinforced concrete construction acceptance norms" (GB50204) the relevant provisions.

(3) at different temperature curing time and removal time schedule

Daily minimum temperature (c) time of stripping (H) curing time (d)

         -10 - 0                96                    14

0 -5                             72                    10

5- 15                            48                     7

15                              24                    7


Q:Wall whitewash with 114 mixed mortar, no lime cream can be used to replace what other materials
PUP-261 Epoxy Primer 【Model】 (G type): closed primer coated with dry concrete base at room temperature
Q:Promise insulation mortar and hollow glass beads non-polar insulation mortar What is the difference
Products from the selection of special size of the ore, in the electric furnace heating method of expansion, through the temperature and raw material blanking time of the precise control of the product surface melting, stomatal closed, irregular spherical particles, the internal porous cavity structure, The product can be used as a new building materials industry, lightweight aggregate;
Q:1: 8 cement ceramic particles to find how to set the amount of slope set
1: 8 cement ceramic particles to find slope layer, according to the amount of 1: 8 cement vermiculite with the amount of vermiculite in the calculation (that is, each cubic 1: 8 cement ceramsite, cement 0.175t, ceramic 1.02 cubic). 1: 8 cement ceramsite to find slope layer cover roof insulation layer quota, and then adjust the material spread, or the preparation of supplementary quotas. The quota is a standard that sets the amount of resources consumed by a unit of qualified products in a reasonable manner and rational use of materials and machinery. It reflects the level of social productivity in a given period. For each construction project, the amount of labor is measured, including basic and other labor. Plus the material of this project, including basic materials and other materials. For the labor unit price, is based on the local labor value of different types of work, the value of the material is based on the pre-market price to develop the budget price.
Q:Brick and concrete structure and frame structure in the force system, the use of building materials and the scope of the three aspects of the difference. Thank you ~ ~ very anxious
Masonry structure: gravity load transfer floor, roof panel → wall → foundation → foundation → crust
Q:M10 mortar mix design and raw material test a total of how much material?
Should be enough In fact, the laboratory is not the number of the main time in the inspection when the cement should be sieved
Q:In accordance with the instructions on the waterproofing agent package with a high proportion of sand but the decoration master said that is not very puzzled more
Do a good job to fight forging toddler pedal Bang Quan burst water to use polyurethane and polypropylene you that is a high-grade cement, but one year will leak leh hh try it
Q:It seems to see a piece of information is 30 tons of twitch 紶 陛 cough pile correction point hole bowl film once, I now do are mortar test block test, ask the master, it is best to check that is not the supervision Sick of more
The key to negotiate with the supervision unit
Q:Bathroom to do with the East Yuhong waterproof material, but also with waterproofing agent to do waterproof layer?
This is not necessarily see you use the quality of the material, if you do not worry can do, the East Rainbow is just a waterproof material brand, different home improvement parts need to choose a different waterproof material, the bathroom suitable for rigid waterproof,
Q:Why brick-based project man-made masonry mortar can not modify the market price
It should not be said that only the masonry mortar in the brick foundation can not modify the market price
Q:How to install squatting pan? Need to pay attention to what matters?
We think that it is safe and hygienic! We choose "safe squatting pan" to buy

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords