HG32 Concrete Placing Boom
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1, The concrete placing boom is used widely for horizontal concrete placing at roof of buildings, by using which the overall working efficiency of the project can be promoted.
2, Stationary type & Self climbing type available
3, The machine is fully hydraulic driven nd canb e slewed 360 degree
4, The modes of operation: radio remote control and cable remote control
HG32 | ||
Delivery pipe dimension (outside diameter × thickness) (mm × mm) | Φ133×4 | |
Delivery hose dimension (inside diameter × length) (″×mm) | 5″×3000 | |
Radius of placing boom (m) | 31.7 | |
Stationary height (to the joint between the end of the boom and Swivel table) (m) | 22.9 | |
Three hydraulic foldable arms | 1st section | 14.5m |
2nd section | 9.2m | |
3rd section | 8.0m | |
Boom articulation | 1st section | -4.2°~+82.5° |
2nd section | 0°~180° | |
3rd section | 0°~180° | |
Slewing range (°) | 360 | |
Power of motor (kW) | 15 | |
Pressure of hydraulic system (MPa) | 28 | |
Type of hydraulic oil | ESSO NUTO H46 | |
Interval of climbing frame (m)
| Climbing | 3.0~4.2 |
Placing concrete | 6.0~8.4 | |
Resting | ||
Mode of operation | 1. cable remote control 2. radio remote control | |
Power | 380V/50Hz | |
wind speed | Placing concrete | ≤60 km/h |
Climbing | ≤28 km/h | |
working temperature | 0~48℃ |
- Q: What is the difference between concrete pump truck and concrete distributor in construction?
- Pump car and car pump pump, pump transmission range is relatively large, the past can be connected pipe (in pumping pressure permitting), malpractice is relatively heavy, concrete pouring, people need to arrange to remove pipe, guard, pump handle up too much trouble
- Q: How to install and use the distributor?
- Install the fuse according to the electricity consumption. No steel, aluminum or zinc wire shall be used instead of the fuse.
- Q: What are the acceptance items of concrete spreader?
- Good mechanical properties, meet the technical standards in the specification, is strictly prohibited in the pressure pipe and tubing in open pipe joint, no end of the hose, and let the arm pull down another rigid connection pipeline, rotary process, no brakes or do reverse operation in the machine when not parked
- Q: How to fit the cloth rod of the distributor?
- When the cloth rod is placed on the frame, the leg is compacted by a support pipe, and the device is not necessary when being arranged on the floor of the building
- Q: what's the difference between the fabric pump and boom pump?
- The inner climbing type distributor is not limited by height
- Q: What are the weekly inspection items for concrete spreader?
- The conveying straight pipe and the 90 degree bent pipe on the rack shall be rotated 180 degrees after the completion of a certain amount of transportation so as to increase the service life.
- Q: What is the Hand operated concrete distributor?
- It effectively solves the problem of pouring material into the wall, and plays an important role in improving the construction efficiency and reducing the labor intensity
- Q: What are the monthly inspection items of the movable concrete spreader?
- Check whether the rotary limiter works properly and check the coupling of the motor
- Q: How to distinguish tower type distributor and general distributor?
- The big arm of tower type distributing machine is frame type, and the small square pipe is welded into a stable square frame, so that the big arm is firm and incomparable
- Q: What's the design plan of the concrete spreader?
- The loading or unloading of the belt conveyor is completed by the distributor without the use of auxiliary equipment such as cranes. The four section folding telescopic lattice truss fabric tape machine fabric tape machine design for a scalable (multiple) tape machine section four nested truss, by wire rope linkage, telescopic friction wheel and eccentric guide slide
Send your message to us
HG32 Concrete Placing Boom
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords